Allahabad Development Authority Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Allahabad Development Authority - ADA Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date29 Jul 2020
Closing Date24 Aug 2020
Tender Amount₹ 3,59,49,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Notice inviting tender document with terms and condition
Financial BOQ for bidders rate quote
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCC in raft foundation and footing in the proportions 1:1.5:3 in cement approved coarse sand and 2cm gauge approved stone ballast excluding supply of reinforcement and its bending but excluding its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (SOR SI.No. 287(A)/2018)

138.15

-

7225

... More
12 mm thick Cement plaster in single coat on fair side of single or half brick wall for interior plastering including supply of all materials, labour & tools & plants etc. 1:4 cement and fine sand. (Sl.No.13.11C/2018New Item)

6667.44

-

140

... More
Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately): 150 mm diameter Class I (DSR 18.31.3.1/2018 Analysis)

1

-

4603.21

... More
Providing and fixing 32 mm dia nominal bore G.I. pipes complete with G.I. fittings including trenching and refilling etc. (DSR 18.12.4/2018 Analysis)

80

-

272.98

... More
S/L pf 35 Sqmm 3.5 Core PVC insulated armoured served sheathed 1100 V grade Al conductor Cable at a depth of 75 Cm below ground with excavation and back filling protected with bricks and fine sand complete with Lugs & connections Rate SOR 18/ S.N. 501 (k)

100

-

422

... More
Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing tee, including cutting and threading the pipe etc. complete : 25 to 40 mm nominal bore (DSR 18.13.1/2018 Analysis)

8

-

319.81

... More
S/F of main column pipe 90 mm dia upto 40 mtr with 2 nos. sluice valve CIDF, 1 Nos. NRV, required bend nuts bolts packing complete (Make KSB/CRI)

1

-

29200

... More
Fixing 15 mm . PVC connection Heavy quality with brass Unian including supply of all materials, labour, T&P etc . And required for proper completion of the work. 30 to 45 cm length

64

-

92.4

... More
2.5 cm (1") thick 1:2:4 plain cement without base concrete floor with cement, approved coarse sand and 2 cm (1") graded approved stone, grit, laid in panels finished with 3 mm (1/8") floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified over and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish, including supply of all materials, labour and tools & plants etc. required for proper completion of the work. (SI. No. 601A/2018)

32

-

280

... More
Providing & fixing P.V.C. low level flushing cistern of 10 litre capacity (White) with manually controlled device (handle lever) confirming to IS:7231 with all fittings and fixtures complete (SOR)

32

-

1245

... More
Supply and fixing of rolled steel joist 150 mm x 10 mm including its painting with approved paint and also one coat of primer. (Jal Nigam 2019)

0.96

-

1225.88

... More
(vi) 300 mm MS Ring made from 150x12 mm MS Plate.

12

-

1022

... More
Cartage of earth at a distance of 10 Km. from site including loading and unloading complete in all respect.

7512

-

242.6

... More
M-150 Brick work in 1:6 (1 Cement & Six fine sand of 1.25 F.M.) mortar in super structure including supply of all materials, labour & tools & plants etc. required for proper completion of work One brick thick wall. (SI. No. 303+309+310/2018)

222.7

-

4655

... More
(b) Column

7.62

-

8500

... More
Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: size 450x 300 mm with single 15 mm C.P. brass pillar tap (SOR)

32

-

1989.7

... More
Deduction of Cable Rate during errection in Pipe or Trench during Work S.I. No. 507/2018

100

-

-170

... More
Painting or varnishing new work in small areas or new wood work with one coat (upto one sq. mt.) of ready mixed priming paint and two coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour T&P etc required for proper completion of the work. (SI. 641 + 642/2018)

72

-

99

... More
RCC works with cement approved coarse sand and 2cm gauge approved stone grit in the proportions 1:1.5:3 excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (a) Plingth Beam

3.65

-

8550

... More
(iv) Siding bolt with 16 mm dia nuts & bolt 100 mm long

32

-

132

... More
(v) 300 mm dia MS well cap with nipple

1

-

2190

... More
Cement Concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of all work. (Sl. No. 281/2018)

6

-

4490

... More
Cartage of earth at a distance of 10 Km. from site including loading and unloading complete in all respect.

13

-

242.6

... More
Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : In 75x75 mm deep chase. (DSR 12.21.1/2018 Analysis)

135

-

133.2

... More
M-150 Brick work in 1:6 (1 Cement & Six fine sand of 1.25 F.M.) mortar in foundetion and plinth including supply of all materials, labour & tools & plants etc. (SI. No. 303/2018)

2

-

4100

... More
S/F of 100 Amp 415 Volt Metal clad TPN HRC type switch fuse unit complete with fuses on angle frame bracket SOR 18/ S.N. 324 (k)

1

-

7590

... More
Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete. Flexible pipe (D.S.R 17.28.1/ 2018) 32 mm dia

64

-

62

... More
Painting or varnishing new work in small areas or new wood work with one coat (upto one sq. mt.) of ready mixed priming paint and two coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour T&P etc required for proper completion of the work. (SI. 641 + 642/2018)

22

-

99

... More
Painting two coats on new work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) DSR 13.47.1/2018

