Urban Development Department Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.

Urban Development Department - UDD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date16 Dec 2023
Closing Date16 Jan 2024
Tender Amount₹ 19,88,749 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade excluding the cost of Centaring & Shuttering- All works upto plinth level 1:4:8 (1 cement : 4 fine Sand : 8 graded well burnt brick aggregate 40 mm nominal size)

23.05

180815

7844.8

... More
First class brick work in foundation and plinth including cost of all materials as required complete In cement morter 1:6 ( 1Cement : 6 fine sand)

10.55

90964

8624.1

... More
First class Brick work in superstructure above plinth level & upto floor five level including cost of all materials as required complete. In cement mortar 1:6 (1 cement : 6 fine sand)

4.28

42150

9859.7

... More
Half brick work with first class bricks in superstructure upto floor five level including cost of all materials as required complete In cement morter 1:5 (1Cement : 5 fine sand) For Main Wall Deduction for Window Deduction for pillar

114.33

153945

1346.5

... More
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering,shuttering,finishing and reinforcement.--All works upto plinth level 1:2:4 (1 cement : 2 fine sand: 4 graded well burnt brick aggregate 20 mm nominal Size) For Column Base For Column Haunch

9.01

86556

9607.7

... More
Reinforced cement concrete work in walls(any thickness), including attached pilasters, buttressess, plinth and skirting courses, fillets, columns, pillars,piers, abutments,posts and struts etc upto floor five level excluding the cost of cenetering, shuttering, finishing & reinforcement 1:2:4 (1 cement : 2 fine sand: 4 graded well burnt brick aggregate 20 mm nominal Size)

5.6

50637

9039.5

... More
RCC work in beams, suspended floor, roofs having slope upto 15 degree landings, balconies, shelves, chajjas, lintels,bands,plain window sills,staircases and spiral stair cases excluding spiral staircases excluding precast spiral staircase. 1:2:4 (1 cement:2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size)

39.36

422677

10737.8

... More
Centering shuttering including strutting,propping etc and removal of form work for: Foundations,footings,bases,for columns etc for mass concrete with timber plank

78.54

21119

268.9

... More
Lintels, beams,plinth beams,girders,bressumers and cantilivers with shuttering ply

295.99

114015

385.2

... More
Reinforcement for RCC works including straightening, cutting, bending, placing in position & binding all complete upto floor five level, Thermo-Mechanically Treated bars/Cold Twisted deformed steel bars As per item no 8,9,10 Total Quantity of RCC work = 53.974 Cum @ 120kg/Cum

6476.9

506494

78.2

... More
12 mm cement plaster in single layer including cost of materials required and finishing even and smooth and curing complete. In cement morter 1:5 ( 1 Cement : 5 fine sand)

412.95

68797

166.6

... More
Supplying & fixing rolling shutters of approved make,made of required size M.S laths interlocked together through their entier length and jointed together at the end by end locks mounted on specially designed pipe shaft with brackets,side guides and arrangements for inside and out side lockinf with push and pull operation complete including the cost of providing and fixing necessary 275mm long wire springs grade no.2 and M.S handles,hols fast including embedding in cement concrete of required grade required for fixing in position all necessary fittings,including applying of approved steel primer etc complete as required.

36.75

107468

2924.3

... More
Providing structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as required

79.92

6577

82.3

... More
Applying one coat of water thinable cement primer of approved brand and manufacturer on wall surface complete. Water thinable cement primer (Interior Wall)

228.9

8584

37.5

... More
Finishing wall with water proffing cement paint of required shade of approved brand & manufacture New work (two or more coat applied @ 3.84 kg/10 sqm) complete. (Exterior Wall)

469.5

28874

61.5

... More
With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel works

73.5

2330

31.7

... More
Neat Cement Punning (Main Room) Vearndah Floor) Stair

109.25

4927

45.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.