Bareilly Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Bareilly Development Authority - BDA Tender
Civil And Construction
Eprocure
Opening Date27 May 2020
Closing Date17 Jun 2020
Tender Amount₹ 6,83,66,600
Costs
EMD
₹ 14,00,000Document Cost
₹ 12,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_BDAUP_474605_1Bid Award Id
ViewTender No
1/20T/2Tender Authority
Bareilly Development Authority ViewPurchaser Address
-Website
http://http://www.bdainfo.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the Engineer in charge upto a distance of 30 m from the foundation trenches. excluding royality (S.I. 251)
1387
-
135
... More
Concrete with 4 cm guage brick ballast, fine sand 1.25FM and cement in proportion of 12:6:1 in foundation and under floor including supply of all material labour and T&P etc. required for the proper completion of the work (S.I. 273)
95
-
3230
... More
RCC work with cement approved coarse sand and 2cm guage approved stone grit in proportion 1:1½:3 (M-20 MIX) in Raft foundation and footing excluding supply of reinforcedment and its binding but including its fixing and binding the same with 24 BWGGI bindig wire and inlcuding necessary centering and shuttering etc and also including supply of all material labour T&P required for the proper completion of the work, bindig wire cost being included in the item S.I. 287 UPPWD SOR 01-10-18
112
-
7390
... More
Providing and laying cement concrete in retaing walls, return walls, walls (any thickness) including attached plasters, coloumn, piers abutments, pillers upto floor five level excluding the cost of centering and shuttering and finishing in 1:1½:3 (M-20 MIX) (one cement: 1½ coarse sand:3graded stone aggrigate 20mm nominal size (S.I. 5.2.2 DSR 2018)
247
-
8235.39
... More
Centering & shuttering including strutting propping etc. and removal of form work for walls (any thickness) including attached plateris, butteresses plinth and string couse etc. DSR 2018 S.I. 5.9.2)
4928
-
539.2
... More
R.C.C. work with cement approved coarse sand & 2 cms gauge approved crushed stone grit in proportion of 1:1½:3 (M-20 MIX) in slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BW GGI binding wire and including necessary centering & shuttering etc. required for proper completion of work. (S.I. 284a)
13
-
8140
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in as over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. (S.I. No-504)
235
-
6250
... More
12mm thick plaster with 1:4 ( one part cement & four parts of coarse sand of 2.75 F.M.) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, T&P etc. required for proper completion of the work (S.I. No-584(i)
450
-
175
... More
Cement concrete with 2cm gauge approved stone grit, coarse sand and cement in the proportion of 4:2:1 (M-15 MIX) including supply of all materials, labour and T&P etc. required for proper completion of the work (S.I. No-279(i)
23
-
7180
... More
supply of following dia U P.V.C. pipes of 6 Kg/ cm2 working pressure confirming to IS: 4985/2000 with suitable coupling/socket and cement solutions etc. complete in all respects. Trupati/ Astral/Prince/Supreme make ISI PVC pipe only
-
-
-
... More
110mm OD
67
-
348
... More
Providing and fixing 25mm CPVC pipe (S.I. 18.10.3 UPPWD SOR 01-10-18)
200
-
237
... More
During laying of new CPVC water pipe line, P/F house connection fitting to main pipe line excluding cost of connection pipe but including cost of plumber, labour and fittings required of CPVC (A/R) CB 1008
50
-
350
... More
Supply and filling 40mm gauge first class brick ballast with compaction, lavelling all complete.
71
-
1000
... More
Mild steel or iron work in heavy sizes such as trussus, builts up gates, doors, frame, recxord racks roof work, gates etc. wrought to required form including drilling holes revetting or belding where necessary, and also including supply of steel, lolts, nuts etc and their fixing of proper completion of the work (S.I. 503)
0.5
-
6700
50
-
295
... More
Disposal of malwa upto 5Km inlcuding loading unloading all complete (S.I. 231a)
971
-
90
... More
PART-B
-
-
-
... More
Particular
-
-
-
... More
Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 M and lead upto30M including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the E/I upto a distance of 30m from the foundation trenches excluding royality (S.I. 251 UPPWD SOR 01-10-18)
13750
-
135
... More
Concrete with 4cm guage stone ballast, coarse sand of 2.75 fineness modulous and cement in proportion of 8:4:1 (M-10 MIX) in foundation and under floor, including supply of all material, labour and T&P etc. required for proper completion of the work (S.I. 281 UPPWD SOR 01-10-18 )
750
-
6520
... More
RCC work with cement approved coarse sand and 2cm guage approved stone grit in proportion 1:1½:3 (M-20 MIX) in Raft foundation and footing excluding supply of reinforcedment and its binding but including its fixing and binding the same with 24 BWGGI bindig wire and inlcuding necessary centering and shuttering etc and also including supply of all material labour T&P required for the proper completion of the work, bindig wire cost being included in the item S.I. 287 UPPWD SOR 01-10-18
1150
-
7390
... More
Providing and laying cement concrete in retaing walls, return walls, walls (any thickness) including attached plasters, coloumn, piers abutments, pillers upto floor five level excluding the cost of centering and shuttering and finishing in 1:1½:3 (M-20 MIX) (one cement: 1½ coarse sand:3graded stone aggrigate 20mm nominal size (S.I. 5.2.2 DSR 2018)
2070
-
8235.39
... More
RCC work with cement approved coarse sand and 2cm guage approved stone grit in proportion 1:1½:3 (M-20 MIX) in slab excluding supply of reinforcedment and its binding but including its fixing and binding the same with 24 BWGGI bindig wire and inlcuding necessary centering and shuttering etc and also including supply of all material labour T&P required for the proper completion of the work, bindig wire cost being included in the item S.I. 284A UPPWD SOR 01-10-18
125
-
8140
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in as over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. (S.I. No-504 UPPWD SOR 01-10-18)
2100
-
6250
... More
Centering & shuttering including strutting propping etc. and removal of form work for walls (any thickness) including attached plateris, butteresses plinth and string couse etc. DSR 2018 S.I. 5.9.2)
21600
-
539.2
... More
Providing and fixing 110mm dia UPVC pipe 6Kg/Sqcm ( make Tirupati/Astral/supreme/ prince only ISI mark) (LMR)
1680
-
348
... More
Arrangement of JCB machine including hire charges, cost of fuel and mobil oil and operation charges etc. all complete (UPPWD SOR Rate)
160
-
840
... More
Disposal of malwa upto 5Km including loading and unloading etc. all complete (UPPWD SOR Rate)
6875
-
173
... More
Pumping out water by diesel engine pump set including hire charges, cost of fuel, mobil oil and operation charges etc. all complete (UPPWD SOR Rate)
1200
-
100
... More
Arrangement of cleaner for cleaning the dirty material and other mics, work(UPPWD SOR Rate dt. 01-10-18)
200
-
295
... More
Providing and laying 160mm dia UPVC pipe 6kg/sqcm of ( make Tirupati/Astral/supreme/ prince only ISI mark) (LMR)
830
-
736
... More
Dismantling of brick work and disposal of dismantled work within 60mt distance as per direction of E/I (S.I. 692 UPPWD SOR 01-10-18)
150
-
450
... More
Supply of old bricks to the contractors (UPPWD SOR Rate 01-10-18)
-17250
-
5.3
... More
Supply of old bricks bats to the contractors (UPPWD SOR Rate 01-10-18)
-112.5
-
1200
... More
1- In figure …………………………………………% ABOVE/BELOW
-
-
-
... More
2- In words……………………………………………………………………
-
-
-
... More
(Rate will be coded in percentage basis only, above and below in mentioned in words)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements