Banda Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Banda Development Authority Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date29 Jun 2021
Closing Date8 Jul 2021
Tender AmountRefer Documents
Costs
EMD
₹ 1,72,140Document Cost
₹ 4,366Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_BDA_599846_1Bid Award Id
ViewTender No
ETender/Atal/dated 09.07.2021Tender Authority
Banda Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work in excavation in foundation, in ordinary soil (loam clay or sand) including lift upto 1:5m (5ft) and lead upto 30 m (100 ft) and including filling watring and ramming of excavated earth in to tha tranches of in to the space between the building and sides of foundation tranches or in to the plinth and removal and disposal of surplus earth as deriction by the Engineer I/C. up to a distance of 30mtr. (100ft) from tha the foundation tranches (Sl no. 251)
320
-
120
Cement concrete with 4 cm. gauge approved stone ballast, approved coarse sand cement, in proportion 8:4:1 Including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (SI No. 281)
415
-
4300
Cement concrete with 2 cm. gauge approved stone ballast, approved coarse sand cement, in proportion 4:2:1 Including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (S.I. 279A)
45
-
5600
Class 150 Brick work in 1:3 cement and course sand in foundation complete with all respact including supply of all materials, labour Tools & Plants etc. required for proper completion of the work. (SI No. 307)
110
-
5450
R.C.C. work with cement, approved coarse sand and 2cm (3/4'') gauge approved stone ballast for T- beam & Slab roof and RCC column in the proportion of 1:1.5:3. excluding supply of rainforcement and its binding but including its fixing and binding wire copmlete with all respect. (S.I. No. 289)
23
-
7500
Mild steel Or iron work in plain work such as in RCC (when not included in over all rates) wrought to requerd shape as necessary including banding for proper completion of the work and including supply of steen, its wastage and hooks and authorised over lapping shall be measured (SI No…504)
20
-
5600
P/L 12mm. Thick Plaster 1:4 Cement & Sand on brick work minimum thickness not less then 10mm with 1 part of cement and 4 part of find sand of 1.25 fineness modulus. Comlete with all respect as per (S.No. 584)
450
-
130
P/A white cement based putty of average thickness 1.0 mm complete with all respect as per DSR 13.80/2018
449.41
-
115.15
Applying one coat of water thimmable cement primer of approved brand and manufacture and wall surface (13.43.1) /2018
450
-
60
Finishing walls with premium acralic smooth exterior paint with silicone additives of required shaid complete with all respect (DSR.13.47.1)/2018
450
-
161.15
Supply and spreding fine sand as per SI No . 7(I) /Sor 2020
155
-
1000
Supply and spreding of 20 to 40 mm. Machine broken Stone grit SI No 3(d II)/2020
105
-
840
providing and laying of 80 mm rubber molded cement concret pavement complete with all respect as per deriction of E/I. SI No . 6.7.1
700
-
840
providing and laying of 60 mm rubber molded tilescement concret pavement complete with all respect as per deriction of E/I. SI No . 6.7.2
2850
-
780
Chequerred precast cement concrete tiles 22 mm thick in
550
-
1221.65
5 cm thick 1 to 4 plain cement concret flor with cement approved course sand and 2 cm graded approved stone laid in panels finished with 3mm flotting coat of cement. Or cement and marble dust in ratio of 5:1 over 8 cm thick base concret complete with all respect as per itam no 604
300
-
610
Part B
-
-
-
Earth work in excavation in foundation, in ordinary soil (loam clay or sand) including lift upto 1:5m (5ft) and lead upto 30 m (100 ft) and including filling watring and ramming of excavated earth in to tha tranches of in to the space between the building and sides of foundation tranches or in to the plinth and removal and disposal of surplus earth as deriction by the Engineer I/C. up to a distance of 30mtr. (100ft) from tha the foundation tranches (Sl no. 251)
32
-
120
Cement concrete with 4 cm. gauge approved stone ballast, approved coarse sand cement, in proportion 8:4:1 Including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (SI No. 281)
11
-
4300
Cement concrete with 2 cm. gauge approved stone ballast, approved coarse sand cement, in proportion 4:2:1 Including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (S.I. 279A)
2
-
5600
Class 150 Brick work in 1:3 cement and course sand in foundation complete with all respact including supply of all materials, labour Tools & Plants etc. required for proper completion of the work. (SI No. 307)
70
-
5450
R.C.C. work with cement, approved coarse sand and 2cm (3/4'') gauge approved stone ballast for T- beam & Slab roof and RCC column in the proportion of 1:1.5:3. excluding supply of rainforcement and its binding but including its fixing and binding wire copmlete with all respect. (S.I. No. 289)
5
-
7500
Mild steel Or iron work in plain work such as in RCC (when not included in over all rates) wrought to requerd shape as necessary including banding for proper completion of the work and including supply of steen, its wastage and hooks and authorised over lapping shall be measured (SI No…504)
4.5
-
5600
P/L 12mm. Thick Plaster 1:4 Cement & Sand on brick work minimum thickness not less then 10mm with 1 part of cement and 4 part of find sand of 1.25 fineness modulus. Comlete with all respect as per (S.No. 584)
25
-
130
P/A white cement based putty of average thickness 1.0 mm complete with all respect as per DSR 13.80/2018
24.97
-
115.15
Applying one coat of water thimmable cement primer of approved brand and manufacture and wall surface (13.43.1) /2018
25
-
60
Finishing walls with premium acralic smooth exterior paint with silicone additives of required shaid complete with all respect (DSR.13.47.1)/2018
25
-
161.15
Providing and laying gang saw cut 18 mm thick, mirror polished pre moulded and pre polished machine cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring in road side plazas and similar locations, laid over 20mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) including grouting the joints with white cement mixed with matching pigment, epoxy touch ups etc. complete as per direction of Engineer-in-Charge With granite stone of area less than 0.50 sqm. (DSR 16.86.1/2018)
91
-
3725.9
P/F stainless steel (grade 304) railing made of hollow tubes, channels, plaits etc. Including welding, granding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, I/C fixing the railing with necessary accessories and stainless steel dash fasteners, stainless steel bolts etc, of required size on the top of the floor or the side of waist slab with sutailbe arrangement as per approvel of i/c, (for payment purpose only wait of stainless steel members shall be considered excluding fixing acccessories such as nuts,bolts,fastners etc
15.5
-
575.45
Part C
-
-
-
Earth work in excavation in foundation, in ordinary soil (loam clay or sand) including lift upto 1:5m (5ft) and lead upto 30 m (100 ft) and including filling watring and ramming of excavated earth in to tha tranches of in to the space between the building and sides of foundation tranches or in to the plinth and removal and disposal of surplus earth as deriction by the Engineer I/C. up to a distance of 30mtr. (100ft) from tha the foundation tranches (Sl no. 251)
9
-
120
Cement concrete with 4 cm. gauge approved stone ballast, approved coarse sand cement, in proportion 8:4:1 Including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (SI No. 281)
4.5
-
4300
Cement concrete with 2 cm. gauge approved stone ballast, approved coarse sand cement, in proportion 4:2:1 Including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (S.I. 279A)
1
-
5600
Class 150 Brick work in 1:3 cement and course sand in foundation complete with all respact including supply of all materials, labour Tools & Plants etc. required for proper completion of the work. (SI No. 307)
20
-
5450
P/L 12mm. Thick Plaster 1:4 Cement & Sand on brick work minimum thickness not less then 10mm with 1 part of cement and 4 part of find sand of 1.25 fineness modulus. Comlete with all respect as per (S.No. 584)
2
-
130
Providing and laying gang saw cut 18 mm thick, mirror polished pre moulded and pre polished machine cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring in road side plazas and similar locations, laid over 20mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) including grouting the joints with white cement mixed with matching pigment, epoxy touch ups etc. complete as per direction of Engineer-in-Charge With granite stone of area less than 0.50 sqm. (DSR 16.86.1/2018)
42
-
3725.9
P/F stainless steel (grade 304) railing made of hollow tubes, channels, plaits etc. Including welding, granding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, I/C fixing the railing with necessary accessories and stainless steel dash fasteners, stainless steel bolts etc, of required size on the top of the floor or the side of waist slab with sutailbe arrangement as per approvel of i/c, (for payment purpose only wait of stainless steel members shall be considered excluding fixing acccessories such as nuts,bolts,fastners etc
9
-
575.45
Part D
-
-
-
Earth work in excavation in foundation, in ordinary soil (loam clay or sand) including lift upto 1:5m (5ft) and lead upto 30 m (100 ft) and including filling watring and ramming of excavated earth in to tha tranches of in to the space between the building and sides of foundation tranches or in to the plinth and removal and disposal of surplus earth as deriction by the Engineer I/C. up to a distance of 30mtr. (100ft) from tha the foundation tranches (Sl no. 251)
7
-
120
Cement concrete with 4 cm. gauge approved stone ballast, approved coarse sand cement, in proportion 8:4:1 Including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (SI No. 281)
7
-
4300
Class 150 Brick work in 1:3 cement and course sand in foundation complete with all respact including supply of all materials, labour Tools & Plants etc. required for proper completion of the work. (SI No. 307)
12
-
5450
2.5 cm thick 1 to 4 plain cement concret flor with cement approved course sand and 2 cm graded approved stone laid in panels finished with 3mm flotting coat of cement. Or cement and marble dust in ratio of 5:1 over 8 cm thick base concret complete with all respect as per itam no 601
5.5
-
560
M.S. or iron in heavy sizes such as trusses built up gates, door, frames records, racks, roofwork, gates etc. wrought to required for including drilling holes rivetting or welding where necessary and also including supply of steel, bolts nut wastege etc and their fixing required for proper completion of the work in new itam. SI No.- 503/2020-21)
15
-
5900
Painting or Varnishing work in small area on new wood or iron work with one coat (upto one square meter) of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnishing including supply of all materials, labour and T & P etc. required for proper completion of the work.(SI 641+642/2020-21)
150
-
88