Airports Authority Of India Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Airports Authority Of India - AAI Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date11 Jan 2022
Closing Date1 Feb 2022
Tender Amount₹ 66,11,780 
Notes
Download

Costs

Summary

Expansion Of Passenger Terminal Building At Gorakhpur Civil Enclave, Gorakhpur. Sub Head Design, Fabrication, Supply, Installation, Testing And Commissioning Of Elevator And Escalator

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
AICMC of Elevator

-

-

-

... More
All inclusive comprehensive maintenance contract of 01 no complete Electric Traction Type machine room less passenger elevator system after defect liability period, including all electrical/ mechanical equipment safety control installed under this contract of 16 passenger capacity elevators with 2 stops & 2 openings, i/c control panels, complete as specified in above item no. 1 as per technical specification and scope of work.

-

-

-

... More
After Defect liability period (01 Year)

-

-

-

... More
First year after DLP (4% of SITC cost including frieght, insurance, transportation etc.)

1

-

-

... More
Second year after DLP (4% commulative enhancement on first year cost)

1

-

-

... More
Third year after DLP (5% commulative enhancement on second year cost)

1

-

-

... More
Fourth year after DLP (5% commulative enhancement on third year cost)

1

-

-

... More
Fifth year after DLP (5% commulative enhancement on forth year cost)

1

-

-

... More
SH: II SITC of Escalator

-

-

-

... More
Supply, installation, testing & commissioning of reversible outdoor commercial type escalators having capacity of 6000 passengers per hour at an operating speed of 30 linear meter per minute, having width not less than 1000mm between interior panel, suitable for following rise from floor to floor ( Height 4.54 Metres approx) with electric motor, control, latest safety devices, control panel i/c stainless steel cladding etc. for operation on 415V, 3 Phase, 50 Hz, AC supply system as required at site and as per enclosed specification with auto start and auto stop, as per attached drawing, conplete as required. Travel height from floor to floor: 4.54 Meter (Approx) with an angle of 30 degree.

1

-

-

... More
AICMC of Escalator

-

-

-

... More
All inclusive comprehensive maintenance contract of 01 no complete commercial type escalators after defct liabilty period having capacity of 6000 passengers per hour at an operating speed of 30 linear meter per minute, having width not less than 1000 mm between interior panel, i/c control panels, complete as specified in above item no. 1 of SH: II as per technical specification and scope of work.

-

-

-

... More
After Defect liability period (01 Year)

-

-

-

... More
First year after DLP (4% of SITC cost including frieght, insurance, transportation etc.)

1

-

-

... More
Second year after DLP (4% commulative enhancement on first year cost)

1

-

-

... More
Third year after DLP (5% commulative enhancement on second year cost)

1

-

-

... More
Fourth year after DLP (5% commulative enhancement on third year cost)

1

-

-

... More
Fifth year after DLP (5% commulative enhancement on forth year cost)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.