160

-

161.15

... More
SANITARY WORK AND WATER SUPPLY Providing and fixing of water closet squatting pan (Indian type W.C. pan) with 100mm PVC P or S trap. Parry ware/Hind ware with all fitting and fixtures complete including cutting and making good the walls and floors wherever required. (DSR 17.13.1/2018 Analysis)

32

-

1792.69

... More
Add for plug points with modular type switch in place of piano type switch (SI. No. 187C/2018)

192

-

83

... More
12 mm thick Cement plaster in single coat on fair side of single or half brick wall for interior plastering including supply of all materials, labour & tools & plants etc. 1:4 cement and fine sand. (Sl.No.13.11C/2018New Item)

160

-

140

... More
P.V.C. Bend of (i) 75 mm dia (SI. No. 17.35/2018)

16

-

81

... More
(iii) Siding bolt with 16 mm dia nuts & bolt 250 mm long

228

-

132

... More
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. (DSR 18.8/2018) (Analysis SOR 2018) (i) 20 mm dia nominal bore (DSR 18.8.2/2018 Analysis)

192

-

271.29

... More
RCC in T Beams and footing in the proportions 1:1.5:3 in cement approved coarse sand and 4cm gauge approved stone ballast excluding supply of reinforcement and its bending but excluding its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (SOR SI.No. 285/2018)

36

-

8550

... More
(ii) For Roof Slab (SOR SI.No. 284/2018)

2.5

-

8060

... More
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall (DSR 18.7/2018) (Analysis SOR 2018) (i) 25 mm dia nominal bore (DSR 18.7.3/2018 Analysis)

252

-

165.51

... More
Internal Development Works Earth work in cutting in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M in depth and earth work in embankment to be in 20cm layers including ramming & dressing the surface to required level & slopes and also including 1.50M lift and 30 M lead the earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 Mtr. distance including cost of earth but excluding cartage as directed by E/I. (SI. No. 253/2018)

7512

-

106

... More
RCC in raft foundation and footing in the proportions 1:1.5:3 in cement approved coarse sand and 4cm gauge approved stone ballast excluding supply of reinforcement and its bending but excluding its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (SOR SI.No. 287+285-284/2018) (a) Raft

34

-

7225

... More
Supply and fixing of 80 mm thick Mechanically compressed Zig Zag Rubber Moulded M-30 inter locking cement concrete pavers block manufactured by high pressure & controlled vibration machine including cost of all material, labour T&P etc. required for proper completion of work as directed by Engineer-in charge (appd. Rate) including 2 inch thick sand.

917.5

-

869.25

... More
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia (DSR 2.10.1.2/2018)

300

-

319.47

... More
Add for exhaust fan points with modular type switch in place of piano type switch (SI. No. 187D/2018)

256

-

47

... More
Transportation loading unloading and freight of plant. Installation commissioning and testing wiring earthing and painting of system

1

-

18761

... More
Supply of all materials, labour, T&P etc. requred for construction of 250 mm dia S.C. Drain. (Jal Nigam 2019)

28

-

425

... More
Lowering of 300x200 mm dia tube well assembly from GL to 120 BGL, 300 mm dia housing pipe, 200 mm dia plain and slotted pipe as required

120

-

182

... More
M-150 Brick work in 1:6 Cement & coarse sand mortar in super structure including supply of all materials, labour & tools & plants etc. required for proper completion of work half brick thick wall. (SI.No. 303+309+310+310A/2018)

8

-

4735

... More
ELECTRIFICATION WORK (Internal) Wiring point for light with 1.5 sq. mm FRLSH PVC insulated multistrand copper conductor cable in PVC conduit pipe partly concealed in the wall and party laid in slab alongwith the reinforcement before concerting, complete with 14 SWG copper earth continuity wre, GP Box, Piano type switch & ceiling rose/angle/batten holder on 3mm thick phenolic paminated backlite sheet etc complete in all respect as directed including matching colour wash. (SI. No. 138C/2018)

288

-

610

... More
Material of tube well assembly. (Rate PSR in ADA) (i) 300 mm dia MSERW housing pipe 7 mm thick Jindal make as per 3589/4270

50

-

2190

... More
Supply of all materials, labour, T&P etc. requred for comstruction of Stilling chamber V notch chamber including supply of V notch etc. all complete. (Jal Nigam 2019)

1

-

30000

... More
M.S. or Iron work in angle iron door and window frame including cutting, welding and wastage including supply of all material, labour T&P etc. required for proper completion of the work. (SI. 503A/2018)

0.5

-

5356

... More
M.S. or Iron work in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost of binding wire. (SI. 504/2018)

12

-

5356

... More
Renewing panes of glass in door, window & ventilators or fixing in the new with 3 mm thick glass panes fixed with brads & putty including supply of all materials, labour, T&P etc. required for proper completion of the work. (SI.No. 806/2018)

218.03

-

520

... More
Cement Concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of all work. (Sl. No. 281/2018)

12

-

4490

... More
(iii) For Lintels (SI.No. 284-283a+283/2018)

0.5

-

7260

... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. Including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the foundation trenches. (SI.No. 251/2018)

1099.46

-

145

... More
Distempering two coat with oil bound distemper of approved brand and manufacturing and required shade on undecorated wall surface give an even shade over and including all complete. (SI. No. 649+651/2018)

5335.91

-

100

... More
M.S. or Iron work in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost of binding wire. (SI. 504/2018)

648.97

-

5356

... More
(ii) 25 mm dia nominal bore (DSR 18.8.3/2018 Analysis)

480

-

324.26

... More
S/F of 1x22 Watt LED Tube Light with batten complete on surface including proper connections Complete Rate SOR-18/ S.N. 1413 Cat AA

2

-

1020

... More
Constructing brick masonry manhole in cement mortar 1:4 ( 1 cement : 4 coarse sand ) with R.C.C. top slab with 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), foundation concrete 1:4:8 mix (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement complete as per standard design : Inside size 90x80 cm and 45 cm deep including C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover and frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg) : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 (DSR 19.7.1.1/2018 Analysis)

8

-

8170.63

... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. DSR 13.80 (2018)

5335.91

-

101

... More
M-150 Brick work in 1:6 Cement & coarse sand mortar in super structure including supply of all materials, labour & tools & plants etc. required for proper completion of work half brick thick wall. (SI.No. 303+309+310+310A/2018)

2

-

5190

... More
(iv) 300x200 mm dia MS Reducer 12 mm thick 300 mm

1

-

2336

... More
(b) 75 mm dia

16

-

68.2

... More
Cement Concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of all work. (Sl. No. 281/2018)

11.1

-

4490

... More
Delivery pipe for bypass chamber, excavation of trenches and laying of PVC pipe 160 mm dia including supply of pipe and labour, T&P etc complete.(Jal Nigam 2019)

20

-

618.5

... More
Supply & fixing of M.S. Iron work of small sizes Z section window such as holding down bolts, hold fast, tie rod grating etc. brought to required form including supply of steel bolts, nuts wastage, etc. and their fixing required for proper completion of the work. Openable. (SI. 502B/2018)

7397.76

-

71.5

... More
Providing & placing on terrace of on floors levels P.V.C. water storage tank of 500 lit. capacity with cover suitable locking arrangement conmplete as per ISI specification complete (Analysis Rate)

16000

-

7.48

... More
Providing and fixing 100 mm dia PVC Nahani trap heavy quality ISI marked including supply of all materials, labour T&P etc. required for proper completion of the work.

96

-

205

... More
RCC in raft foundation and footing in the proportions 1:1.5:3 in cement approved coarse sand and 2cm gauge approved stone ballast excluding supply of reinforcement and its bending but excluding its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (SOR SI.No. 287(A)/2018)

67.6

-

7225

... More
Renewing panes of glass in door, window & ventilators or fixing in the new with 3 mm thick glass panes fixed with brads & putty including supply of all materials, labour, T&P etc. required for proper completion of the work. (SI.No. 806/2018)

7

-

520

... More
External Development (NALA ) Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. Including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the foundation trenches. (SI.No. 251/2018)

180

-

145

... More
M.S. or Iron work in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost of binding wire. (SI. 504/2018)

646.45

-

5356

... More
Skirting

31.84

-

1320

... More
Supply and wiring of submain with two number 4 sq.mm FRLSH PVC insulated 1100 V grade multistrand single core copper conductor cable in 20 mm dia heavy guage rigid steel conduit concealed in wall, complete with one number 14 SWG copper earth continuity wire including matching colour wash etc., complete in all respect. (SI No. 216B/2018)

528

-

231

... More
Road Work Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres.

306

-

194

... More
M-150 Brick work in 1:4 (1 Cement & four fine sand of 1.25 F.M.) mortar in foundation including supply of all materials, labour & tools & plants etc. required for proper completion of work. (SI.No. 305/2018)

21

-

4260

... More
For Lighter Beam (SOR SI.No.285/2018) i. Plinth Beam

104.26

-

8550

... More
Construction of manhole 1.0 x 1.20 x 1.50 Mtr. internal size as per specified design and drawing and specification approved by ADA as per direction by E/I complete.

2

-

24304.96

... More
Cement Concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of all work. (Sl. No. 281/2018)

1.44

-

4490

... More
M-150 Brick work in 1:6 (1 Cement & Six fine sand of 1.25 F.M.) mortar in super structure including supply of all materials, labour & tools & plants etc. required for proper completion of work One brick thick wall. (SI. No. 303+309+310/2018)

16

-

4655

... More
Struck pointing with cement mortar consisting of 1 part of cement and 2 part of fine sand of 1.25 FM including supply of all material labour and T& P etc for proper complition of work SI NO 574/2018

2.4

-

150

... More
(iii) Drilling & reaming of 550 mm dia bore from 78 to 140

62

-

1095

... More
RCC works with cement approved coarse sand and 2cm gauge approved stone grit in the proportions 1:1.5:3 excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (i) For Lighter Beam (SOR SI.No.285/2018)

7.2

-

8550

... More
(iii) 200 mm dia MSERW Slotted pipe Jindal make as per 3589/4270

36

-

1752

... More
S/L of 16 Sqmm 3 Core copper conductor 1100 Volt grade, XLPE insulated fire proof flate cable for submersible complete with Lugs & connections Rate PSR

50

-

242

... More
20 mm wide drip coarse with cement mortar in 1:3 with cement and local sand (SOR 13.18)

15

-

28

... More
T/L of 110 mm size HDPE 6 Kg/Sqcm Pipe with trechless technology for cable laying complete Rate PSR in ADA

24

-

1237

... More
(ii) Drilling & reaming of 675 mm bore from GL to 78 BGL

78

-

1095

... More
Providing and laying Vitrified tiles in different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS: 15622, of approved brand & manufacturer, in all colours and shade, in skirting, riser of steps, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS: 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately).Size of Tile 600x600 mm (DSR 11.47.2 /2018 Analysis)

132.04

-

1116.2

... More
Drilling of bore, Installation of rig machine, dressing & leveling of site and drilling of 200/250 mm size bit for maxi requirement misc. work (i) Errection & Dismentling of Rig machine with T&P

1

-

10950

... More
Boundry wall Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. Including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the foundation trenches. (SI.No. 251/2018)

18

-

145

... More
Sopply and fixing of Kota stone in flooring 20 mm thick in and jointing filed with 1:2 cement course sand with approved colouring materials to be given and even shade with 12 mm base coat (bedding) of 1:2 cement and course sand mortar and polished by hand or machine and finally finshed with french manson polish or other approved polish including supply of all matterials, labour T&P etc. required for proper completion of the work excluding base concrete. (PWDSI.No.14.24/2018 New item)

157.12

-

1170

... More
Construction of manhole 1.0 x 1.20 x 1.50 Mtr. internal size as per specified design and drawing and specification approved by ADA as per direction by E/I complete.

8

-

24304.96

... More
(iii) 75 x 110 mm dia (DSR 7198/2018)

32

-

60.5

... More
S/Burying of 40 mm dia 4.5 Mtr long GI Pipe vertically for earthings having 12 mm dia holes spaced 75 mm apart drilled upto 2 Mtr from the bottom complete with alternate layer of Charcoal and Salt as direction of E/I. Rate SOR-18/ S.N. 701

2

-

4076

... More
For Lintels (SI.No. 284-283a+283/2018)

4.6

-

7260

... More
Wiring point for Plug with 1.5 sq. mm FRLSH PVC insulated multistrand copper conductor cable in PVC conduit pipe partly concealed in the wall and party laid in slab alongwith the reinforcement before concerting, complete with 14 SWG copper earth continuity wre, GP Box, Piano type switch & Socket etc. complete in all respect as directed including matching colour wash. (SI. No. 141C/2018)

192

-

327

... More
Door Hinges with necessary screws (100 mm Long) (SI.No.11(b)/2018 material)

390

-

16.5

... More
Supply and fixing of 900 V- notch 4 mm thick MS plate with sharp edged & scale etc. complete. (Jal Nigam 2019)

1

-

10000

... More
Cement Concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of all work. (Sl. No. 281/2018)

19.3

-

4490

... More
(ii) 900 mm dia RCC pipes (DSR 19.35.3/2018 Analysis)

20

-

4826

... More
Cutting grove in plaster 1 cm wide & 1 cm deep by using special tools including supply of all T & P complete (S.I. No. 18.08/2018)

1319

-

4.4

... More
(ii) 110 mm dia (DSR 7197/2018)

32

-

60.5

... More
Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed, within a lead of 50 m : Pipes, cables etc. exceeding 80 mm dia but not exceeding 300 mm dia (DSR 2.13.1.2/2018)

30

-

801.85

... More
Supply and fixing of PVC cowel. (A/R) (a) 110 mm dia

8

-

73.7

... More
S&F of 40 Amp.S.P. Isolator CAT B (SI No. 1004 (A)/2018)

32

-

250

... More
S&F of 6 Amp to 32 Amp. SPMCB (10KA) C Curve (SI no. 1002/2018) CAT-A

128

-

260

... More
S & F of surface/ flush mounting 8 ways SPN distribution board without additional metal door without MCB complite in all respect as directed by Engineer in Charge (SI No. 1024(A)/2018) CAT-A

32

-

1900

... More
Distempering two coat with oil bound distemper of approved brand and manufacturing and required shade on undecorated wall surface give an even shade over and including all complete. (SI. No. 649+651/2018)

23

-

100

... More
Providing and fixing of 50 mm dia P.V.C. pipe pressure etc. all complete.

24

-

79.66

... More
For Water Harvesting Construction of Chamber of 0.60 x 0.60 x 0.90 Mtr. size as per specified design and drawing and specification approved by ADA as per direction by E/I complete.

4

-

7451.86

... More
Providing and fixing of Stainless Steel A ISI 304 (18/8) kitchen sink as per IS 13983 with C.I. brackets and stainless steel pulg 40 mm including painting of fittings and brackests, cutting and making good the walls wherever required without drain board 470x420 mm bowl depth 178 mm. (D.S.R. 17.10.2.3/2018)

32

-

2305.35

... More
Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 (1 cement : 3 coarse sand), finished with a floating coat of neat cement and making necessary channels for the drain etc. complete : For pipes 250 to 300 mm diameter (DSR 19.21.2/2018)

2

-

717.3

... More
(iii) 1000 mm dia RCC pipes (DSR 19.35.4/2018 Analysis)

10

-

5685

... More
Providing and fixing of P.V.C. pipe of 6 Kg./cm2 pressure (110 mm) with all complete. PWD

336

-

366

... More
M.S. or Iron work in angle iron door and window frame including cutting, welding and wastage including supply of all material, labour T&P etc. required for proper completion of the work. (SI. 503A/2018)

47.8

-

5356

... More
For Roof Slab (SOR SI.No. 284/2018)

272.38

-

8060

... More
Delivery pipe for bypass chamber, excavation of trenches and laying of PVC pipe 160 mm dia including supply of pipe and labour, T&P etc complete.(Jal Nigam 2019)

25

-

618.5

... More
Providing and laying Vitrified tiles in floor with different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately). Size of Tile 600x600 mm (DSR11.49.2 /2018 Analysis)

1156.47

-

1061.83

... More
Providing and fixing of ball valve of approved quality complete (screwed end) DSR 18.18.2/2018 Analysis) (i) 20 mm nominal bore

32

-

354.89

... More
M.S. or Iron work in angle iron door and window frame including cutting, welding and wastage including supply of all material, labour T&P etc. required for proper completion of the work. (SI. 503A/2018)

1

-

5356

... More
(ii) 200 mm dia MSERW Plain pipe Jindal make as per 3589/4270

34

-

1533

... More
12 mm thick Cement plaster in 1:4 with cement and fine sand including supply of all materials, labour & tools & plants etc. 1:4 cement and fine sand. (Sl.No.13.11c/2018 New Item)

136

-

140

... More
(viii) 300 mm dia MS Clamp with nut bolts

1

-

3650

... More
Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931 (DSR 18.53.1/2018) 15mm nominal bore

64

-

482.5

... More
Development of tube well by air compressor with Errection Dovelopment 60 Hrs including 25 Kg sodium hexameta phosphate & Dismentling of compressor

1

-

119081

... More
(b) For T beams (SOR SI.No. 285/2018) Retaining wall

150

-

8550

... More
Cement Concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of all work. (Sl. No. 281/2018)

3

-

4490

... More
Supply and fixing 6 mm China White glazed tiles in flooring or in skirting or dado laid with 1:3 cement and approved coarse sand mortar finished with white cement slurry, jointing and polishing complete, including supply of all materials, labour and tools & plants etc. required for proper completion of the work. (SI. 628/2018)

685.1

-

1075

... More
(v) S/S door handles with screws 150mm long (SI.No.10(i)(2) /2018 material)

228

-

48.4

... More
Cement Concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of all work. (Sl. No. 281/2018)

7.1

-

4490

... More
Finishing wall with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour T&P etc required for proper completion of the work. (SI.No. 660+661/2018)

224

-

75

... More
As above item no. 7 SOR No.309 above but walls upto 75mm thick Add for extra labour to the rate of items No. 310A Excluding GST. (SI. 310B/2018)

3.42

-

5365

... More
Supply and fixing of fully paneled of doors commercial quality ISI marked ply wood flush shutters 32 mm thick including labour cost for fixing of fittings. (SI. No. U.P.P.W.D. SOR 470 +18.14 /2018)

5

-

2264

... More
P.V.C. Tee (i) 75 mm dia (DSR 7198/2018)

64

-

55

... More
Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. Complete(i) 600 mm dia RCC pipes (DSR 19.35.2/2018 Analysis)

15

-

2319

... More
M.S. or Iron work in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost of binding wire. (SI. 504/2018)

53.07

-

5356

... More
Flush pointing with cement mortar consisting of 1 part of cement and 2 part of fine sand of 1.25 FM including supply of all material labour and T& P etc for proper complition of work SINo 574/2018

3.6

-

128

... More
Providing and fixing 40 mm dia nominal bore G.I. pipes complete with G.I. fittings including trenching and refilling etc. (DSR 18.12.5/2018 Analysis)

208

-

312.17

... More
Supply and burying 600 mm x 600 mm x 6 mm G.I. Plate vertically for earthing with its top at least 3 m below ground level complete with 20 mm dia G.I. pipe and funnel for watering and one earting lead of two no. 8 to 10 SWG GI Wire in 15mm dia G.I. pipe up to switch board ( from appron to switch board the cost of G.I. pipe and G.I. wire will be extra) 30 cm square C.I. frame with hinged cover masonry housing alternate layers of charcoal/coke and salt at least 150 mm thick alround etc.as per directions of E/I complete in all respect. (SI. 703/2018)

4

-

5380

... More
30 mm thick factory made Polyvinyl Chloride (PVC) door shutter made of styles and rails of a uPVC hollow section of size 60x30 mm and wall thickness 2 mm (±0.2 mm), with inbuilt decorative moulding edging on one side. The styles and rails mitred and joint at the corners by means of M.S. galvanised/ plastic brackets of size 75x220 mm having wall thickness 1.0 mm and stainless steel screws. The styles of the shutter reinforced by inserting galvanised M.S. tube of size 25x20 mm and 1 mm (± 0.1 mm) wall thickness. The lock rail made up of 'H' section, a uPVC hollow section of size 100x30 mm and 2 mm (± 0.2 mm) wall thickness fixed to the shutter styles by means of plastic/ galvanised M.S. 'U' cleats. The shutter frame filled with a uPVC multi-chambered single panel of size not less than 620 mm, having over all thickness of 20 mm and 1 mm (± 0.1 mm) wall thickness . The panels filled vertically and tie bar at two places by inserting horizontally 6 mm galvanised M.S. rod and fastened with nuts and washers, complete as per manufacturer's specific ation and direction of Engineer-in-charge. (DSR 9.118.2 /2018)

