Allahabad Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Allahabad Development Authority - ADA Tender
Eprocure
Opening Date19 Dec 2019
Closing Date30 Dec 2019
Tender Amount₹ 43,40,900
Costs
EMD
₹ 4,17,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_ADAUP_414524_1Bid Award Id
ViewTender No
PDA/Hort-02/301219Tender Authority
Allahabad Development Authority ViewPurchaser Address
-Website
http://http://adaallahabad.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
R.C.C. work with cement approved coarse sand 2cm Gauge approved stone grit in proportions of 1:2:4 in
R.C.C. column excluding supply of reinforcement and Its bending but including its fixing and binding the same
With 24 B.W.G.G.I. Binding wire and including necessary
Centring and shuttering etc. and supply of all materials
Labour, T&P etc. required for proper completion of the Work including cost of binding wire. The rate excludes
Making of drip course which shall be paid extra. (287A/2018)
218
-
7225
... More
M.S. (tor steel or plain) in plain work such as RCC or R.B.
Work including bending for proper shape and including
Supply of steel & its wastage bend, hooks and authorised
Overlapping shall be measured and including cost of Binding wire. (504/2018)
77
-
5356
... More
Steel work in built-up tubular Hot finished welded type
Tubes (round, square or rectangular hollow tubes etc)
Trusses etc. Including cutting, hoisting, fixing in position
And applying a priming coat of approved steel primer,
Including welding and bolted with special shaped Washers etc. complete. (DSR 10.16.1/16)
8580
-
88
... More
Providing and applying white cement based putti of Average thickness 1mm. of approved brand and
Manufacturer over the plastered wall surface to prepare
The surface even and smooth complete.(DSR 13.80/16
792
-
80
... More
Painting on varnishing new work in small area or new Wood work with one coat (upto one sq.Mt.)of ready
Mixed priming paint and two coat of approved superior
Quality ready mixed paint or varnish including supply of
All materials, labour and tools and plants etc. required For proper completion of the work. Paint to be used Should confirm the I.S.I. No.-103-1950(641+642/2018
1452
-
99
... More
Supply and stacking of Good earth at site including Carriage upto 5.0km. complete (earth measured in Stacks will be reduced by 20% for payment)(DSR 2.2/20
928.58
-
300
... More
Providing and fixing of Sign Boards with 35x35x5mm.
Angle fram with R.C.C. in 4:2:1 grouting complete as Per drawing and design etc. all complete in direction of E/I Charge.(AR)
1
-
4350
... More
Providing and fixing 15mm nominal outer dia Chlorinated
Polyvinyl Chloride (CPVC) pipes, having thermal stability
For hot and cold water supply, including all CPVC plain
And brass threaded fittings, including fixing the pipe With clamps at 1.00m. spacing. This includes jointing of
Pipes & fittings with one step CPVC solvent cement and testing of joins complete as per direction of Engineer
in charge. (P.W.D. Anl. R.)
280
-
83.3
... More
Providing and fixing 15mm. Nominal bore brass stop cock
Of approved quality. (PWD Anl. R)
20
-
191
... More
Boring with 100mm diameter casing pipe for hand pump
/Tube well, in all soils except ordinary hard rocks requiring blasting, including removing the casing pipe after the hand pump/tube well is lowered and tested up to 30m. with 1H.P. Submersible pump complete. (A.R.)
1
-
88120
... More
12mm. thick plaster in 1:4 cement & fine sand mortar including Supply of all material, labour T&P etc. required for Proper completion of the work. (597C/2018)
200
-
140
... More
Finishing wall with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of the work. (660+661/2018)
200
-
75
... More
Providing and welding the approved P.D.A.’s Logo iron Plate at prefixed rallying at site including all complete (including welding & cartage etc.)
85
-
351
... More
Cartage of Malba/dismantle material upto 8km.
270
-
217
... More
Dismantling lime or cement mortar brick work including
Stacking of dismantled materials with in 60m distance as
Directed by Engineer in charge.(692/2018)
6.5
-
400
... More
Trenching in ordinary soil upto depth of 60cm. including
Remoble of stacking of sarvisoble material & then Disposing of surpluse said by spreadry & neally lading With in a lead of 50m. & making up the trenched area
To proper level by filling with earth. (DSR Hort. 2.1/2018
1072.5
-
35.5
... More
S/stalking of site dump manuar from app. Source Including carriage upto 1km. (DSR Hort. 2.4.3/2018)
89.37
-
234.8
... More
Rough dressing trench ground & brecking clods.
(DSR Hort. 2.5/2018)
1787.5
-
0.69
... More
Uprooting rank vegetation from trench area after 10-15
Days of its flooding with water including disposed of Uprooted vegetation (DSR Hort. 2.6/2018)
1787.5
-
2.2
... More
Fine dressing trench ground (DSR Hort. 2.7/2018)
1787.5
-
1.7
... More
Spreeding of sludg manuar & good earth required
Thickness.(DSR Hort. 2.8/2018)
89.37
-
24.35
... More
Mixing earth & manuar required proportion specified
Directed by in-charge.(DSR Hort. 2.9/2018)
89.37
-
16.55
... More
Providing & laying selection-1 grass turf with earth
50mm to 60mm thickness of existing ground prepared
With proper level and ramming with tools wooden and
Than rolling the surface with light roller make the Surface smoothen and light watering the same, with
Sprinkler and maintenance for 30 days or more till the
Grass established properly as per direction of officer in
Charge. (DSR Hort. 2.34/2018)
1000
-
74.9
... More
Preparation of bed for shubberi borger excavation 60cm.
Deep & trenching the excavated base to a further depth
60cm. refilling the excavated earth after breacking clods
& mixing shulg manuar 2:1 disposal of un surbisable Material neatly levelling refilling the excavated earth
After breacking clods & mixing shulg manuar 2:1 disposal
Of un surbisable material neatly levelling.
(DSR Hort. 2.13/2018)
144
-
100.2
... More
Digging of hole in ordinary soil 60x60cm. dia & deep Excavated earth refilling the same and mixed with
Manure 2:1 flooding with water & neatly levelling Including remoble of rubbish & surplus earth if any
With lead and left.(DSR Hort. 2.14.3/2018)
114
-
30.1
... More
Supply & putting of Hedge plants surrounding path
Enermy/Duenta 0.30 fit height. (DSR Hort. 6.12/2018)
4000
-
21.55
... More
Supply & putting of different varieties shrubs plants
Healthy poly pack 6 fit height.
1. Phinex (10217/18)
10
-
525
... More
2. Plumaria Alba(10325/18)
30
-
225
... More
3. Croten ducktel (3.34/18)
44
-
112.75
... More
4. Ficus black(8.23/18)
15
-
250
... More
5. Areca Palm(3.20/18)
25
-
193.75
... More
S/putting of palm plants well developed multi branches
1.65H. healthy. Mascarina palm etc. (5.36/18) deduct Cost of pot 2.29/18)(1845-215.50)
12
-
1630
... More
Anty termite treatment of lawn area through premise
30.50% I.P. 1L. Diluted in 499L. water and applying Solution 1L. Solution per Sqm.(2.56/18)
1342.28
-
7.15
... More
Maintinance of park 1 year continue garden feature Lawn, hedge, shurbes, flower bed, hoing, weeding, Watering, mowing and related work (Fertilizer manuar/
Insectiside excluded) (DSR 2.40.5/2018Hort.)
21450
-
2.1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements