Agra Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Agra Development Authority - ADA Tender

Works
Eprocure
Opening Date7 Mar 2019
Closing Date13 Mar 2019
Tender Amount₹ 39,68,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and applying primer coat with bitumen emulsion (S.S.) on prepared surface of granular base including clearing of road surface and spraying primer @ 0.75 kg/sqm. (S.S. Grade) using mechanical broom including all taxes complete as per MORT&H specification No. 502

375

6900

18.4

... More
Providing and applying Tack Coat with bitumen using pressure distrubutor @0.25 kg./m2 on prepared bituminous surface, clearing of road surface machanical broom including cost of bitumen T&P labour & all taxes complete as per MORT&H specification No. 503

1415

14433

10.2

... More
Providing and laying Bitumious Macadam with 60-90 TPH Batch type hot mix plant producing an average out put of 25 TPH, Ussing Crushed stone aggregates of specifide grading as given below, Primixed with Bituminous Binder @ 3.3% of mix and filler, Transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignmemt, rolling with smooth wheeled vibratory and tandem roller to achieve desired compaction as per MORTH specification clause No. 501.6 and 501.7 complete in all respect. 50mm to 80 mm thick using VG-30 Bitumen, (Grading 19mm nominal size), 25-10mm 40 Per cent, 10-5mm 40per cent, 5mm and below 20 percent)

42

115920

2760

... More
Providing and laying Semi Dense Bituminous Concrete with 60-90 TPH Batch type hot mix plant producing an average out put of 75 TPH, Ussing Crushed stone aggregates of specifide grading as given below, Primixed with Bituminous Binder @ 4.5% of mix and filler, Transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignmemt, rolling with smooth wheeled vibratory and tandem roller to achieve desired compaction as per MORTH specification clause No. 508 complete in all respect. 25 mm thick using VG-30 Bitumen. 9.5-4.75mm 57 percent, 4.75mm and below 41 percent, filler 20%

83

257300

3100

... More
P/Laying of I shaped precast 80mm thick rubber molded Interlocking tiles (Compressive strength not less then 30Mpa and weight 4.50kg) Including 25mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work. Including VAT (SOR 2014-15 Chap-20 item-19)

130

114400

880

... More
PART-B (Drain Work) :- Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. (Rate including Royalty of earth also) (PWD SI.No-251)

151

19630

130

... More
Disposal of excavated earth Including Loading and unloading but excluding on Pacca road. 3 Km.Lead

121

13348

110.32

... More
Providing and laying cement concrete in 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ I. (S.I No. 274)

17

66300

3900

... More
M-150 brick in 1:4 Cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work as per direction of E / I. (S.I No. 305)

81

380700

4700

... More
12 mm thick cement plaster in 1:4 cement and coarse sand single coat of fair side of single of half brick wall for interior plastering upto floor two level including internal rounded angles chamfers and rounded angles not exceeding 80mm in girth and finished even and smooth no extra for mixing any additive (SI.No-582ii)

172

25800

150

... More
Providing and laying cement concrete in 1:1.5:3 (1 cement : 1.5 Coarse sand : 3 stone grit 20 mm nominal size) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ I. (S.I No. 284a-284+279a)

5

33555

6711

... More
R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion 1:1 ½ :3 in slab excluding supply of reinforcement and its bending but including its fixing and binding of the same with 24 BWGI binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labours, T & P etc. required for proper completion of the work. (S.I No. 284)

2

16700

8350

... More
Reinforcement of reinforced concrete or reinforced brick work (when not included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage, bend, hooks and authorised overlapping shall be measured upto floor two level. All compete as per direction of E/I. (S.I No. 504). 10-12mm TMT Bars

2.5

15795

6318

... More
PART-C (Boundary Wall) :- Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. (Rate including Royalty of earth also) (PWD SI.No-251)

33

4290

130

... More
Providing and laying cement concrete in 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ I. (S.I No. 274)

7

27300

3900

... More
M-150 brick in 1:4 Cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work as per direction of E / I. (S.I No. 305)

32.5

152750

4700

... More
Same as item-3 but for Super Structure above Plinth Level upto floor Five Level (upto Five stories) including necessary cutting and moulding of brick work as required and also including honey combed brick work in thickness of wall more than 12 cm. (305+309)

70

354200

5060

... More
Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone grit (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I. (S.I No. 279a)

4.5

28575

6350

... More
12 mm thick cement plaster in 1:4 cement and coarse sand single coat of fair side of single of half brick wall for interior plastering upto floor two level including internal rounded angles chamfers and rounded angles not exceeding 80mm in girth and finished even and smooth no extra for mixing any additive (SI.No-582ii)

775

116250

150

... More
Finishing wall with water proofing cement paint (two coat) of approved make such as super snowcem durocem guttucem supercem Quality & of required shade on undecoreted wall surface (Two Coat) over & including one coat white cement primer to give an even shade after throughly brushing the surface to powdered materialels including curing and cost of material. (SI.No-660+661)

825

66412

80.5

... More
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 0.50 M in depth & earth-work in embankment to be in 20 Cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 M lift and 30 M lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 M distance as directed by the Engineer-in-charge. (As Per P.W.D.S.I No. 253).

205

29725

145

... More
Construction of granual sub base by providing coarse graded material, spreading in uniform layers with moter grader surface mixing by mix in place method with rotavator at OMC & compacting with vibratory power roller to achieve the desired density, complete as per clause Table 400-2 S.N. 4.2(c) MORT& H specification no. 401

97

254140

2620

... More
P/Laying of I shaped precast 80mm thick rubber molded Interlocking tiles providings (Compressive strength not less then 30Mpa and weight 4.50kg) Including 25mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work. Including VAT (SOR 2014-15 Chap-20 item-19)

805

708400

880

... More
Mild Steel or iron work in heavy sizes such as trusses, built up gates, record racks. Roof work, gates, etc. wrought to required from including drilling holes rivetting or welding where necessary, and also including supply of steel, bolts, nuts, wastage etc. and their fixing required for proper completion of the work (SI. No-503)

2360

149104

63.18

... More
Painting two coat over priming coat (but excluding cost of priming coat) on steel and other metal surfaces upto 10cm width or girth or small articles not exceeding 0.10 Sq.M. in area with superior synthetic enamel such as Luxol 3, Hi gloss Apcolite, Superlac, Dulux specified brushing to give and even shade and including the cleaning the surface of all dirt, dust and other foreign matter sand papering and scrapping including cost of all materials, labour, tools and plants etc. required for proper completion of work. (SOR 14-15 Item 1a+2a+642)

100

9150

91.5

... More
R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone grit in the proportion 1:1 ½ :3 in Raft foundation and footing excluding supply of reinforcement and its bending but including its fixing and binding of the same with 24 BWGI binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labours, T & P etc. required for proper completion of the work. (S.I No. 287)

0.9

6705

7450

... More
As in item 287 above but in R.C.C. Column in 1:1.5:3 (SI.No-289)

0.26

2262

8700

... More
Reinforcement of reinforced concrete or reinforced brick work (when not included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage, bend, hooks and authorised overlapping shall be measured upto floor two level. All compete as per direction of E/I. (S.I No. 504). 10-12mm dia TMT bars

1.5

9477

6318

... More
PART-D (Rain Water Harvesting) :- Transportation of drilling equipment and other accessories to site of work etc all complete.

1

4800

4800

... More
Drilling of tube well by R.C. Method etc all complete ( 250 mm dia)

70

40598

579.98

... More
Lower & Fixing of PVC pipe 6 kg/cm2 including socket etc all complete as follows. Slotted pipe 160 mm dia (PSR in JNNURM/Shastripuram)

13

4104

315.74

... More
Blind pipe 160 mm dia (PSR in JNNURM/Shastripuram)

61

17509

287.04

... More
Supplying & Lowering sorrounding of pipe pee gravel size 5-10 mm size screening of gavel etc all complete.

1

2064

2064

... More
Water arrengement charge for drilling etc all complete.

2

960

480

... More
Excavation in foundation in ordinary soil ( Loam, Clay or sand) including, lift : Upto 1.50 M and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as per directed by Engineer-in-charge up to a distance of 30 M from the foundation trenches. ( S.I. No 251)

116

15080

130

... More
Lift up 1.5 to 3.0 mt.

9

1305

145

... More
Providing and laying cement concrete in 1:6:12 ( 1 cement :6 fine sand : 12 graded brick aggregate 40 mm nominal size ) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/I. ( S.I. No-275)

3

11100

3700

... More
M-100 brick work in foundation 1:4 cement and c.sand 2.25 FM etc all complete (SOR-2017/S.I. No-305)

17

79900

4700

... More
12 mm thick cement plaster in 1:4 cement and coarse sand single coat of fair side of single of half brick wall for interior plastering upto floor two level including internal rounded angles chamfers and rounded angles not exceeding 80mm in girth and finished even and smooth no extra for mixing any additive (SI.No-582ii)

110

16500

150

... More
Supply and laying 40 mm brick ballast etc all complete.

2

1632

816

... More
Supply and laying coarse sand approved quality

2

2304

1152

... More
S/F 110 mm dia PVC pipe 6 kg/cm2.

92

31353

340.8

... More
S/F PVC fittings as follows (i) PVC Elbow ( 110 mm dia) heavy duty

22

1372

62.4

... More
(ii) PVC Socket ( 110 mm dia) heavy duty

18

518

28.8

... More
Supply of PVC Sollution

1

336

336

... More
RCC work with cement approved coars sand and 2 cm.(3/4") gauge approved stone grit in the proportion 1:1 1/2:3 in lintal of doors and windows excluding supply of reinforcement and its bending the same with 24 BWGI binding wire and including nesessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. strength of the concrete shall be not less than M-150- ( SI. No-283)

1

7750

7750

... More
RCC work with cement approved coars sand and 2 cm.(3/4") gauge approved stone grit in the proportion 1:1 1/2:3 in Slab excluding supply of reinforcement and its bending the same with 24 BWGI binding wire and including nesessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. required for proper completion of the work. strength of the concrete shall be not less than M-200- ( SI. No-284)

5

41750

8350

... More
Reinforcement reinforced concrete or reinforced brick work ( when not included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage, bend, hooks and authorised overlapping shall be measured upto floor two level ( SI. No-504) (upto 12 mm dia)

2

12636

6318

... More
Mild steel or iron work in heavy size such as trusses, built up gates record rack, roof work gates etc. brought to required form including drilling holes riveting or welding where necessary and also including supply of steel bolts, nuts wastage etc and their fixing required for proper completion of the work.

50

3159

63.18

... More
P/Laying of Nylon plastic jali heavy quality etc all complete. PSR

32

1996

62.4

... More
Providing and laying flate bricks in floor in dry joints etc all complete. ( SI. No. 762(a)/2017-18)

15

4875

325

... More
Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone grit (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors - completion of the work as per dirction of the E/I. ( S.I. No 279)

2

12700

6350



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.