Bulandshahr Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Bulandshahr Development Authority Tender
Civil And Construction
Eprocure
Opening Date22 Nov 2018
Closing Date4 Dec 2018
Tender Amount₹ 20,30,149 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 41,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_BDAB_275457_1Bid Award Id
ViewTender No
8493/BDA/18-19/ Dt 20-11-2018Tender Authority
Bulandshahr Development Authority ViewPurchaser Address
-Website
http://http://bdabulandshahar.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
RCC work with cement approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:1.5:3 in R.C.C. footing and Column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGGI binding wire including centering and shuttering etc. all materials labour, Tools & Plants etc. required for proper completion of the work including cost of binding wire the rates excludes making of drip course which shall be paid extra. [S.I. No. - 289]
-
-
-
G.F.
8.5
-
8000
F.F.
7.5
-
8080
RCC work with cement approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:1.5:3 in R.C.C. Beem excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGGI binding wire including centering and shuttering etc. all materials labour, Tools & Plants etc. required for proper completion of the work including cost of binding wire the rates excludes making of drip course which shall be paid extra. [S.I. No. - 286 +diff. of cost of cement]
-
-
-
G.F.
16
-
8100
F.F.
12
-
8181
R.C.C. work with cement, approved coarse sand and 20mm gauge stone grit in proportion of 1 :2 :4 (one cement : 2 c.sand : 4stone grit of 20 mm nominal size ) in lintel excluding supply of reinforcement and its bending but including its fixing and binding the same with 24B.W.G.G.I. binding wire and necessary centering and shuttering etc and also including supply of all materials labour & T&P etc. required for proper completion of works. [S.I. No. 283]
-
-
-
G.F.
1
-
7000
F.F.
0.7
-
7070
RCC work with cement approved coarse sand and 2 cm gauge approved stone grit in proportions of 1 : 1½ : 3 in slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGGI binding wire including centering and shuttering etc. all materials labour, Tools & Plants etc. required for proper completion of the work including cost of binding wire the rates excludes making of drip course which shall be paid extra. (S.I. No. 284) (New Item)
-
-
-
G.F.
15.5
-
7700
F.F.
15.5
-
7777
M-150 class brickwork in 1: 4 one cement and six coarse sand mortar in foundation and plinths including supply of all materials, labour and T & P etc. required for proper completion of the work. [S.I. No. - 305(a)]
46
-
4430
M-150 Brick Work in 1:4(one cement & Four coarse sand) mortar in superstructure including necessary cutting and moulding of bricks as required thickness of walls not to be less than one brick includind supply of all materials, Labour, T&P etc. required for proper completion of the work. [SI.No.305(a)+309+310]
-
-
-
G.F.
55
-
4970
F.F.
26.5
-
5019.7
M.S. tor steel or plain in plain work such as RCC or RB work including bending for proper shape and including supply of steel and its wastage and bend hooks and authorised overlapping shall be measured and including cost binding wire.
[SI.No.504]
95
-
5600
12 MM thick plaster with cement and corse sand in 1:4 over brick work minimum thickness not to be less than 1 cm. Including supply of all materials, labour, Tools & Plants etc. required for propertion of the work.
[S.I. No. - 584 New Item]
-
-
-
G.F.
307
-
165
F.F.
223
-
166.65
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements