Bulandshahr Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Bulandshahr Development Authority Tender
Civil And Construction
Road Construction
Eprocure
Opening Date16 Jun 2022
Closing Date22 Jun 2022
Tender Amount₹ 5,99,000
Costs
EMD
₹ 60,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_BDAB_708554_1Bid Award Id
ViewTender No
1302/BDA/22-23 Dt. 15-06-2022 SBTender Authority
Bulandshahr Development Authority ViewPurchaser Address
-Website
http://http://bdabulandshahar.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5km lead complete (Cattle manure measured in stacking will be reduced by 8% for payment). 2.3/D.S.R. 2018
81.4
-
181.53
... More
Spreading of sludge, dump manure or/and good earth in required thickness (cost of sludge, dump manure or/and good earth to be paid separately). 2.8/D.S.R. 2018
81.4
-
27.55
... More
Fine dressing the grounding. 2.7/D.S.R. 2018
3256
-
1.9
... More
Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20%: 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately): Holes 45 cm dia and 45 cm dep. 2.14.4/D.S.R. 2018
240
-
6.65
... More
Grassing with selection No-1 ‛Doob’ grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thicks lawn free from weeds and fit for mowing including supplying good earth if needed (the good earth shall be paid for separately). In rows 5cm apart in either direction. 2.10.1/D.S.R. 2018
2000
-
9.2
... More
Providing and fixing of selection No-1 Doob Grass in turf well rooted free from weeds including all royalty, loading, unloading & carriage and filling of dippretions, watering and maintenance for one month. 2.34/DSR 2018 Preparation of beads for heading and shrubbery by excavating 60cm deep and trenching the excavated bass to a further depth of 30cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, levelling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50m lift upto1.5m complete (cost of sludge, manure or extra earth to be paid for separately) 2.13/D.S.R. 2018
900
-
73.6
... More
Supply of selection “one” Doob grass in turf well rooted free from weeds at site including royalti & carriage. 2.35/DSR 2018
400
-
50.8
... More
Preparation of beads for heading and shrubbery by excavating 60cm deep and trenching the excavated bass to a further depth of 30cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, levelling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50m lift upto1.5m complete (cost of sludge, manure or extra earth to be paid for separately) 2.13/D.S.R. 2018
60
-
115.2
... More
Providing and stacking of Tecoma gaudichaudi of height 60-75 cm. with 5-6 branches in p.bag of size 25 cm as per direction of the officer-in-charge. 8.68/DSR 2018
50
-
48
... More
Providing and stacking of Calliandra, emarginata of height 45-60 cm. in earthen pot of size 20 cm as per direction of the officer-in-charge. 8.5/DSR 2018 (Deduction Earthen Pot Rs. 35.00 - 20.00 = 15.00)
50
-
15
... More
Providing and stacking of Hamelia patens of height 30-45 cm. with 3-4 branches in poly bags of size 20 cm as per direction of the officer-in-charge. 8.31/DSR 2018
50
-
20
... More
Providing and Displaying Furcaira variegated well developed with fresh &
healthy foliage 8 to 10 leaves in 30 cm Earthen Pot as per direction of the
officer-in-charge.. 5.31/DSR 2018
20
-
196.8
... More
Providing and displaying of Phoenix palm having ht. 75 cm to 90 cm with
10 to 15 or more leaves, well developed, fresh and healthy in 25 cm size of
Earthen pot/Plastic pot & as per direction of the officer-in-charge.. 3.74/DSR 2018
20
-
196.8
... More
Providing and stacking of Bauhinia tomentosa (yellow) of height 60-75 cm. in earthen pots of size 20 cm as per direction of the officer-in-charge.. 8.20/DSR 2018 (45 - 20 = 25)
50
-
25
... More
Providing and stacking of Ficus panda of height 30-45 cm. with 3-4 branches and healthy foliage in p.bag of size 20 cm as per direction of the officer-in-charge.. 8.25/DSR 2018
300
-
35
... More
Providing and Displaying Topiary of Casuarina fresh & healthy having 5 to
6 specific shape and size ball well developed 195 to 210 cm ht. in 40 cm
Cement Pot as per direction of the officer-in-charge. 5.41/DSR 2018 [1076.25 -209.80 = 866.45]
15
-
866.45
... More
Providing and stacking of Clerodendrum inerme of ht. 20 cm to 30 cm multi
branched in 15 cm size of Earthen Pot/Plastic Pot & as per direction of the
officer-in-charge. 6.7/D.S.R. 2018 [20.50 - 15.00 = 5.50]
1400
-
5.5
... More
Providing and stacking of Bignonia venusta (Golden shower) of height 30
cm to 45 cm. in 20 cm size of Earthen pots / Plastic pots & as per direction
of the officer-in-charge. 9.3/D.S.R. 2018
200
-
40
... More
Providing and stacking of Quisqualis indicia of height 30 cm to 45 cm. in
20 cm size of Earthen pots / Plastic pots & as per direction of the
officer-in-charge. 9.12/D.S.R. 2018
100
-
25
... More
Cost of plantation per Shrub. 2.57.2/D.S.R. 2018
240
-
1.85
... More
Cost of plantation per Hedge . 2.57.3/D.S.R. 2018
1700
-
1.25
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements