Bareilly Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Bareilly Development Authority - BDA Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date22 Apr 2022
Closing Date19 May 2022
Tender Amount₹ 1,15,96,271 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in as over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. (S.I. No-504) SOR 2018

474

-

6780

... More
First class brick work with 1:4 cement and coarse sand in foundation plinth including supply of all material, labour T&P etc. required for the proportion of the work as per S.I. 305

50

-

5070

... More
RCC work with 1:1½:3 cement coarse sand and 20mm stone grit in walls including shuttering and centering but excluding the cost of the reinforcement complete in all respect as per S.I. 289

145

-

8190

... More
Extra for machnical compection of Earth including of levelling, dressing, watering & compacting the soil to achieve 95% proctor density etc. all complete (S.I. 253a)

1735

-

5

... More
Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 M and lead upto30M including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the E/I upto a distance of 30m from the foundation trenches (S.I. 251) including royality

200

-

160

... More
Concrete with 4cm guage stone ballast,course sand of 2.75 fineness modulous and cement in proportion of 8:4:1 in foundation and under floor, including supply of all material, labour and T&P etc. required for proper completion of the work (S.I. 281)

40

-

6620

... More
RCC work with cement, approved coarse sand & 2cms guage approved crushed stone grit in proportion of 1:1½:3 in raft foundation & footing excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGGI binding wire and including necessary centering & shuttering etc. and also including supply of all material labour and T&P etc. required for proper completion of work (S.I. 287+diff of 283 &284A) UPPWD SOR-1.10.18 7450 + 380

63

-

7830

... More
Cement concrete with 2cm gauge approved stone grit, coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work (S.I. No-279(i)

15

-

7200

... More
Centering and shuttering for only R.C.C Walls (any thickness). Including strutting, propping etc and removal of form including attached plasters, butteresses, plinth and string forces etc. SI-5.9.2 DSR-2019

1260

-

544.02

... More
Providing and laying 125 micron thick polythene sheet above Dry lean concrete. (SOR basic rate 28)

2625

-

14



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.