Allahabad Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Allahabad Development Authority - ADA Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date26 Jun 2021
Closing Date5 Jul 2021
Tender Amount₹ 8,30,000
Costs
EMD
₹ 17,000Document Cost
₹ 236Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_ADAUP_599090_1Bid Award Id
ViewTender No
PDA/RamleelaPark/5721Tender Authority
Allahabad Development Authority ViewPurchaser Address
-Website
http://http://adaallahabad.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
R.c.c work with cement approved coarse sand and 2 cm. Gauge approved stone grit in proportions of 1:1.5:3 in columns excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire. (SOR- 289/20 )
2.07
-
9950
... More
R.c.c work with cement approved coarse sand and 2 cm. Gauge approved stone grit in proportions of 1:1.5:3 in lighter beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire.(SOR- 285/2020)
2.34
-
9500
... More
M-150Brick work in 1:4 one cement & four fine sand of 1.25F.M. Mortar foundation and plinth including supply of all materials labour, Tools & plants etc. Required for proper completion of the work.(SOR-305/2020)
8.97
-
5100
... More
Mild Steel Tubular pipe work welded in built up in gratings, frames, guard bar, ladder, railing, brackets, gates and similar works, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (DSR 10.25/2/2018)
364
-
131
... More
M.S.(tor steel or plain) in plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost of binding wire. (SOR-504/20)
7.7
-
6200
... More
Finishing wall with water proof cement paint of approved make and quality on new wood with two coats to give an even shade including supply of all materials, labour, Tools & plant etc. Required for proper completion of the work. (SOR-660+661/2020)
218
-
75
... More
Painting or varnishing new work in small areas or new wood work with one coat (upto one sq.mt.)of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour and tools and plants etc. required for proper completion.(SOR-641/2020)
13
-
66
... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift up to 1050 metre and lead up to 30mtr. Including filling watering and ramming if excavated earth into the trenches of into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer in charge up to a distance of 30m. From the foundation trenches. (including Royalty)Excluding GST (SOR-251/2020)
4.32
-
160
... More
Concrete with 4 cm gauge stone ballast, coarse sand and cement in proportion of 1:4:8 in foundations and under floors including supply of all materials, labor, tools & plants etc. required for proper completion of the work. (SOR-281/2020)
11.41
-
4800
... More
R.c.c work with cement approved coarse sand and 2 cm. Gauge approved stone grit in proportions of 1:1.5:3 in Raft foundation and footing excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire.(SOR- 287A/20 )
8.64
-
7800
... More
R.c.c work with cement approved coarse sand and 2 cm. Gauge approved stone grit in proportions of 1:1.5:3 in columns excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire. (SOR- 289/20 )
5.38
-
9950
... More
R.c.c work with cement approved coarse sand and 2 cm. Gauge approved stone grit in proportions of 1:1.5:3 in lighter beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire.(SOR- 285/2020)
7.54
-
9500
... More
R.c.c work with cement approved coarse sand and 2 cm. Gauge approved stone grit in proportions of 1:1.5:3 in slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire.(SOR-284/2020)
6.84
-
9000
... More
M.S.(tor steel or plain) in plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost of binding wire. (SOR-504/2020)
27.87
-
6200
... More
Filling of available excavated earth all complete.
Back filling by J.C.B.
48
-
840
... More
Add C.P. 10%
48
-
84
... More
Providing & laying selection no.1 grass turf with earth 50mm to 60mm thickness on existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller made the surface smoothen and light altering the same as per direction of officer in charge. (DSR 2.34Hort.)
875
-
77
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements