Agra Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Agra Development Authority - ADA Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date21 Jun 2023
Closing Date27 Jun 2023
Tender AmountRefer Documents
Costs
EMD
₹ 5,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_ADAA_814369_2Bid Award Id
ViewTender No
49/D/P.(m)/2023-24Tender Authority
Agra Development Authority ViewPurchaser Address
-Website
http://http://www.adaagra.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Class-150 (Non Modular) brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. (CH-6 S.I. No. 2 SOR-2022-23)
27.06
151536
5600
... More
12mm Thick cement plaster in single coat on fair side of single or half brick wall for interior plastering upto floor two level including internal rounded angles not exceeding 80mm in girth, chamfers and finished even and smooth. (CH-13 S.I. No. 13.4.1. SOR-2022-23) (I) 1 cement : 4 Coarse sand
136.13
25864
190
... More
Providing and applying plaster of paris putty of 2mm thickness over plastered surface to prepare the surface even and smooth complete including curing the cost of all materials, labour, T & P etc complete. (CH-15 S.I. No. 13.26 SOR-2022-23)
136.13
17696
130
... More
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) supply oa all labour material and T&P required for proper completion of work. (CH-15 S.I. No. 13.46 SOR-2022-23)
136.13
19058
140
... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (CH-10 Item No. 11 SOR 2022-23) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
73.52
8087
110
... More
Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including cost of all materials, labour, T&P etc. required for proper completion work. (CH-15 S.I. No. 1 SOR 2022-23)
3.12
106
34
... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work including cost of all materials, labour, T&P etc. required for proper completion work. (CH-15 S.I. No. 3 SOR 2022-23)
3.12
249
80
... More
Providing barbed iron wire fencing including fixing it to post after stretching it including labour and tools and plants etc. required for proper completion of the work also including supply of wires and excluding supply of posts. (CH-10 S.I. No. 5.13 SOR 2019-20) Anaysis Rate
180
1980
11