Banaras Hindu University Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Banaras Hindu University - BHU Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date21 Aug 2024
Closing Date28 Aug 2024
Tender Amount₹ 1,65,810 
Notes
Download

Costs

Summary

Providing Chain Link Fencing Near Corner Of Iit Play Ground To Chota Karmanbir Baba New Entrance Gate At Agriculture Research Farm (arhar Block), B.h.u.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Providing chain link fencing near corner of IIT Play Ground to Chota Karmanbir Baba new entrance gate at Agriculture Research Farm (Arhar block), B.H.U.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire (16.18.1)

40

810

20.26

... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar (15.7.4)

0.2

312

1562.94

... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) (4.2.3)

0.2

1819

9096

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts (5.9.6)

1

780

780.14

... More
6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand) (13.16.1)

1

241

241.74

... More
Straching and straightening of old barbed wire fencing by providing extre turn buckle & GI staple if required and fixing the old fixed barbed wire after taking out it if required and refix the same with the help of required turn buckle & GI Staples complete as per direction of engineer-in-charge. Payment to be made per metre cost of total length of barbed wire used. (a) with G.I. barbed wire (Fixed at site) (Based on rate Analysis)

351

4552

12.97



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.