Allahabad Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Allahabad Development Authority - ADA Tender

Works
Civil Works Others
Eprocure
Opening Date7 Nov 2018
Closing Date17 Nov 2018
Tender Amount₹ 30,95,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Notice inviting tender document with terms and condition
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCC works with cement approved coarse sand and 2cm gauge approved stone grit in the proportions 1:1.5:3 in column / wall excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (SI. No. 289/2018)

4

34000

8500

... More
RCC works with cement approved coarse sand and 2cm gauge approved stone grit in the proportions 1:1.5:3 in slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (SI. No. 284/2018)

10

80600

8060

... More
M.S. or Iron work in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost of binding wire. (SI. 504/2018)

243

1301508

5356

... More
M-150 Brick work in 1:3 cement & coarse sand mortar in foundation/plinth including supply of all materials, labour & tools & plants etc. required for proper completion of work. (SI.No. 307A/2018)

63

283500

4500

... More
Providing and fixing 18 mm thick granite of any colour saw cut, mirror polished, premoulded and prepolished, machine cut for platforms and podium etc. all complete (DSR 8.2.2.1/2016)

202.3

815066

4029

... More
Extra for providing moulding edge granite all complete.

88

18656

212

... More
Arrangement of specific steel plate, nut and bolts as required for fixing of statue.

1

10000

10000

... More
Arrangement of estaiblishment of statue on podium etc. all complete as per direction of E/I.

1

150000

150000

... More
Earth work in cutting in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M in depth and earth work in embankment to be in 20cm layers including ramming & dressing the surface to required level & slopes and also including 1.50M lift and 30 M lead the earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 Mtr. distance as directed by E/I. (SI. No. 253/2015)

80

7360

92

... More
Cement Concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of all work. (Sl. No. 281/2018)

22

98780

4490



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.