Aligarh Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Aligarh Development Authority - ADA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date14 Nov 2023
Closing Date25 Nov 2023
Tender Amount₹ 40,76,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Mild steel or iron work in plain work such as reinforced concrete brought to required shape as neccesarry including bending for proper completion of the work and including the supply of steel and its waistage bend hook and authorized over lapping shall be measured upto floor to level.

34

258400

7600

... More
Earth work in excavation in foundation trenches in ordinary soil(Loam, Clay or Sand) including laft upto 1.50 M and lead up to 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the side of the foundation trenches ot into the plinth and rewmoval and disposal of surplus Earth as directed by the engineer-in-charge up to a distance of 30m from the foundation trenches.SI No 251 UPPWD SOR-2022

42

6300

150

... More
Cement concrete with 4cm gauge stone ballast, fine sand of 1.25 F.M & cement in propotion of 8:4:1 in foundation & under floors including supply of all materials , labour, tools & plants etc. Required for proper completion of the work SI No 275(a) UPPWD SOR-2022

17

100300

5900

... More
Brick work with common burnt clay F.P.S (non modular) bricks of class Mdesignation -100 class brickwork 1:4 Cement and Coarse sand for foundation and Plinth UPPWD SOR 2022 SI no 6.1.1 page 30

138

759000

5500

... More
12cm thick plaster with cement and course sand of 1.25 fineness modulus in 1:4 over brick work minimum thickness not be less than 1 cm including supply of all material ,labour tools and plants etc required for proper completion of work.

1638

311220

190

... More
Concrete with 2 cm. Gauge approved stone ballast, coarse sand and cement in foundation and under floors in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. Required for proper completion of the work.SI No. 279 SOR 2022

11

75900

6900

... More
Laying of 80mm I-shaped precast Interlocking tiles of thickness 80 mm.(Compressive strength not less than 30Mpa and weight 4.50 kg ) including 25 mm thick local sand base levelling and dressing of surface to required level and slope filling joint with local sand all complete work.UPPWD SOR-2022 page 70

777

586635

755

... More
Finishing wall (Two Coat ) with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undercoated wall surface to give even shade including one coat of primer applied curing cost of all material labour T&P etc.SI.No (13.46.1) SOR 2022 Page 63

1260

176400

140



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.