Bulandshahr Development Authority Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Bulandshahr Development Authority Tender
Eprocure
Opening Date3 Oct 2020
Closing Date11 Nov 2020
Tender Amount₹ 1,91,87,318 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 3,80,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_BDAB_517490_7Bid Award Id
ViewTender No
7000/BDA/20-21 Dt 26-09-2020 TBTender Authority
Bulandshahr Development Authority ViewPurchaser Address
-Website
http://http://bdabulandshahar.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Bitumen tack coat over painted surface @ 0.70 Kg/M2 including cost of bitumen VG-10 including maintenance of side pateries & watering, ramming during operation drum including supply of all materials, labour machines, fuel wood and T&P etc. required for proper completion of work as per MORTH specification No. 502 and as per direction of E/I. [Analysis]
3460
-
22.1
... More
ROAD SAFETY [PART- C]
-
-
-
... More
Painting or varnishing work in Large areas or new work with one coat (upto one sqm) of primer & two coats of approved superior quality ready mixed paint including supply of all Materials,labour,tools & plants etc. required for proper completion of the work.Paint to be used should confirm the ISI no.103-1950. [SI No.644+645] S.O.R.-2020
1862
-
74
... More
Providing and fixing post delineators made of ABS round body fitted with 2 nos 100 mm dia high reflective reflectors and mounted on MS pipe of 65 mm dia duly powder coated anti-rust and anti theft steel to be installed as per direction of Engineer-in-charge [DSR : 16.65/2018]
30
-
593.2
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars [DSR : 5.22.1]/2018
124
-
6817
... More
Cement concrete with 4 cm gauge approved stone ballast, coarse sand and cement in the proportion 8: 4: 1 in foundation and undred floors, including supply of all material, labour and T & P etc. required for proper completion of the work. [S.I. No. - 281] SOR-2020
133
-
5820
... More
Providing, laying, spreading and compacting graded stone aggregates to Wet Mixed Macadam (WMM) specification including premixing the material with water at OMC in mechanical mixer (Pug mill), carriage of mixed material by tipper to site, laying in uniform layers in sub- base \ course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100 KN weight to achieve the desired density including lighting, barricading and maintenance of diversions etc. as per table 400.11 & 400.12 and technical specifications clause 406.
865
-
3817.2
... More
Excavation in foundation in soil mixed with moorum, shingle, kankar, requiring the use of special tools & plant including lift upto 1.50 m and lead upto 30 m and including watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by E/I upto a distance of 30 m from the foundation trenches. [S.I. No. - 252]/2020
133
-
95
... More
R.C.C. work with cement, approved coarse sand and 20mm gauge stone grit in proportion of 1 :1.5 :3 (one cement : 1.5 c.sand : 3 stone grit of 20 mm nominal size ) in Wall & Column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24B.W.G.G.I. binding wire and necessary centering and shuttering etc and also including supply of all materials labour & T&P etc. required for proper completion of works. [S.I. No. 288 ]
316
-
8778.7
... More
Providing and laying bituminous concrete with 60-90 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG -30 @ 5.50 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
520
-
9198.3
... More
P/L of hot applied Thermoplastic compound 2.5 mm thick including refletrorising glass beads @250 gm./sqm, Area, thickness of 2.5 mm is exclusive of surface applied glass beads as per I.R.C. 35. The Finish surface to be level, uniform and free from streaks and holes, Composition of thermo plastic material shall be as per table 800-3 of clause 803 of MORTH including cost of all material, labour, T&P. etc. require for proper completion of work as direction by Engineer-In-charge. [S.I. NO. : 19.01/2020] New Items
900
-
520
... More
Bitumen tack coat over painted surface @ 0.20 Kg/M2 including cost of bitumen VG-10 including maintenance of side pateries & watering, ramming during operation drum including supply of all materials, labour machines, fuel wood and T&P etc. required for proper completion of work as per MOT specification No. 502 and as per direction of E/I. [Analysis]
12950
-
7.5
... More
Construction of granular sub base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing with mix in place method with rotavator at OMC and compacting with smooth wheel roller to achieve desired density complete as per technical specification clause 401. [A.R.]
1040
-
3366.5
... More
WIDENING AND STRENGTHENING OF ROAD [PART- B]
-
-
-
... More
Supply & Fixing of Reflective raised Pavement maker (Cat Eye) Type X-ASTMD-4956-04 Avery Dennison/3M (USA Make) having moulded body of polycarbonate ASA HIPS or ABS able to support a load of 13.635M.T. tested in accordance with ASTMD 4280 type H and other requirement mentioned in MoRT&H circular, its reflective lens made of micro prismatic lens (Capable of providing total internal relflection of light) electronically welded to the body. The length, height and width of the body shall not exceed 130 mm, 20 mm and 105 mm respectively. The area of each reflective surface shall not be less than 13 Sq.cm. on each side sloping at the angle of 35 + 5 to specification of category A of MoRT & H circular no. RW/NH33023/10/97-DO-III dated 11.06.97 lenses shall be moulded of methyl methecrylate conforming to ASTMD 788 or equivalent with 7 years warranty. Rate shall be inclusive of all taxes, Royalty, VAT etc.. all T&P/machine material and labour required for proper completion of the work [S.I. No. - New Item No.9 (Traffic Sign)/PWD. SOR- 2016
2000
-
312
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements