Agra Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Agra Development Authority - ADA Tender
Paints and Enamels
Eprocure
Opening Date29 Jan 2024
Closing Date3 Feb 2024
Tender AmountRefer Documents
Costs
EMD
₹ 58,500Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ADAA_886777_3Bid Award Id
ViewTender No
35/1/2023-24Tender Authority
Agra Development Authority ViewPurchaser Address
-Website
http://http://www.adaagra.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge in cement mortar. (CH-17 S.I. No. 6 SOR 2023-24)
2
670
1340
... More
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. (CH-17 S.I. No. 2 SOR 2023-24)
120
1275
153000
... More
Dismantling existing plaster, including disposal of refuse as directed by the E/I. Within a distance of 60mt. (200 feet) (Sl.No-706) SOR 2020-21
130
34
4420
... More
Class-150 (Non Modular) brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. (CH-6 S.I. No. 2 SOR-2023-24)
10
5650
56500
... More
Class-150 (Non Modular) brick work in 1:4 Cement and Coarse sand mortar in super structure above plinth level upto floor five level including necessary cutting and moulding of brick work as required and also including honey combed brick work in thickness of wall more than 12cm. (CH-6 S.I. No. 2+5 SOR-2023-24)
2
6110
12220
... More
15mm thick Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm. In girth and finished even and smooth. (CH-13 S.I. No. 13.5.1 SOR 2023-24) (I) 1 cement : 4 Coarse sand
200
215
43000
... More
Providing and laying cement concrete in 1:1.5:3 (1 Cement : 1.5 Coarse sand : 3 graded stone aggregate 20mm nominal size), and curing complete, including cost of form work. In Foundation and floors. (CH-5 S.I. No. 4.1.2 SOR-2023-24)
35
6900
241500
... More
RCC work Providing and laying in position specified grade of reinforced cement concrete, slab including the cost of centering, shuttering, finishing and excluding reinforcement - Above plinth level upto fifth floor lable: 1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone) (CH-5 S.I. No. 11 SOR 2023-24)
3
8700
26100
... More
Reinforcement of Reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and including the supply of steel and its waistage Bend, hooks, Binding wire and authorized over lapping shall be measured upto floor two level. (S.I. No. 504 SOR 2023-24) 10mm to 12mm tor (TMT Bars) Fe-415
1200
84
101100
... More
Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per (Cost of aluminium snap beading shall be paid in basic item): (CH-9 Item No. 9 SOR 2023-24) (i) With float glass panes of 5.5 mm thickness
10
980
9800
... More
Stone work (machine cut edges) for wall lining etc. (veneer work) upto 10 metre height, backing filled wilh a grout of average 12 mm thick cement mortar 1r3 (1 cement: 3 coarse sand) including pointing in whiie cement mortar 1:2 (1 white cemenl :2 stone dust) with an admixture of pigment malching the slone shade : lfq !q secured to the backinq and the sides !y means of cramps and oins which shall be oaid for 99!!I4!9UI Red sand stone - exposed face fine dressed with rough backing. 30 mm thick (CH-18 Item No. 1 SOR 2023-24)
40
1900
76000
... More
40mm thick fine dressed stone flooring over 20mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints finished flush. Red sand stone. (CH-14 S.I. No. 11.28 SOR 2023-24)
35
670
23450
... More
Cast-In-Situ Cement Concrete M 20 Kerb Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete tad manually, alt complete as per Clause 408. (CH- 28 S.I. No. 17 SOR 2023-24)
15
409
6135
... More
Supply of Sweeper (Part Time) for Cleaning purpose. (Chap-2 Item-25b SOR 2023-24)
50
350
17500
... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the Engineer-in-Charge. (CH-4 Item No. 253(a) SOR 2023-24)
10
140
1400
... More
Cartage of surplus earth, up to 5.00 km distance including labour, Loading and unloading etc. complete for proper completion of work.
10
183
1835
... More
Construction of granual sub base (GSB) by providing, laying, spreading and compacting specified graded crushed stone in sub base course including premixing the material at OMC in mechanical mixer (pug mill) including carriage of mixed material, laying in uniform layers with motor graded on a prepared surface and compacting with power roller to achieve the desired density including all material, labour, machinery, lighting guarding barricading and maintenance of diversion complete of as per MORT&HT technical specification clause no -401. ( grading 53mm-9.50mm 50%, 9.50mm-2.36mm 20%, 2.36mm and below 30%)
5
2737
13685
... More
Laying of I shaped precast Interlocking tiles of thickness 60 to 100mm (Compressive strength not less then 30Mpa and weight 4.50kg) Including 25mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work. Including VAT (CH-20 Item No. 17 SOR 2023-24) 80 mm (Rubber molded Grey) 80 mm (Rubber molded Coloured)
50
910
45500
... More
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade : New work (Two or more coats) over and including water thinnable priming coat with cement primer including cost of all materials, labour, T&P etc. requried for proper completion work. (CH-15 Item No. 2 SOR 2023-24)
15500
100
1550000
... More
S/F of Chamber / Manhole Cover as per site requirement (L.S)
3
3500
10500
... More
Providing and applying plaster of paris putty of 2mm thickness over plastered surface to prepare the surface even and smooth complete including curing the cost of all materials, labour, T & P etc complete. (CH-15 S.I. No. 13.26 SOR-2022-23)
650
130
84500
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements