Allahabad Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Allahabad Development Authority - ADA Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date31 Jan 2023
Closing Date6 Feb 2023
Tender AmountRefer Documents
Costs
EMD
₹ 1,34,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_ADAUP_770581_1Bid Award Id
ViewTender No
PDA/Civil-Naini-96/31-01-22Tender Authority
Allahabad Development Authority ViewPurchaser Address
-Website
http://http://adaallahabad.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of grannul sub-base with power road rooller of 8 to 12 tonne capacity after excavating earth to an average of by providing close graded material of Grade-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
493
875568
1776
... More
Supply and fixing of 80mm thick rubber moulding compressed inter locking cement concrete pavers block manufactured by high pressure & controlled vibration machine having plan dimension 200x(160+120mm) with minimum 5mm thick lopping of DP cement mixed with 25% marble powder. The compressivr strength of concrete paver block shall not be less than 30 MPa & Including 5cm thick local sand in base & cost of all material, Labour, T&P etc. required for proper complection of work as directed by engineer in charge. (Approved Rate) (A/R)
1852
2157376
1164.89
... More
Drain Work Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer in-charge upto a distance of 30m from the foundation trenches. (SI. No. 251/2022)
251
40160
160
... More
Concrete with 4 cm gauge stone bllast Corse sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundations and under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (SI No. 281/2022
53
259700
4900
... More
M-150 Brick work in 1:4 (1 Cement & four coarse sand of 1.25 F.M.) mortar in foundation and plinth including supply of all materials, labour & tools & plants etc. required for proper completion of work. (SI. No. 305/2022)
115
609500
5300
... More
Struck pointing with cement mortar consisting 1:2 cement and fine sand of 1.25 FM including supply and all material labour T&P etc. respect for proper completion of work. (SI. No. 574/2022)
476
93772
197
... More
Cement concrete work 1:2:4 with cement, coarse sand and 2cm gauge stone grite including labour,tools, plants all completeof work as per si no 279a /2022)
18
138600
7700
... More
RCC works with cement approved coarse sand and 2cm gauge approved stone grit in the proportions 1:1.5:3 in slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (SI. No. 284/2022)
8
74400
9300
... More
M.S. or Iron work in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost of binding wire. (SI. 504/2022) .
8
49600
6200
... More
Water Main Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer in-charge upto a distance of 30m from the foundation trenches. (SI. No. 251/2020)
386
61760
160
... More
(A) 110 mm Dia HDPE pipe PN-6: Class PE-100
170
55452
326.19
... More
(B) 90 mm Dia HDPE pipe PN-6: Class PE-100
334
76529
229.13
... More
Making plot connection (for water line) with necessary fitting like ferule, clamp, labour but excluding pvc pipe ete .all complete.
47
14758
314
... More
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge-External Works (DSR-18.9.1/2016)
333
37529
112.7
... More
Providing and fixing 100mm diamater C.I. sluice valves (with cap) complete with bolts, nuts rubber insertions etc.DSR (18.31.1.2)/2021
2
7891
3945.85
... More
Construction of Sluice valve Chamber (0.60X0.60X0.50) as per drawing & design.
2
10400
5200
... More
Making connection with Water Main line.
3
1800
600
... More
Sewer Work Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer in-charge upto a distance of 30m from the foundation trenches excluding royalty and GST. (SI. No. 251/2022)
539
86240
160
... More
Concrete with 4mm gauge approved stone ballast, coarse sand and cement in proportions of 1:4:8 in foundations and under floors including supply of all materials, ,abour, tools & plants etc. red recluding supply of all materials, labour, T&P etc. required for proper completion of all work. (Sl. No. 281/2022)
39
191100
4900
... More
(A) 250 mm Dia-(60+123) -183
183
97722
534
... More
(B) 300 mm Dia -151.0 m
151
93167
617
... More
(C) 450 mm Dia -170.0 m
170
175440
1032
... More
Construction of Mane hole size (1.0.1X1.20X1.50) as per drawing & design.
30
958500
31950
... More
Shaft construction of Mane hole size (1.0X1.20X1.50) as per drawing & design.
7.5
-75750
-10100
... More
Construction of inspection Chamber size (0.45X0.45X0.60) as per drawing & design.of PDA (A/R)
47
188470
4010
... More
Providing and fixing 110mm dia PVC pipes for weep hole including making good the walls with cost of all labour and materials complete as per direction of Engineer in Charge. (AR)
223
71226
319.4
... More
Making Sewer connection with main line all complete.
9
706
78.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements