Aligarh Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Aligarh Development Authority - ADA Tender
Civil And Construction
Road Construction
Eprocure
Opening Date13 Dec 2023
Closing Date22 Dec 2023
Tender Amount₹ 74,66,000
Costs
EMD
₹ 1,49,000Document Cost
₹ 9,700Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_ALIDA_870117_7Bid Award Id
ViewTender No
10653/abhianu/ada/23-24Tender Authority
Aligarh Development Authority ViewPurchaser Address
-Website
http://www.adaaligarh.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and applying Primer coat with bitumen emulsion slow setting using spray set including cleaning of road surface and spraying primer at the rate of 0.50 kg per sqm with mechanincal means,
3360
104664
31.15
... More
Providing and Laying Bituminous Macadam with 100-200 TPH hot mix plant producing an average output at 25cum /Hour using a crushed aggregate of specified grading premixed with bituminous binder @ 3.4% transported to the site land over a previously prepared surface with paver finisher to the required grade level and alignment and rolled as per clauses 501,6 and 501,7 to achieve the desired completion.
252
2036412
8081
... More
Providing and laying tack coat with VG-10 using bitumen pressure at the rate of 0.30 kg. Per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Complete as per direction of engineer in charge as per MORT&H. Specification clauses 507 complete in all respects.
3360
57456
17.1
... More
Providing and Laying Semi-Dence Bituminous Concrete with 100-200 TPH batch type type HMP producing an average output of 25cum/Hour using a crushed aggregate of specified grading premixed with bituminous binder @ 5.0% by weight of total mix and filler transported to the site land over a previously prepared surface laying with hydrostic paver finisher to the required grade level and alignment and rolled as per MORTH specification clauses 508 to achieve the desired completion 135 take output=135 Taken output=195cum(450 tonnes) density 2.30cum.
135
1417230
10498
... More
Providing and Laying of hot applied thermoplastic compound 2.50 mm thick including reflectorising glass beads @ 250 gms. Per sqm area thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level uniform and fee from streaks and holes.page 88
120
74160
618
... More
Surface Dressing of the ground including removing vegetation and in-equalities not exceeding 15cm deep and disposal of rubbish lead up to 50m and lift upto 1.50m UPPWD SOR 2022 SI No 2.28.1 page 26
3840
46080
12
... More
Disposal of surplus earth excavated earth rubbish Malba etc.by mechanical transport completeas per direction of E/I up to any lead and lift. UPPWD SOR 2022 SI No 10 New page 26
576
92160
160
... More
Concrete with 2 cm. Gauge approved stone ballast, coarse sand and cement in foundation and under floors in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. Required for proper completion of the work. UPPWD SOR SI No 279 SOR 2022
11.5
79350
6900
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements