Agra Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Agra Development Authority - ADA Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date8 Aug 2024
Closing Date21 Aug 2024
Tender Amount₹ 76,31,000 
Notes
Download

Costs

Summary

Construction Work Of Shed Etc For Golf Court Charging Station In Gulistan Parking

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as per directed by the Engineer-in-charge up to a distance of 30 M from the foundation trenches.(CH-4 Item No. 1 SOR-2023-24)

186

27900

150

... More
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. (CH-5 Item No. 2 SOR 2023-24)

20

112500

5625

... More
Reinforcement of Reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and including the supply of steel and its waistage Bend, hooks, Binding wire and authorized over lapping shall be measured upto floor two level. (S.I. No. 504 SOR 2023-24) 10mm to 12mm tor (TMT Bars) Fe-415

25

210625

8425

... More
Reinforced cement concrete work in walls (any thickness), including attachedpilasters, buttresses, plinth and string courses, fillets, columns, pillars, plers, abutments, posts and struts etc, including cost of centering, shuttering, finishing and excluding reinforced :- 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). (CH-5 S.I. No. 12 SOR 2023-24) i) upto plinth level

30

250500

8350

... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (CH-10 Item No. 17 SOR 2023-24) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works

28800

3168000

110

... More
Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. (CH-11 Item no. 3 SOR 2023-24) 1.00 mm thick with zinc coating not less than 275 gm/m²

1600

1616000

1010

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work including cost of all materials, labour, T&P etc. required for proper completion work. (CH-15 S.I. No. 3 SOR 2023-24)

763

61040

80

... More
Providing and fixing PVC pipe conforming to IS make working pressure 6 Kg/SqCm incuding testing labour T&P and all complete fittings (CH-23 S.I. No. 32 SOR 2023-24) 110 mm diameter

28

12600

450

... More
Class-150 (Non Modular) brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. (CH-6 S.I. No. 2 SOR-2023-24)

55

310750

5650

... More
12mm Thick cement plaster in single coat on fair side of single or half brick wall for interior plastering upto floor two level including internal rounded angles not exceeding 80mm in girth, chamfers and finished even and smooth. (CH-13 S.I. No. 13.4.1. SOR-2023-24) (I) 1 cement : 4 Coarse sand

290

58000

200

... More
Providing and applying plaster of paris putty of 2mm thickness over plastered surface to prepare the surface even and smooth complete including curing the cost of all materials, labour, T & P etc complete. (CH-15 S.I. No. 13.26 SOR-2023-24)

290

37700

130

... More
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) supply oa all labour material and T&P required for proper completion of work. (CH-15 S.I. No. 13.46 SOR-2023-24)

290

40600

140

... More
Supply of Sweeper for sweeping & cleaning of road, drain, park, open space etc including T&P complete as per direction of E/I. Full time (SOR 2023-24)

10

4500

450



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.