Bulandshahr Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Bulandshahr Development Authority Tender
Civil And Construction
Road Construction
Eprocure
Opening Date16 Jan 2024
Closing Date29 Jan 2024
Tender Amount₹ 14,86,000
Costs
EMD
₹ 29,800Document Cost
₹ 950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BDAB_881286_2Bid Award Id
ViewTender No
973/BDA/23-24 Dt.9-1-2024 SBTender Authority
Bulandshahr Development Authority ViewPurchaser Address
-Website
http://http://bdabulandshahar.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
12 mm thick plaster with cement and coarse sand in 1:4 over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. [ S.I. No. – 585 (New Items- 13.11)]2022
361
72200
200
Finishing wall with weather coat by premium acrylic exterior paint applied @ 1.67 ltr/10 sqm (Asian or Berger Brand) of approved make and quality on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufacturer exterior primer applied @ 2.20kg/10 sqm after thoroughly brushing the surface free from mortar dropping and other foreign matters and sand papered smooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.(sor 15.23 new item)2022
1000
140000
140
Painting or varnishing work in small areas or new wood work with one coat upto but for every coat after first coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. Paint to be used should confirm the ISI no. 103-1950. [641+642]2022
125
14375
115
Cast Cement Concrete work with Cement approved coarse sand and 2 cm.(3/4") gauge approved stone ballast in the proportions of 1:1½:3 in drain cover lighter beam excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W. G.G.I., binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc. required for proper completion of the work.Excluding cost of Binding wire.[282A]2022
34
282540
8310
Mild steel (Tor steel or plain) or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised overlapping shall be measured up to floor two level.(DSR 5.22.1/2021)
54
398520
7380
Providing wall putty on old surface with approved quality material of berger/J.K./Birla or similar make 2 coats new item [SI.No.-15.27] SOR-2022
361
27075
75
3D lighting letter (Size 8'X4')
430
279500
650
3D logo (Size 18"X18")
36
18000
500
ACP Board with iron pipe
198
128700
650
Green Grass
90
40500
450
Foundation making charge
1
25000
25000
Installation charge of board
1
5000
5000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements