Bulandshahr Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Bulandshahr Development Authority Tender
Agriculture or Forestry Works
Eprocure
Opening Date16 Jun 2022
Closing Date22 Jun 2022
Tender Amount₹ 31,88,000
Costs
EMD
₹ 3,19,000Document Cost
₹ 1,475Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_BDAB_708562_1Bid Award Id
ViewTender No
1302/BDA/22-23 Dt. 15-06-2022 TBTender Authority
Bulandshahr Development Authority ViewPurchaser Address
-Website
http://http://bdabulandshahar.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20%: 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately): Holes 45 cm dia and 45 cm dep. 2.14.4/D.S.R. 2018
8000
-
6.65
Supply of bamboo stick at site 5´-6´ height for staking of plants.
2000
-
5
Chlorpyriphos 20% E.C/Lindane 20% E.C 7022/DSR 2018
200
-
153.6
Providing and stacking of Bougainvillea (Variety Butiana, Lady Mary Baring, Mahara,Mohan,Scarlet Queen, Variegated, Glabra Formosa, Peruviana Odissi, Paratha, Subhra,Thimma, Spectabilis L.N Birla, Refulgens) of height 30 cm. to 45 cm. with 2-3 branches in 20 cm size of Earthen pots/Plastic pots & as per direction of the officer-in-charge. (Deduction Earthen Pot Rs. 40.00 - 20.00 = 20.00)
1500
-
20
Providing and stacking of Tecoma gaudichaudi of height 60-75 cm. with 5-6 branches in p.bag of size 25 cm as per direction of the officer-in-charge. 8.68/DSR 2018
1500
-
48
Providing and stacking of Calliandra, emarginata of height 45-60 cm. in earthen pot of size 20 cm as per direction of the officer-in-charge. 8.5/DSR 2018 (Deduction Earthen Pot Rs. 35.00 - 20.00 = 15.00)
1000
-
15
Providing and stacking of Nerium oleander (kaner) dwarf of height 30-40 cm. in earthen pot of size 20 cm as per direction of the officer-in-charge. 8.51/DSR 2018 (Deduction Earthen Pot Rs. 40.00 - 20.00 = 20.00)
1000
-
20
Providing and stacking of Thevetia nerifolia of height 30-45 cm. with 3-4 branches in poly bags of size 20 cm as per direction of the officer-in-charge. 8.73/DSR 2018
1000
-
35
Providing and stacking of Plumeria alba of height 120-135 cm. with 2-3 branches in bags of size 30 cm as per direction of the officer-in-charge. 7.69/DSR 2018
400
-
115.2
Providing and stacking of Ficus infectoria (Pilkhan) of height 150-165 cm. in big polybag of size 25 cm as per direction of the officer-in-charge. 7.32/DSR 2018
400
-
65
Providing and stacking of Hamelia patens of height 30-45 cm. with 3-4 branches in poly bags of size 20 cm as per direction of the officer-in-charge. 8.31/DSR 2018
1000
-
20
Providing and stacking of Hibiscus rosasinensis of height 60-75 cm. with 5-6 branches in p.bag of size 25 cm as per direction of the officer-in-charge. 8.36/DSR 2018
1000
-
45
Providing and stacking of Azadirachta indica (Neem) of height 120-130cm in big polybag of size 25 cm as per direction of the officer-in-charge. 7.5/DSR 2018
400
-
65
Providing and stacking of Delonix regia (Gulmohar) of height 150-165 cm. in big poly bags of size 25 cm as per direction of the officer-in-charge. 7.24/DSR 2018
400
-
60
Providing and stacking of Eugenia jambolana (Jamun) of height 150-165 cm. in big poly bags of size 25 cm as per direction of the officer-in-charge. 7.83/DSR 2018
400
-
75
Complete maintenance of Timber and shrubs (outside garden features), jobs like making of basin at regular interval, application of fertilizer etc, (excluding the cost of material which shall be supplied by the department) and as per direction of officer in charge. (One Mali required for 1200 nos. plants per month) as directed by officer in charge. (Qty for 24 month x 10000 nos per month = 240000 nos) 2.43/DSR 2018
240000
-
8.4
Providing and wartering of plants through water tanker of Horticulture features i.e. lawn, tree, shrubs, hedge/edge, ground cover etc. at the site of work. Water tanker having 5000 lit. capacity with one labour for watering i/c cost of water, filling of tanker, wartering at site with all leads and lifts as per direction of officer-in-charge. (......../500nos = 1.02 each per month) (Rate for 18 month & 1.02 per month per plant and three times in one month) (Qty for 18 month x 10000 nos per month = 180000 nos) 2.53 DSR 2018
180000
-
3.06
Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unsaverieable material’s as per direction of officer in charge (excluding cost of plant & water) 2.57/DSR 2018] 2.57.1 Cost of plantation per Tree
2000
-
3.75
2.57.2 Cost of plantation per Shrub
8000
-
1.85
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements