Allahabad Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Allahabad Development Authority - ADA Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date30 Sep 2019
Closing Date14 Oct 2019
Tender Amount₹ 33,57,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Notice inviting tender document with terms and condition
Financial BOQ for bidders rate quote
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401.

152

269952

1776

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Reference of MORT&H 406)

100

272700

2727

... More
Providing and applying tack coat with Emulsion using emulsion pressure distributor at the rate of 0.70 kg per sqm on the prepared granular surface cleaned with mechanical broom. As per MORT&H specification No. 503 (Granular Surface) (Analysis)

500

12400

24.8

... More
Providing & laying consolidated B.M. premix with greaded approved coarse aggregate, fine aggregate filler and bitumen content @3.3% as per MORTH/PWD specification including heating bitumen to required temperature, cleaning the surface and providing labour at HMP, the cost of labour, T&P etc. including the cost of material required for proper completion of the work. (Analysis)

25

197400

7896

... More
Providing and applying tack coat with bitumen VG 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surface cleaned with mechanical broom. As per MORT&H specification No. 503 (Granular Surface) (Analysis)

500

5400

10.8

... More
Providing and laying 25 mm thick SDBC with 100-120 T.P.H. batch type HMD producing an average out but of 75 Tones per hour using crushed aggregates of specified grading premixed with VG-30 graded bitumen binder @5% of mix. including all material, labour, T&P etc. all complete as per appd. (Analysis)

13

121602

9354

... More
Supply and fixing of 80mm thick ruber moulding compressed inter locking cement concrete pavers block manufactured by high pressure & controlled vibration machine having plan dimension 200x(160+120mm) with minimum 5mm thick lopping of DP cement mixed with 25% marble powder. The compressivr strength of concrete paver block shall not be less than 30 MPa & Including cost of all material, Labour, T&P etc. required for proper complection of work as directed by engineer in charge

513

396036

772

... More
Supply and laying local sand including supply of all labour, T&P etc.

26

12350

475

... More
Brick edging on both side of road of brick class M-150 8cm wide 12 cm deep in mud mortar etc including labour and supply of brick laid finished to required templates and in proper alignment and also designed and excavated work as directed by E\I. (SI. No. 765/2018)

270

17955

66.5

... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer in-charge upto a distance of 30m from the foundation trenches. (SI. No. 251/2018)

58

8410

145

... More
Concrete with 4 cm gauge Stone ballast fine sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundations and under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (SI No. 281/2018)

23

103270

4490

... More
M-150 class brick work 1:4 one cement & four fine sand of 1.25 Fm mortar in one brick work in foundation and plinth including supply of all materials labour tools and plants etc. required for completion of the work SI no 305/2018

45

191700

4260

... More
Struck cement pointing with cement mortar consisting 1:2 cement and fine sand of 1.25 FM including supply and all material labour T&P etc. respect for proper completion of work. (SI. No. 578/2018)

140

21000

150

... More
Cement concrete with 20mm gauge approved stone grit, course sand and cement in proportions of 4:2:1 including supply of all materials,labour,tools & plants etc required for proper completion of work. (PWD item 279A/2018)

2.5

15287

6115

... More
RCC works with cement approved coarse sand and 2cm gauge approved stone grit in the proportions 1:1.5:3 in slab with having spans excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. Excluding G.S.T. (SI. No. 284/2018)

9.5

76570

8060

... More
M.S. or Iron work in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost of binding wire. (SI.No. 504/2018)

9.2

49275

5356

... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer in-charge upto a distance of 30m from the foundation trenches. (SI. No. 251/2018)

253

36685

145

... More
Supply and laying of 110 mm dia PVC Pipe including all complete.

275

73177

266.1

... More
Making plot connection (for water Line) with necessary fittings, like ferrul, clamp including labour but excluding PVC pipe etc. all complete.

28

8792

314

... More
Providing and fixing of 15 mm dia CPVC pipe for connection including all complete.

180

17100

95

... More
Providing and fixing 150 mm diameter C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc (18.31.3.1/16)

1

3500

3500

... More
Construction of Sluice valve Chamber (0.60 x 0.60 x 0.50) as per drawing & design.

1

3650

3650

... More
Making connection with existing water line.

1

600

600

... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer in-charge upto a distance of 30m from the foundation trenches. (SI. No. 251/2018)

312

45240

145

... More
Concrete with 4 cm gauge Brick ballast fine sand of 1.25 F.M. and cement in proportion of 10:5:1 in foundations and under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (SI No. 281/2018)

25.02

63675

2545

... More
Providing and laying non Pressure NP2 class RCC hume Pipe with Caller Jointed with staff mixture of cement mortar in proportion of 1:2 (1 cement : 2 sand) RCC hume pipe. As per direction of E/I.

280

133280

476

... More
Costruction of Manhole Size ( 1.0 x 1.20 x 1.50) as Per drawing and design at P.D.A. (A/R)

15

356625

23775

... More
Shaft for Manhole Size ( 1.0 x 1.20 x 1.50) as Per drawing and design at P.D.A. (A/R)

1

8832

8832

... More
Costruction of Inspection Chamber Size ( 0.45x 0.45x 0.60) as Per drawing and design at P.D.A. (A/R)

28

106540

3805

... More
Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) up to haunches of S.W. pipes including bed concrete as per standard design : (150 mm Dia) (DSR 19.3.2/2016)

160

65872

411.7

... More
Making connection with main line all complete.

1

78

78.5

... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer in-charge upto a distance of 30m from the foundation trenches. (SI. No. 251/2018)

54

7830

145

... More
Concrete with 4 cm gauge Stone ballast fine sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundations and under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (SI No. 281/2018)

7.25

32552

4490

... More
M-150 class brick work 1:4 one cement & four fine sand of 1.25 Fm mortar in one brick work in foundation and plinth including supply of all materials labour tools and plants etc. required for completion of the work SI no 305/2018

29

123540

4260

... More
M-150 Brick work in 1:4 (1 Cement & four Coarse sand ) mortar in super structure including supply of all materials, labour & tools & plants etc. required for proper completion of work One brick thick wall. (SI. No. 305+309+310/2018)

25

113625

4545

... More
12 mm thick plaster in 1:4 with cement and fine sand mortar including supply of all materials, labour & tools & plants etc. (Sl.No.13.10B/2018 New Item)

302

42280

140

... More
Two Coat white wash on Plaster complete in all respect as Direction by E/I.

302

2718

9



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.