The ADA has issued a formal invitation for competitive bids for the Allahabad Development Authority project, for Strengthening Of Road And Drain From Kushwaha Market To Niwa Gaon At Sulem Sarai Housing Scheme, Prayagraj in Prayagraj, Uttar Pradesh, with an estimated contract value of Rs. 1,10,98,000. The bid opening date for this tender is 18-01-2019 and the last date for bid submission is 24-01-2019. Interested bidders for Allahabad Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Allahabad Development Authority - ADA Tender

Works
Eprocure
Opening Date18 Jan 2019
Closing Date24 Jan 2019
Tender Amount₹ 1,10,98,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Notice inviting tender document with terms and condition
Financial BOQ for bidders rate quote
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer in-charge upto a distance of 30m from the foundation trenches. (SI. No. 251/2018)

995

-

145

... More
Struck pointing with cement mortar consisting 1:2 cement and fine sand of 1.25 FM including supply and all material labour T&P etc. respect for proper completion of work. (SI. No. 574/2018)

1710

-

150

... More
RCC works with cement approved coarse sand and 2cm gauge approved stone grit in the proportions 1:1.5:3 in slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (SI. No. 284/2018)

6

-

8060

... More
Earth work in cutting in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M in depth and earth work in embankment to be in 20cm layers including ramming & dressing the surface to required level & slopes and also including 1.50M lift and 30 M lead the earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 Mtr. distance as directed by E/I. (SI.No. 253/2015)

1312

-

122

... More
M.S. or Iron work in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost of binding wire. (SI.No. 504/2018)

7.5

-

5356

... More
Providing and laying 25 mm thick SDBC with 100-120 T.P.H. batch type HMD producing an average out but of 75 Tones per hour using crushed aggregates of specified grading premixed with CRMB-55 graded bitumen binder @5% of mix. including tack coat all material, labour, T&P etc. all complete as per appd. Analysis

5150

-

233.85

... More
Cartage of surplus earth at a distance of 1.0 Km from site including loading and unloading etc. all complete.

2010

-

95

... More
M-150 Brick work in 1:4 (1 Cement & four fine sand of 1.25 F.M.) mortar in foundation including supply of all materials, labour & tools & plants etc. required for proper completion of work. (SI. No. 305/2018)

517

-

4260

... More
Cement Concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of all work. (Sl. No. 281/2018)

220

-

4490

... More
Supply, stacking and laying of 80 mm thick ‘I’ shaped cement concrete pavers block M-30 MPa manufactured by high pressure & controlled vibration machine including cost of all material, labour T&P etc. required for proper completion of work as directed by E/I (Appd. Rate).

2400

-

772

... More
Providing and applying tack coat with 80/100 (VG 10) bitumen emulsion using emulsion pressure distributor @ 0.30 kg/sqm on the prepared bituminous /granular surface cleaned with mechanical broom including supply of materials, labour and T&P etc. required for proper completion of the work. (A.R.)

10300

-

11.7

... More
Providing, laying, spreading and compacting of graded stone aggregate G.S.B. including all complete.

600

-

1776

... More
Providing & laying 50 mm thick consolidated B.M. premix with greaded approved coarse aggregate, fine aggregate filler and bitumen content @3.4% as per MORTH/PWD specification including heating bitumen to required temperature, applying Tack coat, cleaning the surface and providing labour at HMP, the cost of labour, T&P etc. including the cost of material required for proper completion of the work.

5150

-

394.8

... More
Cement Concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportion of 4:2:1 including supply of all material labour T&P complete of all work. (Sl. No. 279/2018)

82

-

6115



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.