Agra Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Agra Development Authority - ADA Tender

Works
Civil And Construction
Eprocure
Opening Date29 Aug 2018
Closing Date5 Sep 2018
Tender Amount₹ 10,21,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scrapping old white or colour wash including disposal of refuse as directed by Engineer-In-charge within a distance of 60 meters (200 feet) (S.I. No. 708 SOR 2017-18)

271

2981

11

... More
Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as per directed by the Engineer-in-charge up to a distance of 30 M from the foundation trenches.(Ch. No. 5 S.I.No.251) SOR-2017-18 (Rate includes royalty of earth)

10

1300

130

... More
Providing and laying cement concrete in 1:5:10 ( 1 cement : 5 fine sand : 10 graded stone aggregate 40mm nominal size) and curing complete, including cost of iron work in foundation and floors completion of the work as per direction of E/I. (S.I. No. 274 SOR-2017-18)

6

23400

3900

... More
Class-150 brick work in 1:4 Cement and Coarse sand of 2.25 fineness modulous mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work as per direction of E / I. (S.I No. 305) SOR 2017-18

30

141000

4700

... More
Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I. (S.I No. 279(a) (SOR 2017-18)

12

76200

6350

... More
R.C.C Work with cement approved coarse sand and 2cm. (¾") gauge approved stone ballast in the proportion 1:1½:3 in Column excluding supply of reinforcement and its bending the same with 24 BWGI binding wire and including nesessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. (SI.No-289 SOR 2017-18)

2

17400

8700

... More
R.C.C Work with cement approved coarse sand and 2cm. (¾") gauge approved stone ballast in the proportion 1:2:4 in Footing excluding supply of reinforcement and its bending the same with 24 BWGI binding wire and including nesessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. (SI.No-287, SOR 2017-18)

2

12400

6200

... More
Reinforcement of Reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and including the supply of steel and its waistage Bend, hooks, Binding wire and authorized over lapping shall be measured upto floor two level. (SI.No-504 SOR-2017-18) (A) 10mm to 32mm tor

5

29550

5910

... More
Mild steel or iron work in heavy sizes such as trusses, built up gates record rack, roof work, gates etc. brought to required form including drilling holes revitting or welding where necessary, and also including supply of steel bolts, nuts, wastage etc. and their fixing require for proper completion of the work. (SI.No-503 SOR-2017-18)

1300

76830

59.1

... More
12mm Thick cement plaster in single coat on fair side of single or half brick wall for interior plastering upto floor two level including internal rounded angles not exceeding 80mm in girth, chamfers and finished even and smooth. (NBO-17.58) (a) 1 cement : 4 coarse sand (S.I. No. 582(ii) SOR-2017-18)

1187

178050

150

... More
Finishing walls with water-proofing cement paint of approved make such as per super snowcem, Durochem, Robiacem, Guttucem, Supercem quality and of required shade on undercorated wall surfaces (Two Coat) over and including one coat white cement primer to give an even shade after throughly brusing the surface to powdered materials including curing and cost of all materials. (Sl.no-660+661/SOR 2017-18)

1640

132020

80.5

... More
Cleaning Jungles including uprooting of trunk vegetation grass, bushes, wood trees and sapling of girth upto 30cm measured at a height of 1 meter above ground level and removal of rubbish upto a distance of 50 meters out side the periphery of area cleared. (SI.No-259 SOR-2017-18)

8202

32808

4

... More
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 0.50 M in depth & earth-work in embankment to be in 20 Cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 M lift and 30 M lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 M distance as directed by the Engineer-in-charge. (S.I No. 253, SOR-2017-18) (Rate including royalty of earth)

340

49300

145

... More
Cartage of surplus earth at a distance. (SOR-2017-18) (a)3.00 km lead

340

37264

109.6

... More
Supply of excavator cum loader machine (Like JCB machine) on hire charges inclusive of diesl, operator, cleaner etc. complete. (SOR-2017-18)

15

15000

1000

... More
Supply of Beldar.

30

9300

310

... More
Decution for sale of material (a) Brick Bats

12

-10200

-850

... More
Finishing walls with Putty approved brand and manufacture and of required shade and undacorated wall surface to give even shade over including curing and cost of all material, labor, T&P etc. required for proper completion of work. (Chapter No. 15 S.I. No. 27 (New) SOR 2017-18

1187

154310

130



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.