Aligarh Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Aligarh Development Authority - ADA Tender

Works
Civil And Construction
Eprocure
Opening Date22 Jan 2019
Closing Date5 Feb 2019
Tender Amount₹ 10,53,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
M.S. (tor steel or plain) in plain work such as R.C.C. or R.B, work including bending for proper shape & including supply of steel & its wastage, bend, hooks and authorized overlapping shall be measured and including cost of binding wire 16 mm. dia bar used ( 8mm to 12mm)

5

28250

5650

... More
Providing and Fixing of 80mm thick factory made cement concrete interlocking tiles paver block M-30 grade made by block making machine strong vibratary compactor and approved size, design & shape laid in required colour & patterm as per direction of

185

148000

800

... More
Drain & Culvert

-

-

-

... More
Earth Work in excavation in foundation trenches in ordinary soil (Loam, Clay or sand) including laft up to 1.50 M and lead up to 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation trenches or into the plinth and removal and disposal of surplus Earth as directed by the engineer-in-charge up to a distance of 30 m from the foundation trenches.

30

3750

125

... More
Cement Concrete with 4 cm. gauge stone ballast, fine sand of 1.25 F.M. & cement in proportion of 12:6:1 in foundation & under floors including supply of all materials. labour. Tools & plants etc. required for proper completion of the work

7

25550

3650

... More
M-100 Brick work in 1:4 (one cement & four coarse sand) mortar in foundation & plinth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. [ SI. No. 305 (a)/ 2015]

16

72800

4550

... More
12 mm thick plaster with cement & coarse sand in 1:4 over brick work minimum thickness not to be less than 1.0 cm. including supply of all materials, labors, tools & plants etc. required for proper completion of E/I [

80

11600

145

... More
Concrete with 2 cm. Gauge approved stone ballast, coarse sand and cement in foundation and under floors in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

2

12600

6300

... More
park

-

-

-

... More
Earth Work in excavation in foundation trenches in ordinary soil (Loam, Clay or sand) including laft up to 1.50 M and lead up to 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation trenches or into the plinth and removal and disposal of surplus Earth as directed by the engineer-in-charge up to a distance of 30 m from the foundation trenches.

34

4250

125

... More
Cement Concrete with 4 cm. gauge stone ballast, fine sand of 1.25 F.M. & cement in proportion of 12:6:1 in foundation & under floors including supply of all materials. labour. Tools & plants etc. required for proper completion of the work [ SI. No. 273/2015]

8

29200

3650

... More
M-100 Brick work in 1:4 (one cement & four coarse sand) mortar in foundation & plinth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. [ SI. No. 305 (a)/ 2015]

30

136500

4550

... More
M-100 Brick work in 1:4 (one cement & four coarse sand) mortar in super structure in one brick thick wall including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. [ SI. No. 305 (a)/ 2015]

28

134400

4800

... More
12 mm thick plaster with cement & coarse sand in 1:4 over brick work minimum thickness not to be less than 1.0 cm. including supply of all materials, labors, tools & plants etc. required for proper completion of E/I [ SI. No. 282 (ii)/ SOR-2015]

235

34075

145

... More
Concrete with 2 cm. Gauge approved stone ballast, coarse sand and cement in foundation and under floors in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.

1

6300

6300

... More
Mild steel or iron work in heavy sizes such as trusses,built up gates,record racks,roof work,gates etc. brought to required form including drilling holes revitting or welding where necessary and also including supply of steel bolts,nuts,wastage etc. and thair fixing required for proper completion of the work.

2

12400

6200

... More
Finishing walls with water proofing cement paint of approved Ariake; such as Super-Snowcern, Durocem,- Robiance, Guttucem, Supercem quality and of required shade on under coated wall surface (One. coat) over and including one coat whire cernerii primer to give and even shads after thoroughly after brushing the Surface to. [PWD SOR 2015 SI. No.660+661]

235

18917

80.5

... More
Painting two coat over priming coat ) on steel and Other* Metal sufaces upto 10cm width or girth or small articles not exceeding 0.10.Sq..M..in.area . with superior synthetic enamel such as LOxol 3, Hi gloss. Apcolite, Superlac, Dulux specified brushing to give and even. shade and including the cleaning the- surface of all dirt, dust and other foreign matter sand papering and scrapping. including cost of all materials, labour, tools and plants etc. required for proper coMpletion of work,

3

274

91.5

... More
Earth work in filling or in embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 0.5 M in depth & earth work in embankment to be in 20 cm Layers including ramming and dressing the surface to required levels and slopes and also including 1.50 M lift and 8 km lead The earth from cutting to be used in making embankment or to be deposited as spoil banks with in 30 M distance distance as directed by the Engineer in charge.

711

178176

250.6

... More
Dismantling of brick work or stone work in lime or cement mortar and including stacking of material as directed by engineer incharge within a distance of 60 mt.

16

8000

500

... More
Recovery of bricks from contractors bill as per direction of engineer in charge.

5900

31860

5.4

... More
Recovery of brick bats from contractors bill as per direction of engineer in charge.

3

1500

500



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.