50.4

-

2528

... More
Water Line Providing and laying Double Flanged (Screwed / Welded) Centrifugally (Spun) Ductile Iron Pipes of Class K - 9 conforming to IS: 8329: Ductile Iron Double Flanged (DSR 18.73.2/2018 Analysis) 150 mm dia

30

-

1894.24

... More
(b) For Lighter Beam (SOR SI.No.285/2018)

2

-

8550

... More
Supply & fixing of M.S. Iron work of small sizes Z section window such as holding down bolts, hold fast, tie rod grating etc. brought to required form including supply of steel bolts, nuts wastage, etc. and their fixing required for proper completion of the work. Openable. (SI. 502B/2018)

350

-

71.5

... More
S/B of 40 mm dia 4.5 Mtr long GI Pipe vertically for earthings having 12 mm dia holes spaced 75 mm apart drilled upto 2 Mtr from the bottom complete with earth lead of 6 SWG GIWire in GI Pipe complete with 30 cm Square CI Box with hinged cover masonary enclosure, funnel at top, alternate layer of Charcoal and Salt as direction of E/I Rate SOR 18/ S.N. 701.

2

-

4076

... More
Boring with hydraulic piling rigs with power units, Providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) : 300 mm dia piles. (DSR 20.3.1/2018 Analysis)

54

-

2061.14

... More
20 mm thick rough cast exterior cement plaster on walls consisting of 10 mm thick backing cast of 1:3 cement mortar (1 cement : 3 coarse sand) and 10 mm thick finishing coat of 1:3 cement mortar (1 cement : 3 coarse aggregate of size 6 mm to 12 mm) including arises, chamfers and/or rounded angles not exceeding 80 mm in girth. (SI.No. 13.07 New item/2018)

85.18

-

167

... More
Providing and fixing of P.V.C. pipe of 4 Kg./cm2 pressure (110 mm) with all complete. PWD

8

-

243.1

... More
12 mm thick Cement plaster in single coat on fair side of single or half brick wall for interior plastering including supply of all materials, labour & tools & plants etc. 1:4 cement and fine sand. (Sl.No.13.11C/2018New Item)

187

-

140

... More
Providing and fixing of P.V.C. pipe of 6 Kg./cm2 pressure (160 mm) with all complete. PWD

6

-

570

... More
Cement Concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of all work. (Sl. No. 281/2018)

60

-

4490

... More
RCC in raft foundation and footing in the proportions 1:1.5:3 in cement approved coarse sand and 4cm gauge approved stone ballast excluding supply of reinforcement and its bending but excluding its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (SOR SI.No. 287+285-284/2018)

12

-

7225

... More
Test to take the yield test of tube well & chemical, bacteriological test. & Electrical logging of bore

1

-

18250

... More
Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate of 20 mm nominal size) over P.V.C. sheet 1 m x1 m x 400 micron, finished with 12 mm cement plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat cement, rounding the edges and making and finishing the outlet complete. PWD 18.24/2018

8

-

125

... More
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: Painting two coats on new work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) DSR 13.47.1/2016

132

-

99

... More
S/F of clear water submersible pump with clemetor 3 phase AC operatum to 380 to 440 V, 10 HP, 60 Mt Head capacity (Make KSB/CRI) with S/F of manually operated star delta starter CP having A meter, V meter, ASS, VSS, indicator, & required CTs suitable for 10 HP Motor pump (Make L&T)

1

-

80416

... More
RCC in raft foundation and footing in the proportions 1:1.5:3 in cement approved coarse sand and 2cm gauge approved stone ballast excluding supply of reinforcement and its bending but excluding its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (SOR SI.No. 287(A)/2018)

2

-

7225

... More
Additional or substruction of manhole shaft (1.0 x 1.20 M) for 1 Mtr. or part as per given design and drawing aproved by ADA as per directed by E/I complete.

2

-

6901.17

... More
(ii) Tower bolt with 10 mm dia rod & screw 100 mm long (stainless steel) with ISI mark (SI. NO. 10A /2018) material

32

-

88

... More
Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 gms. (DSR 18.51.1/2018) 15 mm nominal bore

32

-

576

... More
Sewer Line Providing and laying non-pressure NP-3 class (light duty) 300 mm dia. R.C.C. pipe with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete. (Analysis Rate)

30

-

1051

... More
(ii) 110 mm dia (SI. No. 17.34/2018)

16

-

86.5

... More
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) U.P.P.W.D. SOR 23.99A +53/2018) (i) 20 mm nominal bore

32

-

721

... More
Supply and wiring in 25 mm dia heavy duty (2mm thick) PVC conduit with 2 nos 2.5 sq mm. FRLSH PVC insulated multistrand copper conductor cable as earth continuity wire drawn in conduit partly concealed in wall & partly laid in slab along with reinforcement before concreting with two number 14 SWG copper earth continuity wire including matching colour wash etc, complete in all respect (SI. No. 261C/2018)

1280

-

217

... More
RCC works with cement approved coarse sand and 2cm gauge approved stone grit in the proportions 1:1.5:3 excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. A. For Column Work (SOR SI.No. 289/2018)

57.92

-

8500

... More
(vii) 200 mm MS Ring made from 150x12 mm MS Plate.

18

-

766

... More
Providing and fixing of 40 mm dia P.V.C. pipe pressure etc. all complete. For Spout pipe (analysis Rate)

40

-

50

... More
Painting or varnishing new work in small areas or new wood work with one coat (upto one sq. mt.) of ready mixed priming paint and two coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour T&P etc required for proper completion of the work. (SI. 641 + 642/2018)

1073.62

-

99

... More
External Development (Retaining Wall) Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. Including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the foundation trenches. (SI.No. 251/2018)

125

-

145

... More
External Electricity work UPPWD Electrical Works Shedule 2018 -Items S/F of AI comductor PVC insulated armoured served sheathed 1100 volts 50 Sqmm x 3.5 C LT Cable at a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and prected with burnt bricks on sides and on top. Complete in all respect. Rate Sor 18/S.N. 501 k

100

-

492

... More
RCC works with cement approved coarse sand and 2cm gauge approved stone grit in the proportions 1:1.5:3 in slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (SI.No. 284/2018)

102

-

8060

... More
Providing and fixing of P.V.C. pipe of 4 Kg./cm2 pressure (110 mm) with all complete. PWD

50

-

243.1

... More
(i) Tower bolt with 10 mm dia rod & screw 150 mm long (stainless steel) with ISI mark (SI. NO. 10B /2018) material

98

-

132

... More
Wiring point for Call bell with 1.5 sq. mm FRLSH PVC insulated multistrand copper conductor cable in PVC conduit pipe partly concealed in the wall and party laid in slab alongwith the reinforcement before concerting, complete with 14 SWG copper earth continuity wre, GP Box, Piano type bell Push or 2 pin socket etc. complete in all respect as directed including matching colour wash. (SI. No. 142C/2018)

32

-

572

... More
Additional or substruction of chamber shaft (0.60x0.60 M) for 1.00 Mtr. or part as per given design and drawing aproved by ADA as per directed by E/I complete.

3.75

-

4521.06

... More
Providing, laying, spreading and compacting of graded stone agg. G.S.B. including all complete.(Grade-I)

91.75

-

1776

... More
Additional or substruction of manhole shaft (1.0 x 1.20 M) for 1 Mtr. or part as per given design and drawing aproved by ADA as per directed by E/I complete.

2

-

6901.17

... More
M.S. or Iron work in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost of binding wire. (SI.No. 504/2018)

121

-

5356

... More
Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. (DSR 8.2.2/2018) Granite.

44.16

-

4029

... More
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: Painting two coats on new work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) (DSR 13.47.1/2018 Analysis)

1331.53

-

86.03

... More
For Roof Slab (SOR SI.No. 284/2015)

6.9

-

8060

... More
(ix) Tube well assembly support with 200 mm bail plug & hook.

1

-

5694

... More
Cost of 2.5 Ton capacity 4.5 Mtr lift super geared chain pully branched tested on 2.5 Ton loaded complete

1

-

17520

... More
SITC of 16 Meter space panal made of 16 SWG CRCA Sheet with factory fabricated having 400 Amp TPN SFU 1 nos. + outgoing 63 Amp 4 Pole 28 Nos. MCB , including RYB Indicator, V Meter, A Meter, VSS, ASS, cts with required suetable busbar with grouting, plinthing,making connections. panal shoul be in Verious section as site requirement and coupuled by Busbar or Lead as required comple in all respect. (Rate DSR 314126/28x16)

2

-

179500

... More
Boring OF 10 HP TUBE WELL ONE NO 300x200 mm 140 Mtr Deep 10 HP Tube Well Transportation of Rig Machine 675/27" , 250 PSI Ring Machine + OP unit & concern equipmant loading and unloading and its T&P etc. for psop. site.

1

-

36500

... More
Supply and fixing of 150 mm thick round or hexagonal box type pankha hook with 12 mm dia round bar complete with all material labour T&P etc. required for proper completion of the work. (SI. No. 18.16 New Item/2018)

96

-

160

... More
M.S. or Iron work in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost of binding wire. (SI. 504/2018)

203.32

-

5356

... More
Add for Call bell point with modular type bell push in place of piano type push (SI. No. 187E/2018)

32

-

80

... More
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. (DSR 22.5/2018 Analysis)

888.12

-

296.78

... More
Non Schedule Items S/F of 80 mm dia G.I. Pipe Class B Make Rate ( DSR SN 1552/2018)

4

-

505

... More
S/F of 100 mm dia AC pressure pipe including excavation back filling, D joint etc complete as per E/I

20

-

242

... More
S/S of pre gravel 1.6 to 4.8 mm size of pregravel all complete.

52

-

2080

... More
Same as above but for railing (SI. 502A/2018)

707.89

-

59.22

... More
RCC works with cement approved coarse sand and 2cm gauge approved stone grit in the proportions 1:1.5:3 excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (a) For Column Work (SOR SI.No. 287/2018)

3

-

8500

... More
M-150 Brick work in 1:6 (1 Cement & Six fine sand of 1.25 F.M.) mortar in Foundation and Plinth including supply of all materials, labour & tools & plants etc. required for proper completion of work One brick thick wall. (Jal Nigam 2019)

10

-

4100

... More
Construction of Chamber of 0.60 x 0.60 x 0.90 Mtr. size as per specified design and drawing and specification approved by ADA as per direction by E/I complete.

15

-

7541.86

... More
Providing and laying S&S C.I. Standard specials such as tees, bends, collars tapers and caps etc, suitable for flanged jointing as per IS : 1538 : Up to 300 mm dia (DSR 18.66.1/2018 Analysis)

1

-

6071.88

... More
Fixing of M.S. chaukhat in true position including 1:3:6 CC bed block all complete. For Door Chaukhat/Window/ Ventilator (SOR Item 10.08/2018)

226

-

100

... More
M.S. or Iron work in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost of binding wire. (SI. 504/2018)

6

-

5356

... More
Additional or substruction of chamber shaft (0.60x0.60 M) for 1.00 Mtr. or part as per given design and drawing aproved by ADA as per directed by E/I complete.

1

-

4521.06

... More
Supply and fixing of fully paneled of doors commercial quality ISI marked ply wood flush shutters 32 mm thick including labour cost for fixing of fittings. (SI. No. U.P.P.W.D. SOR 470 +18.14 /2018)

232.68

-

2264

... More
Drain and Parking Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer in-charge upto a distance of 30m from the foundation trenches. (SI. No. 251/2018)

45

-

145

... More
S/I of 32 gallon capacity bleaching Dozer differential pressure feed type chlorinaling plant with all acessories complete

1

-

14600

... More
Pump House Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. Including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer incharge upto a distance of 30m from the foundation trenches. (SI.No. 251/2018)

20

-

145

... More
M-150 Brick work in 1:3 Cement & coarse sand mortar in super structure including supply of all materials, labour & tools & plants etc. required for proper completion of work half brick thick wall. (SI. No. 307+309+310+310A/2018)

200.25

-

5190

... More
Wiring point for Fan/fresh air fan (light duty exhaust fan) with 1.5 sq. mm FRLSH PVC insulated multistrand copper conductor cable in PVC conduit pipe partly concealed in the wall and party laid in slab alongwith the reinforcement before concerting, complete with 14 SWG copper earth continuity wre, GP Box, Piano type switch & ceiling rose/angle/batten holder on 3mm thick phenolic paminated backlite sheet etc complete in all respect as directed including matching colour wash. (SI. No. 140C/2018)

352

-

671

... More
Providing and fixing 15mm nominal bore CP brass bib cock of approved quality. (SOR 2018) L&K Jaguar make

96

-

526

... More
Supply and fixing of C.P. Grating for Nahani trap of approved make including supply of all materials, labour, T&P etc. required for proper completion of work.

96

-

145

... More
Add for Fan points with modular type switch in place of piano type switch (SI. No. 187A/2018)

96

-

44

... More
Providing and fixing of 75 mm dia P.V.C. pipe working 4 Kg./cm2 pressure etc. all complete. PWD

317

-

116.6

... More
Development of tube well by 3 cusec OP unit Errection, Development 80 Hrs & dismentling complete.

1

-

63510

... More
Cinder filling in under floor including watering ramming consolidation and dressing complete including lead upto 50 m and lift 1.5 m including the cost of sand.

9.25

-

226.62

... More
Providing and fixing 20 mm dia nominal bore G.I. pipes complete with G.I. fittings and clamps, i/c cutting and making good the walls etc. (DSR 18.10.2/2018 Analysis)

32

-

198.45

... More
S/F of LED 90 Street light fitting having die cast aluminium body and diffuser/Reflector with driver set suitable confirming to IP 65 protection complete Make - Cat AA SOR 1423

2

-

5200

... More
Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies tarraces etc consisting of folloeing operations: a. Applying a slurry coat of neat cement using 2.75 Kg/sqm of cement admixed with water profing compound conforming to IS 2645 and approved by Engineer-in-Charge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment. b. Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm xize with 50% of cement mortar 1:5 ( 1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge over 20 mm thick layer of cement mortar of mix 1:5 ( 1 cement : 5 coarse sand) admixed with water proofing compound comforming to IS : 2645 and approved by Engineer-in-charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs C. After 2 days of proper curring applying a second coat of cement slurry using 2.75 Kg/sqm of cement admixed with water proofing compound conforming to IS : 2645 and appoved by Engineer-in-charge. D. Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement : 4 coarse sand) admixed with water proofing compound comforming to IS: 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in too layer of plaster and finally finishing the suface with trowal with neat cement cement slurry and making pattern of 300x300 mm square 3 mm deap. E- The whole terrace so fineshed shall be flooded with wather for a minimum period of two weeks for curing and for final test. All aboce operation to be done in order and as directed and specified by the Engineer-in-charge.With average thickness of 120 mm and minimum thickness at khurra as 65 mm. (DSR 22.7.1./2018 Analysis) (Brick coba)

406.81

-

762.34

... More
Add for light points with modular type switch in place of piano type switch (SI. No. 187A/2018)

288

-

44

... More
Cement Concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of all work. (Sl. No. 281/2018)

3

-

4490



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.