Bareilly Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Bareilly Development Authority - BDA Tender

Works
Eprocure
Opening Date27 May 2020
Closing Date17 Jun 2020
Tender Amount₹ 11,37,35,409 
Notes
Download

Costs

Summary

Construction Of 45 Mt Wide Conncecting Road Between Dohra Road And Bisalpur Road, Bareilly (excluding Both Side Service Road)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in cutting or in embankment in ordinary soil, excavation to be in the regular pits not exceeding 0.5m in depth and earthwork in embankment to be in 20cm. Layers including ramming and dressing the surface to required levels and slopes and also including 1.5 lift and 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. Distance as directed by the engineer in charge (Excluding Royalty) S.No. 253

3960

-

115

... More
Earth work in filling in ordinary soil including leveling dressing and ramming and also including cartage 4.00 Km distance Including loading unloading cost of earth but excluding royalty etc. all complete as per direction of E/I (S.I. 253+ cartage+cost of earth etc)

18200

-

315.7

... More
Supply and stacking of good earth for sub grade preparation as per DSR item no. 16.3.9 all complete excluding royalty as per table No.300-2 of MORTH

15000

-

392.83

... More
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavatiing earth to an average of 22.5 cm depth dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. As per DSR Item No.16.1

30400

-

138.72

... More
Extra for machanical compaction including of levelling, dressing, watering & compacting the soil to achieve 95% proctor density etc. all complete (S.I. 253a)

15750

-

21

... More
Construction of granular sub base (G.S.B.) by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with motorised grader at OMC, and compacting with vibratory roller to achieve the desired density, compete at per clause 401. (Analysis Rate)

3955

-

3404

... More
First layer of WMM 125 mm thick Providing laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material to site laying in uniform layers with paver finisher in sub base/ base course on well prepared surface and compcting with vibratory roller to achieve the desired density. complete in all respect. as per MORTH specification 406. (Analysis Rate)

2472

-

3650

... More
Second layer of WMM 125 mm thick Providing laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material to site laying in uniform layers with paver finisher in sub base/ base course on well prepared surface and compcting with vibratory roller to achieve the desired density. complete in all respect. as per MORTH specification 406. (Analysis Rate)

3800

-

3650

... More
Providing and applying bitumen emulsion tack coat with butumenus grade VG-10 over prepare surface of granuler base(primer coat) including cleaning of road sruface sand spreading tack coat @ 0.50 Kg/ sqm using machanical means as per morth (Morth 502) (Analyis Rate)

26690

-

20

... More
First layer of DBM 60mm thick Providing and laying dense graded bitumenous concrete(DBM) with (VG-30) 100-120 TPH batch type HMP prooducing an average output of 75 tonnes per hour using brushed aggregates of spcified gading premixed with bitumenous binder @ 4.0 % to 4.50% by weight of total mix and filler transpored to site laid over a previous prepared surface with paver finisher to the required grade level and alingment and rolled as per clause 501.6 and 501.7 to achieve the desire compaction all complete as per morth specification morth-504(analysis rate)

1602

-

8504

... More
Second layer of DBM 55mm thick Providing and laying dense graded bitumenous concrete(DBM) with (VG-30) 100-120 TPH batch type HMP prooducing an average output of 75 tonnes per hour using brushed aggregates of spcified gading premixed with bitumenous binder @ 4.0 % to 4.50% by weight of total mix and filler transpored to site laid over a previous prepared surface with paver finisher to the required grade level and alingment and rolled as per clause 501.6 and 501.7 to achieve the desire compaction all complete as per morth specification morth-504(analysis rate)

1468

-

8504

... More
Providing and applying bitumen emulsion tack coatwith butumenus grade VG-10 over bituminious surface of including cleaning of road sruface sand spreading tack coat @ 0.20 Kg/ sqm using machanical means as per morth (Morth 503) (Analysis Rate)

53375

-

8.5

... More
Providing and laying bitumenous concrete (BC) 50 mm thick with (VG-30) 100-120 TPH batch type HMP prooducing an average output of 75 tonnes per hour using brushed aggregates of spcified gading premixed with bitumenous binder 60/70 grade @ 5.0 % of mix & filler transpored the hot mix to site laying with a hydrostatic paver finisher with sensor control to the required grade level and alingment and rolling with smooth wheeled vibratory and tendom rollers as per MORTH specification clause no. 509 complete in all respcet. Analysis Rate

1340

-

9298

... More
Providing and applying 2.5mm thick road marking strips (retro reflective of specified shade/colour using hot themoplastic material by fully/semi automatic paint applicator machine fitted with profile shoe glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P cleaning the road surface of all dirt, seals, oil grease and foreign material etc. complete as per direction of Engineer In charge and accordance with applicable specifications. DSR-16.62

1226

-

537.43

... More
Excavation in foundation in ordinary soil, loam, clay or sand including lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the Engineer in charge upto a distance of 30 m from the foundation trenches. (S.I. 251) SOR 2018

850

-

135

... More
Cement concrete with 4cm gauge brick ballast, fine sand of 1.25 fineness modulous and cement in the proportion of 8:4:1 including supply of all materials, labour and T&P etc. required for proper completion of the work (S.I. No-275) SOR 2018

285

-

3610

... More
First class brick work with 1:4 cement and coarse sand in foundation plinth including supply of all material, labour T&P etc. required for the proportion of the work as per S.I. 305 SOR 2018

975

-

5010

... More
12mm thick plaster with 1:4 ( one part cement & four parts of coarse sand of 2.75 F.M.) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, T&P etc. required for proper completion of the work (S.I. No-584(i) SOR 2018

6354

-

175

... More
Concrete with 2cm guage stone grit, coarse sand and cement in proportion of 4:2:1 including supply of all material, labour and T&P etc. required for proper completion of the work (S.I.279(i))

65

-

7190

... More
Provding and fixing Glow studs(Cats Eye) af size 100x 20m made of heavy duty body shall be moulded ASA (Acrylic styrene Acryloetrite ) or HIP (High impact polystyrene ) of ABS having electronically welded micro- prismatic lens with abrasion resistant coating as approved by Engineer in charge. The glow stud shall support a load of 13635 Kg tested in accrodance with ASTM D4280. The slope of retro- reflective surface shall be 35(+/-5) degress to base. The reflective panels of both sides with at least 12 cm of reflective area up each side. The luminationce intensity should be as per the specification and shall be tested as described in ASTM I:809 as recommended in BS :873 part 4 :1973. Teh studs shall be fixed to the Road surface using the adhesive conforming to IS as per procedure recommended by the manufacturer complet and as per direction of engineer - in - charge (S.I. 16.50 DSR 2018)

1300

-

173.81

... More
Providing and applying of Birla putty of 2mm thickness DSR 13.26/By SOR page No. 20

8475

-

113

... More
Applying 2 or more coat weather coat and exterior surface with acrylic weather paint approved quality including all material labour T&P etc. all complete Berger, Asian etc. all complete (13.46.1)

8475

-

92

... More
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with mortar 1:3 (1 cement: 3 coarse sand), including makking joints with or without grooves (thickness of joints except ar sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer in charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer in charge) DSR 2018 (16-69)

285

-

7412.52

... More
(CAST IN SITU) Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering , shuttering, finishing and reinforcement-All work upto plinth level: 1:1.5:3 (M-20 MIX)(1 cement :1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) S.No.5.1.2

415

-

6830.34

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in as over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. (S.I. No-504) SOR 2018

326

-

6250

... More
Centering and shuttering including strutting, propping etc and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinkth and string courses etc. Extra for shuttering in circular work(20% of respective centering and shuttering items) Sno. 5.9.14 + 5.9.2 DSR 2018

6180

-

647.04

... More
Providing and laying non pressure NP-2 class (light duty) RCC pipe with coller jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cment: 2 fine sand) including testing of joint etc complete 19.6.3 DSR 2018

-

-

-

... More
250mm dia RCC pipe

500

-

667.65

... More
1- In figure …………………………………………% ABOVE/BELOW

-

-

-

... More
2- In words……………………………………………………………………

-

-

-

... More
(Rate will be coded in percentage basis only, above and below must be in words)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.