Allahabad Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Allahabad Development Authority - ADA Tender
Eprocure
Opening Date5 Oct 2019
Closing Date18 Oct 2019
Tender Amount₹ 16,04,000
Costs
EMD
₹ 1,61,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_ADAUP_389444_1Bid Award Id
ViewTender No
PDA/Avantikaretender-03/181019Tender Authority
Allahabad Development Authority ViewPurchaser Address
-Website
http://http://adaallahabad.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
M-150 Brick work in 1:4 (1 Cement & four fine sand of 1.25 F.M.) mortar in foundation including supply of all materials, labour & tools & plants etc. required for proper completion of work. (SI. No. 305/2018)
124
-
4260
... More
Struck pointing with cement mortar consisting 1:2 cement and fine sand of 1.25 FM including supply and all material labour T&P etc. respect for proper completion of work. (SI. No. 574/2018)
909
-
150
... More
RCC works with cement approved coarse sand and 2cm gauge approved stone grit in the proportions 1:1.5:3 in slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (SI. No. 284/2018)
4
-
8060
... More
M.S. or Iron work in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost of binding wire. (SI. 504/2018)
4
-
5356
... More
Providing, laying, spreading and compacting of graded stone agg. G.S.B. including all complete.
55
-
1776
... More
Supply, stacking and laying of 80 mm thick ‘I’ shaped cement concrete pavers block M-30 MPa manufactured by high pressure & controlled vibration machine including cost of all material, labour T&P etc. required for proper completion of work as directed by Engineer-in charge (Appd. Rate)
543
-
839
... More
Supply and laying of local sand including supply of all labour T&P etc. complete.
28
-
475
... More
Providing and laying non-pressure NP2 class (light duty) 250 mm dia. R.C.C. pipe with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete. (DSR 19.6.3/2014)
70
-
468.6
... More
Construction of Chamber of 0.60 x 0.60 x 0.90 Mtr. size as per specified design and drawing and specification approved by ADA as per direction by E/I complete. (A.R.)
6
-
6806
... More
Additional or substruction of chamber shaft (0.60x0.60 M) for 1.50 Mtr. or part as per given design and drawing aproved by ADA as per directed by E/I complete. (A.R.)
0.2
-
3574
... More
Making connection of existing sewer line including all complete.
1
-
453
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements