Allahabad Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Allahabad Development Authority - ADA Tender

Works
Eprocure
Opening Date24 Sep 2018
Closing Date5 Oct 2018
Tender Amount₹ 48,90,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Notice inviting tender document with terms and condition
Financial BOQ for bidders rate quote
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and applying primer coat with 80/100 (VG 10) bitumen emulsion using emulsion pressure distributor at the rate of 0.70 kg/sqm. on the prepared bituminus/granular surface cleaned with mechanical broom including prsupply of all materials, labour ,T & P etc.required for proper completion of the work as per clause 503 of MORT & H specifications and as per direction of E/I. (AR)

1602

40050

25

... More
Providing & Laying of bituminus macadam with 100-120 TPH (Tonnes Per Hour) hot mix plant producing an average output of 75 tonnes per hour using crused agregate of grading II (19 mm nominal size ) premixed with 80/100 Bitumenus binder @ 3.25% by wieght of total mix ,transporting the mixed material from the hot mix plant to the work site and laid over a previously prepared surface with pver finisher (hydrostatic with sensor control ) to the required grade ,level and alignment and rolled with smooth wheeled 8-10 tonnes for initial break down rolling , vibratory rollor 8 tonnes for intermediate rolling and finish rolling 6-8 tonnes smooth wheeled tandem roller to achieve desired compaction and incuding supply of all materiak,labour,T & P etc. required for proper completion of the work as per clause 504 of MORT & H specification and as per direction of E/I .(AR)

81

672381

8301

... More
Providing and applying tack coat with 80/100 (VG 10) betumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm. On the prepared betuminus/ granular surface cleaned with mechanical broom incuding supply of all materials,labour, T & P etc. required for proper completion of the work as per clause 503 of MORT & H specifications and as per the direction of E/I (AR).

8007

96084

12

... More
Providing & Laying 25mm S.D.B.C. with 100-120 TPH batch type HMP producing an average out put of 75 tonnes per hour using crussed aggregatesof specified grading ,premixed with bituminus binder @ 5.4 to 5.6 % of mixed and filler ,transporting the hot mix to work site ,Laying with a hydrostatic paver finisher with sensor control to the required grade ,level and alignment ,rolling with smooth wheeled ,vibratory and tendem rollers to achiev the desired compaction complete in all respacts dercted by engineer incharge.

241

2501098

10378

... More
Brick on edge floor with first class bricks laid on edge with brick edging on both sides i/c preparation of sub grade to prescribed camber &i/c supply of bricks,filling joints with sand filled i/c supply of all materials,labour,tools&plants etc. required for completion of the work. .[SI.No.615]

2082

1041000

500

... More
Excavation in foundation in ordinary soil including lift upto 1.50 m and including filling , watering , and ramming of excavated earth into the trenches or into the space between the building and the sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engg-in-charge upto a distance of 30 m.

371

53795

145

... More
Concrete with 4 cm guage stone ballast , fine and of 1.25 fm and cement , in proportion of 8:4:1 in foundation and underfloors including supply of all materials , labour,tools & plants, etc required for proper completion of the work

10

44900

4490

... More
Cement Concrete with 2 cm guage approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, tools & plants etc. required for proper completion of the work.

3

18345

6115

... More
M-150 Brick work in one cement & four FINE sand of 1.25 F.M mortar in foundation & plinth including suplly of all materials , labour , T & P etc. required for proper completion of the work

20

85200

4260

... More
Stuck point with cement mortor consisting of 1part cement and2parts of fine sand of 1.25fineness modulas. Including supply of allmaterial, labourand T&P etc required for proper complection of the work.

279

41850

150

... More
R.C.C Work with cement,approved coarse sand & 2cm. Gauge approved stone grit in proportions of 1:1.5:3 in slabs exclud supply of reinforcement & its bending,but i/c its fixing & binding the same with 24 B.W.G.G.I.binding wire & i/c necessary centering & shuttering etc. & supply of all materials, labour ,T& P etc.required for proper completion of the work i/c cost of binding wire.The rate excludes making of drip course which shall be paid extra.[SI.No.5.12 New Item-2018]

3

24180

8060

... More
M.S.(tor steel or plain) in plain work such as R.C.C.or R.B.work i/c bending for proper shape & i/c supply of steel & its wastage, bend, hooks & auth orized overlapping shall be measured & i/c cost of binding wire. [SI.No.504]

3.6

19281

5356



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.