Airports Authority Of India Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Airports Authority Of India - AAI Tender

Works
Transportation and Logistics
Machinery and Tools
Eprocure
Opening Date15 Oct 2022
Closing Date19 Nov 2022
Tender Amount₹ 1,16,21,296 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

1961

-

-

... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil

3

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.

9

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)

1

-

-

... More
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)

60

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Edges of slabs and breaks in floors and walls: Above 20 cm wide

16

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete , excluding the cost centring , shuttering , finishing and reinforcement - All works up to plinth level : 1:1.5:3 ( 1 cement : 1.5 coarse and sand : 3 graded stone aggregate 20mm nominal size)

110

-

-

... More
Steel reinforcement for R.C.C work including straightnening , cutting , bending , placing in position and binding all complete upto plinth level. A) Thermp - Mechanically treated bars of grade Fe-500D or more.

9960

-

-

... More
Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge.

2046

-

-

... More
Carriagae/ transportation of all dismanteled Steel Material of Fencing and accessories etc . by tractor with trolley including Loading, transporting , unloading and stacking properly to AAI store yard as directed by EIC in AAI premisis. Necessary required tools to be arranged by the contractor. The dismetalled material is to be measured and weighted and to be recorded and same to be submitted to EIC.

1

-

-

... More
SH III - AICMC , Operation and Routine Maintenance of Gates All inclusive Comprehensive maintenance per year of the entire system of sliding trolley gate ( automation system with drives, electrical panels, wheels, bearings, chain sprouket /gear system , toothed track ,bottom track as provided under the main contract including trouble shooting , preventive maintenance and break down maintenance as required as per good engineering practice and recommendation of the original equipment manufacturer, instructions of Engineer -in Charge & as per terms and conditions specified in special conditions of contract is to be followed. (a) For first year (after completion of one year defect liability period )

1

-

-

... More
(b) Second Year

1

-

-

... More
(c) Third Year

1

-

-

... More
(d) Fourth Year

1

-

-

... More
(e) Fifth Year

1

-

-

... More
All inclusive Comprehensive maintenance per year of existing Boom Barrier of Selve/Cardin make includind drives /card , electrical and mechanical parts, push button for operation etc. complete for the smooth operation of Boom Barries including trouble shooting , preventive maintenance and break down maintenance as required as per good engineering practice and recommendation of the original equipment manufacturer, instructions of Engineer -in Charge & as per terms and conditions specified in special conditions of contract is to be followed. (a) For first year ( Shall be effective after the award of the work )

2

-

-

... More
(b) Second Year

2

-

-

... More
(c) Third Year

2

-

-

... More
(d) Fourth Year

2

-

-

... More
(e) Fifth Year

2

-

-

... More
(f) Sixth Year

2

-

-

... More
Operation & Routine Maintenance of entire system of sliding trolley gate and 02 Nos of Boom Barrier complete in one shifts (8hrs. shift) in all working days manned by Technician (skilled)-01 no. and Helper -01 no. on all days including Sundays and Holidays for smooth operation of the gates. '(a) First Year during DLP

1

-

-

... More
(b) Second Year after DLP

1

-

-

... More
(c) Third Year after DLP

1

-

-

... More
(d) Fourth Year after DLP

1

-

-

... More
(e) Fifth Year after DLP

1

-

-

... More
(f) Sixth Year after DLP

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.