Aligarh Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Aligarh Development Authority - ADA Tender
Civil And Construction
Eprocure
Opening Date22 Jan 2019
Closing Date5 Feb 2019
Tender Amount₹ 43,19,000
Costs
EMD
₹ 4,16,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_ALIDA_297444_1Bid Award Id
ViewTender No
(2)349/abhivi/ada/2018-19Tender Authority
Aligarh Development Authority ViewPurchaser Address
-Website
http://www.adaaligarh.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply and stacking of stone dust for consolidation including all labour, material T&P octori charges etc all complete for proper completion of the work.
47
-
1943.9
Consolidation of hard stone ballast of size 2S-50 mm. by road roller for 10 cm. (loose) thick coat including open out stacks, sorting into sizes. repairing patches in existing road surface making medhi to retain water and Ramming and also including carriage of metal upto 30 m and carriage of water up to 200 m. Supply and maintenance of barriers and all tools and plants etc. required for the proper completion of the work.
231
-
280
Laying cement concrete. road slab with cement approved coarse sand & 2 cm. Gauge approved stone grit in proportion of 1:1:5:3 including preparation of subgrade after its rectification and bringing it to proper camber including supply of all materials, labour, Tools & plants including polythen sheet, thermacoal and filling of joints with bitumen etc. required for proper completion of the work.
237
-
7550
M.S. (tor steel or plain) in plain work such as R.C.C. or R.B, work including bending for proper shape & including supply of steel & its wastage, bend, hooks and authorized overlapping shall be measured and including cost of binding wire 16 mm. dia bar used ( 8mm to 12mm) [
56
-
5650
Drain & Culvert
-
-
-
Earth Work in excavation in foundation trenches in ordinary soil (Loam, Clay or sand) including laft up to 1.50 M and lead up to 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation trenches or into the plinth and removal and disposal of surplus Earth as directed by the engineer-in-charge up to a distance of 30 m from the foundation trenches.
146
-
125
Cement Concrete with 4 cm. gauge stone ballast, fine sand of 1.25 F.M. & cement in proportion of 12:6:1 in foundation & under floors including supply of all materials. labour. Tools & plants etc. required for proper completion of the work.
73
-
3650
M-100 Brick work in 1:4 (one cement & four coarse sand) mortar in foundation & plinth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
102
-
4458
12 mm thick plaster with cement & coarse sand in 1:4 over brick work minimum thickness not to be less than 1.0 cm. including supply of all materials, labors, tools & plants etc. required for proper completion of E/I
442
-
145
Concrete with 2 cm. Gauge approved stone ballast, coarse sand and cement in foundation and under floors in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
25.5
-
6300
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements