Allahabad Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Allahabad Development Authority - ADA Tender
Civil Works Others
Eprocure
Opening Date7 Mar 2020
Closing Date21 Mar 2020
Tender Amount₹ 30,21,000
Costs
EMD
₹ 61,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_ADAUP_445262_1Bid Award Id
ViewTender No
PDA/Civilwork-03/21320Tender Authority
Allahabad Development Authority ViewPurchaser Address
-Website
http://http://adaallahabad.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Sale of old Bricks Bats (SI.No. 2C/2018)
8.28
-
-490
... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer in-charge upto a distance of 30m from the foundation trenches. (SI. No. 251/2018)
127
-
145
... More
Cement Concrete with 40 mm gauge approved stone ballast, coarse sand and cement in proportions of 8:4:1 including supply of all materials, labour, T&P etc. required for proper completion of all work. (Sl. No. 281/2018)
21
-
4490
... More
M-150 class brick work 1:4 one cement & four fine sand of 1.25 Fm mortar in one brick work in foundation and plinth including supply of all materials labour tools and plants etc. required for completion of the work SI no 305/2018
139
-
4260
... More
M-150 Brick work in 1:4 (1 Cement & Four fine sand of 1.25 F.M.) mortar in super structure including supply of all materials, labour & tools & plants etc. required for proper completion of work Half brick thick wall. (SI.No. 305+ 309+310A+310/2018)
69
-
4950
... More
RCC works with cement approved coarse sand and 2cm gauge approved stone grit in the proportions 1:1.5:3 in RCC Column having spans excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (SI. No. 289/2018)
37
-
8500
... More
RCC works with cement approved coarse sand and 2cm gauge approved stone grit in the proportions 1:1.5:3 in lighter beam having spans upto 6 M excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour T&P etc. required for proper completion as per direction of E/I. (SI. No. 285/2018)
33
-
8550
... More
Cement concrete with 20mm gauge approved stone grit, course sand and cement in proportions of 4:2:1 including supply of all materials,labour,tools & plants etc required for proper completion of work. (PWD item 279A/2018)
3
-
6115
... More
M.S. or Iron work in Plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost of binding wire. (SI. 504/2018)
83
-
5356
... More
Supply & fixing of M.S. Iron work of heavy sizes such as Trusses built up gates, record racks, roof work, Gates etc. including supply of steel bolts, nuts wastage, etc. and their fixing required for proper completion of the work.(SI. 503/2018)
5
-
5922
... More
12 mm thick plaster in 1:4 with cement and fine sand mortar including supply of all materials, labour & tools & plants etc. (Sl.No.13.10B/2018 New Item)
2970
-
140
... More
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: Painting two coats on new work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) (DSR 13.47.1/2018)
2970
-
161.15
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements