Aligarh Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Aligarh Development Authority - ADA Tender

Works
Civil And Construction
Eprocure
Opening Date22 Jan 2019
Closing Date5 Feb 2019
Tender Amount₹ 49,80,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and stacking of 25-50mm gauge hard stone ballast including all labour, material T&P octori charges etc all complete for proper completion of the work.

176

-

2068.9

... More
Supply and stacking of stone dust for consolidation including all labour, material T&P octori charges etc all complete for proper completion of the work.

32

-

1943.9

... More
Consolidation of hard stone ballast of size 2S-50 mm. by road roller for 10 cm. (loose) thick coat including open out stacks, sorting into sizes. repairing patches in existing road surface making medhi to retain water and Ramming and also including carriage of metal upto 30 m and carriage of water up to 200 m. Supply and maintenance of barriers and all tools and plants etc. required for the proper completion of the work.

352

-

280

... More
Laying cement concrete. road slab with cement approved coarse sand & 2 cm. Gauge approved stone grit in proportion of 1:1:5:3 including preparation of subgrade after its rectification and bringing it to proper camber including supply of all materials, labour, Tools & plants including polythen sheet, thermacoal and filling of joints with bitumen etc. required for proper completion of the work. (PWD SOR SI. No. 279 A/2015)

264

-

7550

... More
M.S. (tor steel or plain) in plain work such as R.C.C. or R.B, work including bending for proper shape & including supply of steel & its wastage, bend, hooks and authorized overlapping shall be measured and including cost of binding wire 16 mm. dia bar used ( 8mm to 12mm) [ SI. No. 504(2) & (3)/2015]

52

-

5650

... More
Drain & Culvert

-

-

-

... More
Earth Work in excavation in foundation trenches in ordinary soil (Loam, Clay or sand) including laft up to 1.50 M and lead up to 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation trenches or into the plinth and removal and disposal of surplus Earth as directed by the engineer-in-charge up to a distance of 30 m from the foundation trenches.

76

-

125

... More
Cement Concrete with 4 cm. gauge stone ballast, fine sand of 1.25 F.M. & cement in proportion of 12:6:1 in foundation & under floors including supply of all materials. labour. Tools & plants etc. required for proper completion of the work.

76

-

3650

... More
M-100 Brick work in 1:4 (one cement & four coarse sand) mortar in foundation & plinth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

138

-

4458

... More
12 mm thick plaster with cement & coarse sand in 1:4 over brick work minimum thickness not to be less than 1.0 cm. including supply of all materials, labors, tools & plants etc. required for proper completion of E/I

600

-

145

... More
Concrete with 2 cm. Gauge approved stone ballast, coarse sand and cement in foundation and under floors in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

26.5

-

6300

... More
R.C.C work with cement approved coarse sand & 2cm. Gauge approved stone grit in proportion of 1:1:5:3 in slabs xclude suppy of rein for cement & its bending, but i/c fixing & binding the same with 24 B.W.G.G.l. binding wire & including necessary centering & shuttering etc. & supply of all materials, labour, Tools & plant etc. required for proper completion of the work i/ccost of binding wire The rate excludes making of drip course which shall be paid extra [ SI. No. 284(a)/2015]

4.2

-

8250

... More
M.S. (tor steel or plain) in plain work such as R.C.C. or R.B, work including bending for proper shape & including supply of steel & its wastage, bend, hooks and authorized overlapping shall be measured and including cost of binding wire 16 mm. dia bar used ( 8mm to 12mm) [ SI. No. 504(2) & (3)/2015]

4.5

-

5650



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.