Agra Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Agra Development Authority - ADA Tender
Eprocure
Opening Date16 Oct 2020
Closing Date22 Oct 2020
Tender Amount₹ 76,09,000
Costs
EMD
₹ 1,52,200Document Cost
₹ 2,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_ADAA_521360_2Bid Award Id
ViewTender No
20/2020-21 dt.-15.10.2020Tender Authority
Agra Development Authority ViewPurchaser Address
-Website
http://http://www.adaagra.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying Tack Coat with VG-10 bitumen using pressure distrubutor @0.30 kg./m2 on prepared bituminous surface, clearing of road surface machanical broom including cost of bitumen T&P labour & all taxes complete as per MORT&H specification No.
13690
-
9.2
... More
Providing and laying Bitumious Macadam with 60-90 TPH Batch type hot mix plant producing an average out put of 25 TPH, Ussing Crushed stone aggregates of specifide grading as given below, Primixed with Bituminous Binder @ 3.3% of mix and filler, Transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignmemt, rolling with smooth wheeled vibratory and tandem roller to achieve desired compaction as per MORTH specification clause No. 501.6 and 501.7 complete in all respect. 50mm to 80 mm thick using VG-30 Bitumen. (25-10mm@40%, 10-5mm@40%, 5mm & Below 20%)
1020
-
2806
... More
Providing and laying Semi Dense Bituminous Concrete with 60-90 TPH Batch type hot mix plant producing an average out put of 75 TPH, Ussing Crushed stone aggregates of specifide grading as given below, Primixed with Bituminous Binder @ 4.5% of mix and filler, Transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignmemt, rolling with smooth wheeled vibratory and tandem roller to achieve desired compaction as per MORTH specification clause No. 508 complete in all respect. 25 mm thick using VG-30 Bitumen. (with 9.50-4.70mm@57%, 4.75mm & Below 41% and 2% filler)
532
-
3099
... More
Brick edging on both side of the road of M-150 bricks 8cm. (3") wide and 12cm (4½") deep laid with mud mortar including all labour and supply of brick finished to required template & ramming the excavated earth as directed by the Engineer-In-Charge. (CH-20 S.I. No. 765 SOR 2019-20)
2.5
-
75000
... More
Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as per directed by the Engineer-in-charge up to a distance of 30 M from the foundation trenches.(S.I.No.251) SOR-2019-20 (Rate includes royalty of earth)
31
-
135
... More
Providing and laying cement concrete in 1:5:10 ( 1 cement : 5 fine sand : 10 graded stone aggregate 40mm nominal size) and curing complete, including cost of iron work in foundation and floors completion of the work as per direction of E/I. (DSR S.I. No. 4.1.10 SOR-2019-20)
5
-
5000
... More
Class-150 brick work in 1:4 Cement and Coarse sand of 2.25 fineness modulous mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work as per direction of E / I.(DSR S.I. No. 6.1.1 SOR-2019-20)
120
-
5100
... More
Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I. (DSR S.I. No. 4.1.3 SOR-2019-20)
25
-
6400
... More
12mm Thick cement plaster in single coat on fair side of single or half brick wall for interior plastering upto floor two level including internal rounded angles not exceeding 80mm in girth, chamfers and finished even and smooth. (DSR S.I. No. 13.4.1. SOR-2019-20)
(a) 1 cement : 4 coarse sand
516
-
175
... More
R.C.C Work providing and laying in position specified grade of reinforced cement concrete, slab including the cost of centering, shuttering, finishing and excluding reinforcement - Above plinth level upto fifth floor lable : (1 cement : 1.5 coarse sand : 3 graded stone) (DSR S.I. No. 5.1.2. SOR-2019-20)
7
-
8450
... More
Reinforcement of Reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and including the supply of steel and its waistage Bend, hooks, Binding wire and authorized over lapping shall be measured upto floor two level. (2) 10mm to 12mm tor (TMT Bars) Fe-415 (Analysis rate SOR-2017-18)
7
-
6200
... More
Supply of Sweeper for sweeping & cleaning of road, drain, park, open space etc including T&P complete as per direction of E/I. Full time (SOR 2019-20)
150
-
350
... More
Disposal /Cartage of surplus earth at a distance of 1.00 km.(SOR-2019-20)
412
-
100.7
... More
Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet).(CH-17 S.I. No. 694 SOR 2019-20)
7
-
1000
... More
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). (CH-17 S.I. No. 692 SOR 2019-20)
4
-
475
... More
Deduction of Cost Brick. (chapter No.01 IS. No.2(c)) thosand
0.55
-
-5700
... More
Deduction of Cost Bats. (chapter No.01 IS. No.2(c))
2.8
-
-850
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements