Tripura Urban Planning And Development Authority Tender

... More
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.

Tripura Urban Planning And Development Authority Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date7 Mar 2024
Closing Date14 May 2024
Tender Amount₹ 72,21,74,193 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, lowering, laying in trenches, aligning, fixing in position and jointing socketed rubber gasket type ISI marked uPVC pipes of Class III (6 Kg/sqcm) with rubber ring joints (as per IS 4985-2000) of following outer dia with all accessories (excluding specials) complete including all material, labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. Note : E/w to be measured and paid separately.

-

-

-

... More
In 1:3 cement mortar

877

-

-

... More
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MoRD technical specification Clause 1903.

1185

-

-

... More
Case - I : Using Concrete Mixer

2061

-

-

... More
By Manual Means

-

-

-

... More
110 mm dia

55

-

-

... More
Both Side Weep Hole 110 Dia UPVC @ 5M C/C

200

-

-

... More
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead with all lifts but excluding compaction ground supporting embankment/ subgrade, replacement by suitable soil, which shall be paid separately as per MoRT&H Technical Specification clauses of section 300.

450

-

-

... More
(B)Granular Road

9

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
(ii) For Grading II Material

374

-

-

... More
Dismantling brick / tile work

-

-

-

... More
Compacting Original Ground

-

-

-

... More
Road Restoration Works

-

-

-

... More
502 Prime Coat (iii) High porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.20- 1.50 kg/sqm using mechanical means as per MoRD Technical Specification Clause 502.

4128

-

-

... More
Earth filling (For marshy soil)

1782

-

-

... More
Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per MoRD Technical Specification Clause 202. Dismantling of existing Steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
( II ) By Mechanical Means

-

-

-

... More
(i) with 900 mm equilateral triangle

2

-

-

... More
Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

47

-

-

... More
Dharmanagar Town-Storm Water Drain Works

-

-

-

... More
(A)Bituminous Courses

114

-

-

... More
By Manual Means

-

-

-

... More
(i) Compacting original ground supporting subgrade

-

-

-

... More
(A)Bituminous Road

24

-

-

... More
A) Lime Concrete

15

-

-

... More
Girth Above 900 mm to 1800 mm

2

-

-

... More
( I ) By Manual Means

-

-

-

... More
In 1:3 cement mortar

25

-

-

... More
Fixing red danger tape on bamboo poles in two rows on both sides of trench. (Payment to be made per running metre of trench. Rates quoted shall envisage re-use of items as far as practicable.).(Rate worked out considering 2 times usage for tape and 15 times usage for balli)

1243

-

-

... More
U-PVC coupler for UPVC drainage pipes 110/160 mm Dia

68

-

-

... More
Making up loss of material/ irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MoRD technical specification Clause 1903.

1185

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Section Wise

203

-

-

... More
Wet Mix Macadam

-

-

-

... More
Statutory payments to water resources, National Highways, State Highways, Indian Railways, Forest Department, Archeological Survey of India and similar organizations, Provision towards costs associated with social safeguards, Provision towards costs associated with environmental safeguards, Network expansions if required beyond the present scope,Nalla crossings, any dismantling work, shifting of utilities and miscellaneous works

1

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Length Wise

4738

-

-

... More
RCC M 30 Grade

-

-

-

... More
C)Reinforced Cement Concrete

80

-

-

... More
(v) with 600 x 450 mm rectangular

4

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Section Wise

318

-

-

... More
Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

165

-

-

... More
One Side Weep Hole 110 Dia UPVC @ 5M C/C

224

-

-

... More
Maintenance of Earthen shoulder (Stripping of excess soil)

-

-

-

... More
503 Tack Coat (iv) Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per MoRD Technical Specification Clause 503.

994

-

-

... More
Upto 5 m height

-

-

-

... More
Providing and anchoring polypropylene coated MS foot rests (weighing approximately 0.9 kg) for chamber/pit/sump/ walls etc. at levels and intervals as directed by engineer.

44

-

-

... More
Trench barricading for safety as per drawing and specification wherever directed by the Engineer. (Payment to be made as per running metre of trench) (Rates quoted shall envisage re-use of items as far as practicable).(Rate worked out considering 15 times usage)

1243

-

-

... More
1000 mm x 1100 mm

1

-

-

... More
In area of non-thorny jungle

0.13

-

-

... More
(A) In area of light jungle

1.01

-

-

... More
(vi) with 600 x 600 mm square

2

-

-

... More
Road Restoration Works

-

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
Fixing red danger tape on exposed & jutting out shoring in 2 rows on both sides of trench. (Payment to be made per running metre of trench. Rates quoted shall envisage re-use of items as far as practicable.).(Rate worked out considering 2 times usage for tape)

1290

-

-

... More
Dismantling brick / tile work

-

-

-

... More
Removal of Telephone / Electric Poles and Lines

-

-

-

... More
Turfing with Sods

-

-

-

... More
PCC M 15 Grade ( upto 5 m height )

285

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Technical Specification clause 201.

-

-

-

... More
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MoRD technical specification Clause 1903.

621

-

-

... More
Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in substructure complete as per drawings & MoRT&H technical specification Clauses 1600, 2200.

367.71

-

-

... More
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H Technical Specification Clause 406.

296

-

-

... More
In cement mortar.

120

-

-

... More
80 mm thick factory made c.c. interlocking paver block of M-40 Grade

-

-

-

... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

2145

-

-

... More
Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 580 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawings & MoRT&H technical specifications Clauses 408.

-

-

-

... More
A. Using Concrete Mixer

1243

-

-

... More
Case - I : Using Concrete Mixer

-

-

-

... More
Upto 600 mm dia Hume pipe

77

-

-

... More
U-PVC coupler for UPVC drainage pipes 110/160 mm Dia

152

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
Providing, Laying, Jointing & field testing of high density Polyethyline pipes, (HDPE) conforming to IS 4984/14151/12786/13488 with necessary jointing material like mexchanical connector or jointing pipes heating to the ends of pipes with the help of telfon coated electric mirror/ heater to the required temprature and pressing the ends together against the each other, to form a manolithic & leak proof joint by thermosetting prosses. It may be required to be done with Jacks/Hydraulic Jacks/ but fusion machine. (50 mm and above fusion jointed & below 50 mm mechanical jointed) incl. hydraulic testing

-

-

-

... More
508 20 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/ modified bitumen) Binder. Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508. Case - I : By Manual Means (I) Bitumen of VG-30

994

-

-

... More
I) Upto 3.0 m Depth

18930

-

-

... More
Dismantling of Brick soling Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and upto a lead of 500 m by manual means as per MoRD Technical Specification Clause 202.

89

-

-

... More
Girth Above 600 mm to 900 mm

1

-

-

... More
A. Using Concrete Mixer

2876

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H Technical Specification Clause 406.

1344

-

-

... More
I. Ordinary Soil

-

-

-

... More
Case - I : Using Concrete Mixer

2730

-

-

... More
(A)Bituminous Road

57

-

-

... More
1400 mm x 1100 mm

1

-

-

... More
I) Upto 3.0 m Depth

10323

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, dewatering, construction of shoring, shuttering & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MoRD technical specification Clause 1903.

2580

-

-

... More
RCPC Grating 12 Ton Load Capacity

-

-

-

... More
A) Lime Concrete

10

-

-

... More
In 1:3 cement mortar

6521

-

-

... More
B)Cement Concrete

215

-

-

... More
Removal of telephone/ electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

46

-

-

... More
Including dismembering

695

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Length Wise

3181

-

-

... More
Providing, Laying, Jointing & field testing of high density Polyethyline pipes, (HDPE) conforming to IS 4984/14151/12786/13488 with necessary jointing material like mexchanical connector or jointing pipes heating to the ends of pipes with the help of telfon coated electric mirror/ heater to the required temprature and pressing the ends together against the each other, to form a manolithic & leak proof joint by thermosetting prosses. It may be required to be done with Jacks/Hydraulic Jacks/ but fusion machine. (50 mm and above fusion jointed & below 50 mm mechanical jointed) incl. hydraulic testing

-

-

-

... More
Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in substructure complete as per drawings & MoRT&H technical specification Clauses 1600, 2200.

200.03

-

-

... More
Dismantling of CI water pipe line 600 mm dia including disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately under supervision of the concerned department but excluding earth excavation and dismantling of masonry works as per MoRD Technical Specification Clause 202.

260

-

-

... More
(ii) For Grading II Material

698

-

-

... More
Providing, lowering, laying in trenches, aligning, fixing in position and jointing socketed rubber gasket type ISI marked uPVC pipes of Class III (6 Kg/sqcm) with rubber ring joints (as per IS 4985-2000) of following outer dia with all accessories (excluding specials) complete including all material, labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. Note : E/w to be measured and paid separately.

-

-

-

... More
In 1:3 cement mortar

420

-

-

... More
Neat cement punning.

2160

-

-

... More
Single bamboo palasiding/walling of whole 2nd class bamboo (Jati or Bethua) 65 to 75 mm dia and closely packed & driven @ 150 mm c/c including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing bitumen drum sheet walling fixed with nails as per drawing and MoRD technical specification Clause 1302.5.

-

-

-

... More
Scarifying Existing bituminous Road Surface by mechanical means to a Depth of 150 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per MoRD Technical Specification Clause 301.4.

7295

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
80 mm thick factory made c.c. interlocking paver block of M-40 Grade

-

-

-

... More
Statutory payments to water resources, National Highways, State Highways, Indian Railways, Forest Department, Archeological Survey of India and similar organizations, Provision towards costs associated with social safeguards, Provision towards costs associated with environmental safeguards, Network expansions if required beyond the present scope,Nalla crossings, any dismantling work, shifting of utilities and miscellaneous works

1

-

-

... More
Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete : (DSR 2021, VOL - II, Page No- 470)

-

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
Construction of Embankment with Material Obtained from Borrow Pits

-

-

-

... More
(I) By Manual Means

-

-

-

... More
Cutting of Trees, including cutting of Trunks, Branches and removal of Stumps

-

-

-

... More
Brick masonry work in cement mortar in sub-structure complete excluding pointing & plastering, as per drawing & MoRT&H technical specification Clauses 1300, 2200.

-

-

-

... More
Pipe Laying And Others

-

-

-

... More
Removal of Telephone / Electric Poles and Lines

-

-

-

... More
For Drain

144

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of high intensity grade shetting vide MoRT&H technical specification Clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and MoRT&H Technical Specification Clause 801.

-

-

-

... More
B)Cement Concrete

150

-

-

... More
Miscellaneous Works

-

-

-

... More
Above 600 mm to 900 mm dia Hume pipe

30

-

-

... More
Providing and laying factory made chamfered edge Cement Concrete paver blocks of required strength, thickness & size/ shape, made by table vibratory method to attain superior smooth finish using PU or equivalent moulds, laid in required grey colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with fine sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic parking etc. all complete as per specifications & approval/ direction of the Engineer -in-Charge:

-

-

-

... More
(A) In area of light jungle

1

-

-

... More
Supplying, fixing and installation of HDPE fabricated wall mounted Flap Gates of approved manufacturer, complete with anchor bolts and all other accessories complete as per specifications, drawings and direction of Engineer-In-Charge.

-

-

-

... More
B)Cement Concrete

5

-

-

... More
In cement mortar.

130

-

-

... More
I. Ordinary Soil

-

-

-

... More
Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering as per MoRD Technical Specification Clause 412.

8185

-

-

... More
In cement mortar.

150

-

-

... More
Dismantling of Fencing Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, backfilling of pit by manual means including disposal of dismantled material with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

14

-

-

... More
Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A- 9/261) HP/ Hr. 77.00 13 (i) The

3500

-

-

... More
Making up loss of material/ irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MoRD technical specification Clause 1903.

2580

-

-

... More
503 Tack Coat (iv) Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per MoRD Technical Specification Clause 503.

2369

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
Brick masonry work in cement mortar in sub-structure complete excluding pointing & plastering, as per drawing & MoRT&H technical specification Clauses 1300, 2200.

-

-

-

... More
Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A- 9/261) HP/ Hr. 77.00 13 (i) The

1800

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of high intensity grade shetting vide MoRT&H technical specification Clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and MoRT&H Technical Specification Clause 801.

-

-

-

... More
Cast in Situ Cement Concrete M 20 Kerb. Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawings & MoRT&H technical specifications Clauses 408.

-

-

-

... More
Girth Above 900 mm to 1800 mm

2

-

-

... More
Sand Filling

224

-

-

... More
Demolishing brick work like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRT&H Technical Specification Clause 202.

-

-

-

... More
PCC M 15 Grade ( upto 5 m height )

805

-

-

... More
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.

-

-

-

... More
(i) with 900 mm equilateral triangle

20

-

-

... More
Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in substructure complete as per drawings & MoRT&H technical specification Clauses 1600, 2200.

446.25

-

-

... More
In cement mortar.

130

-

-

... More
Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H Technical Specification Clause 401

-

-

-

... More
Direction and Place Identification Signs upto 0.9 sqm Size Board.

-

-

-

... More
1250 mm x 1250 mm

1

-

-

... More
1200 mm x 1100 mm

1

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H Technical Specification Clause 401. (iii) For Grading II Material

199

-

-

... More
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.

-

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Section Wise

10

-

-

... More
Excavation in soil by manual means

-

-

-

... More
110 mm dia

27

-

-

... More
Dismantling of flexible pavement and disposal of dismantled material up to a lead of 1000 meters, staking serviceable and unserviceable materials separately and as per leavent clauses of section-200.

-

-

-

... More
Sand Filling

513

-

-

... More
For Drain

83

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1)

-

-

-

... More
110 mm dia

108

-

-

... More
80 mm thick factory made c.c. interlocking paver block of M-40 Grade

-

-

-

... More
Dismantling of CI water pipe line 600 mm dia including disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately under supervision of the concerned department but excluding earth excavation and dismantling of masonry works as per MoRD Technical Specification Clause 202.

285

-

-

... More
Statutory payments to water resources, National Highways, State Highways, Indian Railways, Forest Department, Archeological Survey of India and similar organizations, Provision towards costs associated with social safeguards, Provision towards costs associated with environmental safeguards, Network expansions if required beyond the present scope,Nalla crossings, any dismantling work, shifting of utilities and miscellaneous works

1

-

-

... More
Dismantling brick / tile work

-

-

-

... More
Providing and fixing MS angle ( 50 x 50 x 5 mm) to act as nosing with lugs of MS flat 10 x 5 mm, 100 mm long forked at end 60 cm apart ( minimum three lugs to be provided ) including necessary welding and applying a priming coat of approved primer on exposed surface etc. complete.

1588

-

-

... More
RCC M 30 Grade

-

-

-

... More
(ii) with 600 mm equilateral triangle

72

-

-

... More
(I) By Manual Means

-

-

-

... More
Neat cement punning.

332

-

-

... More
Drain Raft 150 Thick

189.37

-

-

... More
Catch Pit Wall 150 thick

30

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5.

8370

-

-

... More
Direction and Place Identification Signs upto 0.9 sqm Size Board.

-

-

-

... More
(iii) with 600 mm circular

4

-

-

... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

674

-

-

... More
Dismantling of flexible pavement and disposal of dismantled material up to a lead of 1000 meters, staking serviceable and unserviceable materials separately and as per leavent clauses of section-200.

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRT&H Technical Specification clause 201.

-

-

-

... More
a) 80 mm thick c.c. paver block of M-40 grade with approved colour, design and pattern.

6975

-

-

... More
All kinds of soils.

3975

-

-

... More
Providing and anchoring polypropylene coated MS foot rests (weighing approximately 0.9 kg) for chamber/pit/sump/ walls etc. at levels and intervals as directed by engineer.

32

-

-

... More
Dismantling of Cement Concrete Pavements as per MoRT&H Technical Specification Clause 202 Dismantling of cement concrete pavements by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials with all lifts and upto a lead of 1000 m, stacking serviceable materials and unserviceable materials separately as per MoRT&H Technical Specification Clause 202. (B) upto partial depth of concrete

35

-

-

... More
C)Reinforced Cement Concrete

120

-

-

... More
Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in substructure complete as per drawings & MoRT&H technical specification Clauses 1600, 2200.

98.4

-

-

... More
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal up to 1000 metres.

-

-

-

... More
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead with all lifts but excluding compaction ground supporting embankment/ subgrade, replacement by suitable soil, which shall be paid separately as per MoRT&H Technical Specification clauses of section 300.

515

-

-

... More
Dismantling of CI water pipe line 600 mm dia including disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately under supervision of the concerned department but excluding earth excavation and dismantling of masonry works as per MoRD Technical Specification Clause 202.

340

-

-

... More
B)Cement Concrete

206

-

-

... More
Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete : (DSR 2021, VOL - II, Page No- 470)

-

-

-

... More
Dismantling of Brick soling Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and upto a lead of 500 m by manual means as per MoRD Technical Specification Clause 202.

10

-

-

... More
(I) By Manual Means

-

-

-

... More
Upto 5 m height

-

-

-

... More
I. Ordinary Soil

-

-

-

... More
Dismantling brick / tile work

-

-

-

... More
PCC M 15 Grade ( upto 5 m height )

247

-

-

... More
B) Driven at least 900 mm below ground and 900 mm above ground on average

458

-

-

... More
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and MoRT&H Technical Specification Clause 801.

8

-

-

... More
Topographical survey Work using Total Station, preparation and finalization of survey drawings and CADD files, preparation of working drawing including Geotechnical work as directed by the Engineer in charge.

31

-

-

... More
Plastering with cement mortar 15 mm thick on brickwork in substructure as per MoRT&H technical specification Clauses 1300 & 2200

-

-

-

... More
Excavation in soil by manual means

-

-

-

... More
Dismantling of Cement Concrete Pavements as per MoRT&H Technical Specification Clause 202 Dismantling of cement concrete pavements by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials with all lifts and upto a lead of 1000 m, stacking serviceable materials and unserviceable materials separately as per MoRT&H Technical Specification Clause 202. (B) upto partial depth of concrete

42

-

-

... More
(I) By Manual Means

-

-

-

... More
Upto 5 m height

-

-

-

... More
One Side Weep Hole 110 Dia UPVC @ 5M C/C

90

-

-

... More
Providing and fixing MS angle ( 50 x 50 x 5 mm) to act as nosing with lugs of MS flat 10 x 5 mm, 100 mm long forked at end 60 cm apart ( minimum three lugs to be provided ) including necessary welding and applying a priming coat of approved primer on exposed surface etc. complete.

1987

-

-

... More
Bituminous Concrete Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 509 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

330

-

-

... More
Proving and supplying and Fixing of RCPC Grating 12 Ton Load Capacity in Catch Pit- 600 x 600 x 600(H) all neccery civil works and equipment as per provided drawing and specefication all complete and direction of Engineer in In charge. (Including Loding Unloasding Transportation, Erection and GST )

128

-

-

... More
d) 160 mm Dia 10 kg/Sq.cm pipes

289

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Length Wise

11397

-

-

... More
I) Upto 3.0 m Depth

8631

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Single bamboo palasiding/walling of whole 2nd class bamboo (Jati or Bethua) 65 to 75 mm dia and closely packed & driven @ 150 mm c/c including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing bitumen drum sheet walling fixed with nails as per drawing and MoRD technical specification Clause 1302.5.

-

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
Providing weep holes in brick masonry/ stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe or uPVC pipe (110 mm OD of 6.0 Kg/cm2 pressure) extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MoRT&H technical specification clauses 2706, 2200.

-

-

-

... More
Safety Arrangements

-

-

-

... More
I) Upto 3.0 m Depth

25643

-

-

... More
Providing and anchoring polypropylene coated MS foot rests (weighing approximately 0.9 kg) for chamber/pit/sump/ walls etc. at levels and intervals as directed by engineer.

9

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of high intensity grade shetting vide MoRT&H technical specification Clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and MoRT&H Technical Specification Clause 801.

-

-

-

... More
Topographical survey Work using Total Station, preparation and finalization of survey drawings and CADD files, preparation of working drawing including Geotechnical work as directed by the Engineer in charge.

75

-

-

... More
Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering as per MoRD Technical Specification Clause 412.

3907

-

-

... More
Scarifying Existing bituminous Road Surface by mechanical means to a Depth of 150 mm and disposal of scarified material with all lifts and leads upto 1000 m as per MoRT&H Technical Specification clauses of section 300.

315

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
(iv) with 800 x 600 mm rectangular

2

-

-

... More
C) Reinforced Cement Concrete

15

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, dewatering, construction of shoring, shuttering & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)

2593

-

-

... More
Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 580 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawings & MoRT&H technical specifications Clauses 408.

-

-

-

... More
Removal of Telephone / Electric Poles and Lines Removal of telephone/ electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

10

-

-

... More
Including dismembering

458

-

-

... More
Statutory payments to water resources, National Highways, State Highways, Forest Department, Archeological Survey of India and similar organizations, Provision towards costs associated with social safeguards, Provision towards costs associated with environmental safeguards, Network expansions if required beyond the present scope,Nalla crossings, any dismantling work, shifting of utilities and miscellaneous works

1

-

-

... More
Providing weep holes in brick masonry/ stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe or uPVC pipe (110 mm OD of 6.0 Kg/cm2 pressure) extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MoRT&H technical specification clauses 2706, 2200.

-

-

-

... More
Case - I : Using Concrete Mixer

-

-

-

... More
Excavation in Roadway cutting in soil by using manual means including loading in truck and carrying of cut earth to embankment site with all lifts and lead upto 1000 metre as per MoRT&H Technical Specification clauses of section 300.

1394

-

-

... More
For Drain

120

-

-

... More
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead with all lifts but excluding compaction ground supporting embankment/ subgrade, replacement by suitable soil, which shall be paid separately as per MoRT&H Technical Specification clauses of section 300.

475

-

-

... More
110 mm dia

50

-

-

... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

2071

-

-

... More
Girth Above 300 mm to 600 mm

8

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Section Wise

458

-

-

... More
All kinds of soils.

11243

-

-

... More
A. Using Concrete Mixer

5160

-

-

... More
Dismantling of Cement Concrete Pavements as per MoRT&H Technical Specification Clause 202 Dismantling of cement concrete pavements by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials with all lifts and upto a lead of 1000 m, stacking serviceable materials and unserviceable materials separately as per MoRT&H Technical Specification Clause 202. (B) upto partial depth of concrete

30

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1)

-

-

-

... More
RCC M 30 Grade

-

-

-

... More
(I) By Manual Means

-

-

-

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location with all lifts and lead up to 1000 m as per MoRTH Technical Specification clauses of section 300.

6166

-

-

... More
PCC M 15 Grade ( upto 5 m height )

212

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation , grass, bushes, shrubs,saplings and trees of girth upto 300 mm , removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRD Technical Specification clause 201.

-

-

-

... More
Dismantling of Brick soling Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and upto a lead of 500 m by manual means as per MoRD Technical Specification Clause 202.

253

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Section Wise

380

-

-

... More
(v) with 600 x 450 mm rectangular

6

-

-

... More
Fixing red danger tape on exposed & jutting out shoring in 2 rows on both sides of trench. (Payment to be made per running metre of trench. Rates quoted shall envisage re-use of items as far as practicable.).(Rate worked out considering 2 times usage for tape)

311

-

-

... More
Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in substructure complete as per drawings & MoRT&H technical specification Clauses 1600, 2200.

63.67

-

-

... More
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.

-

-

-

... More
Upto 5 m height

-

-

-

... More
a) 80 mm thick c.c. paver block of M-40 grade with approved colour, design and pattern.

9601

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m excluding Earthwork and Dismantling of Masonry Works as per MoRD Technical Specification Clause 202 .

-

-

-

... More
Direction and Place Identification Signs upto 0.9 sqm Size Board.

-

-

-

... More
Catch Pit Raft 150 Thick

10.03

-

-

... More
d) 160 mm Dia 10 kg/Sq.cm pipes

432

-

-

... More
( I ) By Manual Means

-

-

-

... More
Plastering with cement mortar 15 mm thick on brickwork in substructure as per MoRT&H technical specification Clauses 1300 & 2200

-

-

-

... More
503 Tack Coat (iv) Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per MoRD Technical Specification Clause 503.

2849

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope , verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per MoRD Technical Specification Clause 309.

1825

-

-

... More
(i) Compacting original ground supporting subgrade

-

-

-

... More
Neat cement punning.

6521

-

-

... More
Retaining Wall

30

-

-

... More
Retro-reflectorised Traffic Signs

-

-

-

... More
Earth filling (For marshy soil)

4938

-

-

... More
Turfing with Sods

-

-

-

... More
Pipe Laying And Others

-

-

-

... More
In 1:3 cement mortar

248

-

-

... More
Catch Pit Raft 150 Thick

31

-

-

... More
Removal of Telephone / Electric Poles and Lines

-

-

-

... More
Compacting Original Ground

-

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m excluding Earthwork and Dismantling of Masonry Works as per MoRD Technical Specification Clause 202 .

-

-

-

... More
Removal of Telephone / Electric Poles and Lines Removal of telephone/ electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

8

-

-

... More
Dismantling of Brick soling Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and upto a lead of 500 m by manual means as per MoRD Technical Specification Clause 202.

10

-

-

... More
Dismantling of CI water pipe line 600 mm dia including disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately under supervision of the concerned department but excluding earth excavation and dismantling of masonry works as per MoRD Technical Specification Clause 202.

485

-

-

... More
Both Side Weep Hole 110 Dia UPVC @ 5M C/C

181

-

-

... More
Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.2 for subgrade construction as per MoRT&H Technical Specification clauses of section 300.

4364

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H Technical Specification Clause 401. (iii) For Grading II Material

826

-

-

... More
In area of non-thorny jungle

0.55

-

-

... More
Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete : (DSR 2021, VOL - II, Page No- 470)

-

-

-

... More
(I) By Manual Means

-

-

-

... More
Drain Raft 150 Thick

522

-

-

... More
Dismantling of Fencing Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, backfilling of pit by manual means including disposal of dismantled material with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

15

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5.

730

-

-

... More
Cast in Situ Cement Concrete M 20 Kerb. Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawings & MoRT&H technical specifications Clauses 408.

-

-

-

... More
RCC M 30 Grade

-

-

-

... More
( I ) By Manual Means

-

-

-

... More
Demolishing brick work like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRT&H Technical Specification Clause 202.

-

-

-

... More
Cast in Situ Cement Concrete M 20 Kerb.

-

-

-

... More
a) 80 mm thick c.c. paver block of M-40 grade with approved colour, design and pattern.

6773

-

-

... More
Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in substructure complete as per drawings & MoRT&H technical specification Clauses 1600, 2200.

147.76

-

-

... More
Bituminous Concrete Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 509 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

80

-

-

... More
(vi) with 600 x 600 mm square

2

-

-

... More
Scarifying Existing Bituminous Surface to a depth of 150 mm by Mechanical Means

-

-

-

... More
Miscellaneous Works

-

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Bituminous Concrete Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 509 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

228

-

-

... More
Wet Mix Macadam

-

-

-

... More
502 Prime Coat (iii) High porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.20- 1.50 kg/sqm using mechanical means as per MoRD Technical Specification Clause 502.

2849

-

-

... More
(I) By Manual Means

-

-

-

... More
B) Driven at least 900 mm below ground and 900 mm above ground on average

50

-

-

... More
Construction of Embankment with Material Obtained from Borrow Pits

-

-

-

... More
Dismantling of flexible pavement and disposal of dismantled material up to a lead of 1000 meters, staking serviceable and unserviceable materials separately and as per leavent clauses of section-200.

-

-

-

... More
(I) By Manual Means

-

-

-

... More
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H Technical Specification Clause 406.

712

-

-

... More
Topographical survey Work using Total Station, preparation and finalization of survey drawings and CADD files, preparation of working drawing including Geotechnical work as directed by the Engineer in charge.

3.04

-

-

... More
B) Driven at least 900 mm below ground and 900 mm above ground on average

102

-

-

... More
Cutting of Trees, including cutting of Trunks, Branches and removal of Stumps

-

-

-

... More
A. Using Concrete Mixer

3041

-

-

... More
(iii) with 600 mm circular

6

-

-

... More
(ii) with 600 mm equilateral triangle

8

-

-

... More
Direction and Place Identification Signs upto 0.9 sqm Size Board.

2

-

-

... More
Drain Roof Slab 150 Thick

214.72

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
PCC M 15 Grade ( upto 5 m height )

608

-

-

... More
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and MoRT&H Technical Specification Clause 801.

9

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Length Wise

4768

-

-

... More
(iv) with 800 x 600 mm rectangular

2

-

-

... More
Drain Raft 150 Thick

250.5

-

-

... More
Supplying, fixing and installation of HDPE fabricated wall mounted Flap Gates of approved manufacturer, complete with anchor bolts and all other accessories complete as per specifications, drawings and direction of Engineer-In-Charge.

-

-

-

... More
Including dismembering

450

-

-

... More
Survey Work

-

-

-

... More
Single bamboo palasiding/walling of whole 2nd class bamboo (Jati or Bethua) 65 to 75 mm dia and closely packed & driven @ 150 mm c/c including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing bitumen drum sheet walling fixed with nails as per drawing and MoRD technical specification Clause 1302.5.

-

-

-

... More
B)Cement Concrete

194

-

-

... More
Drain Both Side Wall 150 Thick

319.27

-

-

... More
In area of non-thorny jungle

0.25

-

-

... More
Cast in Situ Cement Concrete M 20 Kerb. Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawings & MoRT&H technical specifications Clauses 408.

-

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Section Wise

868

-

-

... More
Drain Both Side Wall 150 Thick

498.79

-

-

... More
In 1:3 cement mortar

332

-

-

... More
Fixing red danger tape on exposed & jutting out shoring in 2 rows on both sides of trench. (Payment to be made per running metre of trench. Rates quoted shall envisage re-use of items as far as practicable.).(Rate worked out considering 2 times usage for tape)

1425

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.

-

-

-

... More
Upto 600 mm dia Hume pipe

85

-

-

... More
Neat cement punning.

4565

-

-

... More
Removal of Telephone / Electric Poles and Lines Removal of telephone/ electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

10

-

-

... More
Wet Mix Macadam

-

-

-

... More
Girth Above 900 mm to 1800 mm

1

-

-

... More
Above 600 mm to 900 mm dia Hume pipe

142

-

-

... More
Providing and laying factory made chamfered edge Cement Concrete paver blocks of required strength, thickness & size/ shape, made by table vibratory method to attain superior smooth finish using PU or equivalent moulds, laid in required grey colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with fine sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic parking etc. all complete as per specifications & approval/ direction of the Engineer -in-Charge:

-

-

-

... More
Brick masonry work in cement mortar in sub-structure complete excluding pointing & plastering, as per drawing & MoRT&H technical specification Clauses 1300, 2200.

-

-

-

... More
One Side Weep Hole 110 Dia UPVC @ 5M C/C

42

-

-

... More
Dismantling of 11/0.430KV, 3-Phase 315 KVA to 500KVA of Distribution Transformer on Pole with necessary connections.

1

-

-

... More
Cutting of Trees, including cutting of Trunks, Branches and removal of Stumps

-

-

-

... More
(A) By Mix in Place Method

-

-

-

... More
Supplying, fixing and installation of HDPE fabricated wall mounted Flap Gates of approved manufacturer, complete with anchor bolts and all other accessories complete as per specifications, drawings and direction of Engineer-In-Charge.

-

-

-

... More
Sand Filling

513

-

-

... More
Turfing with Sods

-

-

-

... More
d) 160 mm Dia 10 kg/Sq.cm pipes

435

-

-

... More
B)Cement Concrete

10

-

-

... More
Demolishing brick work like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRT&H Technical Specification Clause 202.

-

-

-

... More
Retro-reflectorised Traffic Signs

-

-

-

... More
(I) By Manual Means

-

-

-

... More
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.

-

-

-

... More
In area of non-thorny jungle

0.67

-

-

... More
Sand Filling

520

-

-

... More
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H Technical Specification Clause 406.

1032

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and up to a lead of 1000 m as per MoRTH technical Specification Clause 202.

-

-

-

... More
Ambassa Town-Storm Water Drain Work

-

-

-

... More
RCC M 30 Grade

-

-

-

... More
Topographical survey Work using Total Station, preparation and finalization of survey drawings and CADD files, preparation of working drawing including Geotechnical work as directed by the Engineer in charge.

2.52

-

-

... More
Sand Filling

180

-

-

... More
(iv) with 800 x 600 mm rectangular

2

-

-

... More
Cast in Situ Cement Concrete M 20 Kerb.

-

-

-

... More
Drain Both Side Wall 150 Thick

474

-

-

... More
(B)Granular Road

21

-

-

... More
Upto 600 mm dia Hume pipe

36

-

-

... More
Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H Technical Specification Clause 401

-

-

-

... More
Neat cement punning.

420

-

-

... More
Fixing red danger tape on bamboo poles in two rows on both sides of trench. (Payment to be made per running metre of trench. Rates quoted shall envisage re-use of items as far as practicable.).(Rate worked out considering 2 times usage for tape and 15 times usage for balli)

2369

-

-

... More
Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete : (DSR 2021, VOL - II, Page No- 470)

-

-

-

... More
RCC M 30 Grade

-

-

-

... More
Cutting of Trees, including cutting of Trunks, Branches and removal of Stumps & roots, Refilling, Compaction of Backfilling and stacking of serviceable material by manual means with all lifts and lead upto 1000 m as per MORT&H Technical specification Clause 201

-

-

-

... More
(i) with 900 mm equilateral triangle

4

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Length Wise

10319

-

-

... More
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H Technical Specification Clause 406.

249

-

-

... More
( I ) By Manual Means

-

-

-

... More
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead with all lifts but excluding compaction ground supporting embankment/ subgrade, replacement by suitable soil, which shall be paid separately as per MoRT&H Technical Specification clauses of section 300.

575

-

-

... More
Cutting of Trees, including cutting of Trunks, Branches and removal of Stumps & roots, Refilling, Compaction of Backfilling and stacking of serviceable material by manual means with all lifts and lead upto 1000 m as per MORT&H Technical specification Clause 201

-

-

-

... More
Dismantling of Cement Concrete Pavements as per MoRT&H Technical Specification Clause 202 Dismantling of cement concrete pavements by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials with all lifts and upto a lead of 1000 m, stacking serviceable materials and unserviceable materials separately as per MoRT&H Technical Specification Clause 202. (B) upto partial depth of concrete

22

-

-

... More
For Catch Pit

96

-

-

... More
In 1:3 cement mortar

2160

-

-

... More
RCPC Grating 12 Ton Load Capacity

-

-

-

... More
Both Side Weep Hole 110 Dia UPVC @ 5M C/C

44

-

-

... More
RCPC Grating 12 Ton Load Capacity

-

-

-

... More
Trench barricading for safety as per drawing and specification wherever directed by the Engineer. (Payment to be made as per running metre of trench) (Rates quoted shall envisage re-use of items as far as practicable).(Rate worked out considering 15 times usage)

2369

-

-

... More
(ii) For Grading II Material

960

-

-

... More
Safety Arrangements

-

-

-

... More
( II ) By Mechanical Means

-

-

-

... More
Sand Filling

471

-

-

... More
Earth filling (For marshy soil)

2539

-

-

... More
Topographical survey Work using Total Station, preparation and finalization of survey drawings and CADD files, preparation of working drawing including Geotechnical work as directed by the Engineer in charge.

15

-

-

... More
Gravel / Soil - Aggregate Surface Course ( Table 400.3 )

-

-

-

... More
Fixing red danger tape on bamboo poles in two rows on both sides of trench. (Payment to be made per running metre of trench. Rates quoted shall envisage re-use of items as far as practicable.).(Rate worked out considering 2 times usage for tape and 15 times usage for balli)

5699

-

-

... More
Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in substructure complete as per drawings & MoRT&H technical specification Clauses 1600, 2200.

70.66

-

-

... More
(B)Granular Road

5

-

-

... More
Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A- 9/261) HP/ Hr. 77.00 13 (i) The

1000

-

-

... More
Neat cement punning.

918

-

-

... More
Topographical survey Work using Total Station, preparation and finalization of survey drawings and CADD files, preparation of working drawing including Geotechnical work as directed by the Engineer in charge.

2.88

-

-

... More
Providing weep holes in brick masonry/ stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe or uPVC pipe (110 mm OD of 6.0 Kg/cm2 pressure) extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MoRT&H technical specification clauses 2706, 2200.

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRT&H Technical Specification clause 201.

-

-

-

... More
B) Cement Concrete

20

-

-

... More
Plastering with cement mortar 15 mm thick on brickwork in substructure as per MoRT&H technical specification Clauses 1300 & 2200

-

-

-

... More
(i) Compacting original ground supporting subgrade

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation , grass, bushes, shrubs,saplings and trees of girth upto 300 mm , removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRD Technical Specification clause 201.

-

-

-

... More
Providing weep holes in brick masonry/ stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe or uPVC pipe (110 mm OD of 6.0 Kg/cm2 pressure) extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MoRT&H technical specification clauses 2706, 2200.

-

-

-

... More
(Kumarghat Road Work

-

-

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil)

-

-

-

... More
Making up loss of material/ irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MoRD technical specification Clause 1903.

2849

-

-

... More
Survey Work

-

-

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil)

-

-

-

... More
Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)

902

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation , grass, bushes, shrubs,saplings and trees of girth upto 300 mm , removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRD Technical Specification clause 201.

-

-

-

... More
Dismantling of Fencing Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, backfilling of pit by manual means including disposal of dismantled material with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

15

-

-

... More
Bituminous Concrete Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 509 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

95

-

-

... More
1300 mm x 1500 mm

1

-

-

... More
(A)Bituminous Courses

47

-

-

... More
1000 mm x 800 mm

1

-

-

... More
A. Using Concrete Mixer

5699

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope , verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per MoRD Technical Specification Clause 309.

7562

-

-

... More
508 20 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/ modified bitumen) Binder. Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508. Case - I : By Manual Means (I) Bitumen of VG-30

1185

-

-

... More
Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 580 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawings & MoRT&H technical specifications Clauses 408.

-

-

-

... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

196

-

-

... More
Road Work

-

-

-

... More
1000 mm x 1000 mm

1

-

-

... More
Drain Roof Slab 150 Thick

195

-

-

... More
Brick masonry work in cement mortar in sub-structure complete excluding pointing & plastering, as per drawing & MoRT&H technical specification Clauses 1300, 2200.

-

-

-

... More
Statutory payments to water resources, National Highways, State Highways, Forest Department, Archeological Survey of India and similar organizations, Provision towards costs associated with social safeguards, Provision towards costs associated with environmental safeguards, Network expansions if required beyond the present scope,Nalla crossings, any dismantling work, shifting of utilities and miscellaneous works

1

-

-

... More
Earth filling (For marshy soil)

1622

-

-

... More
Safety Arrangements

-

-

-

... More
Earth filling (For marshy soil)

2442

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation , grass, bushes, shrubs,saplings and trees of girth upto 300 mm , removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRD Technical Specification clause 201.

-

-

-

... More
Providing weep holes in brick masonry/ stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe or uPVC pipe (110 mm OD of 6.0 Kg/cm2 pressure) extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MoRT&H technical specification clauses 2706, 2200.

-

-

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil)

-

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
(I) By Manual Means

-

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
For Catch Pit

55

-

-

... More
Plastering with cement mortar 15 mm thick on brickwork in substructure as per MoRT&H technical specification Clauses 1300 & 2200

-

-

-

... More
Survey Work

-

-

-

... More
Kumarghat Town-Storm Water Drain Work

-

-

-

... More
(A) In area of light jungle

1

-

-

... More
Dismantling of 11/0.430KV, 3-Phase 315 KVA to 500KVA of Distribution Transformer on Pole with necessary connections.

1

-

-

... More
Sand Filling

2253

-

-

... More
U-PVC coupler for UPVC drainage pipes 110/160 mm Dia

131

-

-

... More
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MoRD technical specification Clause 1903.

2849

-

-

... More
B) Driven at least 900 mm below ground and 900 mm above ground on average

300

-

-

... More
508 20 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/ modified bitumen) Binder. Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508. Case - I : By Manual Means (I) Bitumen of VG-30

2849

-

-

... More
Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.2 for subgrade construction as per MoRT&H Technical Specification clauses of section 300.

698

-

-

... More
Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per MoRD Technical Specification Clause 202. Dismantling of existing Steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
(vii) with 900 mm octagon

2

-

-

... More
Neat cement punning.

3769

-

-

... More
Girth Above 600 mm to 900 mm

2

-

-

... More
Trench barricading for safety as per drawing and specification wherever directed by the Engineer. (Payment to be made as per running metre of trench) (Rates quoted shall envisage re-use of items as far as practicable).(Rate worked out considering 15 times usage)

5160

-

-

... More
Statutory payments to water resources, National Highways, State Highways, Forest Department, Archeological Survey of India and similar organizations, Provision towards costs associated with social safeguards, Provision towards costs associated with environmental safeguards, Network expansions if required beyond the present scope,Nalla crossings, any dismantling work, shifting of utilities and miscellaneous works

1

-

-

... More
Single bamboo palasiding/walling of whole 2nd class bamboo (Jati or Bethua) 65 to 75 mm dia and closely packed & driven @ 150 mm c/c including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing bitumen drum sheet walling fixed with nails as per drawing and MoRD technical specification Clause 1302.5.

-

-

-

... More
Above 600 mm to 900 mm dia Hume pipe

59

-

-

... More
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and MoRT&H Technical Specification Clause 801.

8

-

-

... More
For Catch Pit

83

-

-

... More
Girth Above 300 mm to 600 mm

14

-

-

... More
(A)Bituminous Courses

25

-

-

... More
Maintenance of Earthen shoulder (Stripping of excess soil)

-

-

-

... More
Demolishing brick work like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRT&H Technical Specification Clause 202.

-

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m excluding Earthwork and Dismantling of Masonry Works as per MoRD Technical Specification Clause 202 .

-

-

-

... More
Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per MoRD Technical Specification Clause 202. Dismantling of existing Steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope , verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per MoRD Technical Specification Clause 309.

1294

-

-

... More
Dismantling of Brick soling Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and up to a lead of 500 m by manual means as per MoRTH technical Specification Clause 202.

10

-

-

... More
Proving and supplying and Fixing of RCPC Grating 12 Ton Load Capacity in Catch Pit- 600 x 600 x 600(H) all neccery civil works and equipment as per provided drawing and specefication all complete and direction of Engineer in In charge. (Including Loding Unloasding Transportation, Erection and GST )

271

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5.

388

-

-

... More
Topographical survey Work using Total Station, preparation and finalization of survey drawings and CADD files, preparation of working drawing including Geotechnical work as directed by the Engineer in charge.

22

-

-

... More
U-PVC coupler for UPVC drainage pipes 110/160 mm Dia

284

-

-

... More
Proving and supplying and Fixing of RCPC Grating 12 Ton Load Capacity in Catch Pit- 600 x 600 x 600(H) all neccery civil works and equipment as per provided drawing and specefication all complete and direction of Engineer in In charge. (Including Loding Unloasding Transportation, Erection and GST )

65

-

-

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location with all lifts and lead upto 1000 m as per MoRT&H Technical Specification clauses of section 300.

3128

-

-

... More
Circular shape 560 mm dia precast R.C.C. manhole cover with frame - E.H.D. - 35

173

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H Technical Specification Clause 406.

1031

-

-

... More
Maintenance of Earthen shoulder (Stripping of excess soil)

-

-

-

... More
Road Restoration Works

-

-

-

... More
(A)Bituminous Courses

103

-

-

... More
Excavation in Roadway cutting in soil by using manual means including loading in truck and carrying of cut earth to embankment site with all lifts and lead upto 1000 metre as per MoRT&H Technical Specification clauses of section 300.

1169

-

-

... More
Cast in Situ Cement Concrete M 20 Kerb.

-

-

-

... More
Cutting of Trees, including cutting of Trunks, Branches and removal of Stumps & roots, Refilling, Compaction of Backfilling and stacking of serviceable material by manual means with all lifts and lead upto 1000 m as per MORT&H Technical specification Clause 201

-

-

-

... More
Maintenance of Earthen shoulder (Stripping of excess soil)

-

-

-

... More
A. Using Concrete Mixer

2369

-

-

... More
Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete : (DSR 2021, VOL - II, Page No- 470)

-

-

-

... More
Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means

-

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Length Wise

2486

-

-

... More
In 1:3 cement mortar

4565

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Catch Pit Wall 150 thick

27.69

-

-

... More
Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412.

2669

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H Technical Specification Clause 401. (iii) For Grading II Material

237

-

-

... More
Ambassa Town-Road Work

-

-

-

... More
Upto 5 m height

-

-

-

... More
Circular shape 560 mm dia precast R.C.C. manhole cover with frame - E.H.D. - 35

80

-

-

... More
Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.2 for subgrade construction as per MoRT&H Technical Specification clauses of section 300.

2821

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
(ii) with 600 mm equilateral triangle

25

-

-

... More
Case - I : Using Concrete Mixer

4676

-

-

... More
A. Using Concrete Mixer

2520

-

-

... More
By Manual Means

-

-

-

... More
2000 mm x 1700 mm

1

-

-

... More
Removal of telephone/ electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRTH Technical Specification Clause 202.

66

-

-

... More
Retro-reflectorised Traffic Signs

-

-

-

... More
Dismantling of Brick soling Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and upto a lead of 500 m by manual means as per MoRD Technical Specification Clause 202.

49

-

-

... More
A) Lime Concrete

5

-

-

... More
In 1:3 cement mortar

24

-

-

... More
Dismantling of Brick soling Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and upto a lead of 500 m by manual means as per MoRD Technical Specification Clause 202.

197

-

-

... More
One Side Weep Hole 110 Dia UPVC @ 1M C/C

38

-

-

... More
Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H Technical Specification Clause 401

-

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Section Wise

378

-

-

... More
Drain Roof Slab 150 Thick

356.04

-

-

... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

198

-

-

... More
PCC M 15 Grade ( upto 5 m height )

141

-

-

... More
Case - I : Using Concrete Mixer

-

-

-

... More
All kinds of soils.

2193

-

-

... More
Miscellaneous Works

-

-

-

... More
Road Restoration Works

-

-

-

... More
RCC M 30 Grade

-

-

-

... More
Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete : (DSR 2021, VOL - II, Page No- 470)

-

-

-

... More
Removal of Telephone / Electric Poles and Lines Removal of telephone/ electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

10

-

-

... More
Girth Above 600 mm to 900 mm

5

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
(A) By Mix in Place Method

-

-

-

... More
Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)

667

-

-

... More
In 1:3 cement mortar

41

-

-

... More
Upto 600 mm dia Hume pipe

19

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, dewatering, construction of shoring, shuttering & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
Dismantling of 11/0.430KV, 3-Phase 315 KVA to 500KVA of Distribution Transformer on Pole with necessary connections.

3

-

-

... More
Excavation in Roadway cutting in soil by using manual means including loading in truck and carrying of cut earth to embankment site with all lifts and lead upto 1000 metre as per MoRT&H Technical Specification clauses of section 300.

782

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, dewatering, construction of shoring, shuttering & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
Removal of telephone/ electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

28

-

-

... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

1047

-

-

... More
500 mm x 600 mm

3

-

-

... More
One Side Weep Hole 110 Dia UPVC @ 5M C/C

22

-

-

... More
Circular shape 560 mm dia precast R.C.C. manhole cover with frame - E.H.D. - 35

48

-

-

... More
(A)Bituminous Road

12

-

-

... More
Catch Pit Wall 150 thick

29.71

-

-

... More
Earth filling (For marshy soil)

5004

-

-

... More
Plastering with cement mortar 15 mm thick on brickwork in substructure as per MoRT&H technical specification Clauses 1300 & 2200

-

-

-

... More
In 1:3 cement mortar

3769

-

-

... More
Plastering with cement mortar 15 mm thick on brickwork in substructure as per MoRT&H technical specification Clauses 1300 & 2200

-

-

-

... More
( II ) By Mechanical Means

-

-

-

... More
Upto 5 m height

-

-

-

... More
(v) with 600 x 450 mm rectangular

6

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m excluding Earthwork and Dismantling of Masonry Works as per MoRD Technical Specification Clause 202 .

-

-

-

... More
Pipe Laying And Others

-

-

-

... More
Compacting Original Ground

-

-

-

... More
Above 600 mm to 900 mm dia Hume pipe

128

-

-

... More
PCC M 15 Grade ( upto 5 m height )

606

-

-

... More
Plastering with cement mortar 15 mm thick on brickwork in substructure as per MoRT&H technical specification Clauses 1300 & 2200

-

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
In 1:3 cement mortar

918

-

-

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location with all lifts and lead upto 1000 m as per MoRT&H Technical Specification clauses of section 300.

4098

-

-

... More
Making up loss of material/ irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MoRD technical specification Clause 1903.

621

-

-

... More
Upto 5 m height

-

-

-

... More
Proving and supplying and Fixing of RCPC Grating 12 Ton Load Capacity in Catch Pit- 600 x 600 x 600(H) all neccery civil works and equipment as per provided drawing and specefication all complete and direction of Engineer in In charge. (Including Loding Unloasding Transportation, Erection and GST )

299

-

-

... More
Providing and laying factory made chamfered edge Cement Concrete paver blocks of required strength, thickness & size/ shape, made by table vibratory method to attain superior smooth finish using PU or equivalent moulds, laid in required grey colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with fine sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic parking etc. all complete as per specifications & approval/ direction of the Engineer -in-Charge:

-

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A- 9/261) HP/ Hr. 77.00 13 (i) The

1100

-

-

... More
Both Side Weep Hole 110 Dia UPVC @ 5M C/C

83

-

-

... More
Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

40

-

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil)

-

-

-

... More
Trench barricading for safety as per drawing and specification wherever directed by the Engineer. (Payment to be made as per running metre of trench) (Rates quoted shall envisage re-use of items as far as practicable).(Rate worked out considering 15 times usage)

5699

-

-

... More
I. Ordinary Soil

-

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Safety Arrangements

-

-

-

... More
C)Reinforced Cement Concrete

5

-

-

... More
(B)Granular Road

23

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

114

-

-

... More
C)Reinforced Cement Concrete

5

-

-

... More
Survey Work

-

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
Cast in Situ Cement Concrete M 20 Kerb. Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawings & MoRT&H technical specifications Clauses 408.

-

-

-

... More
Fixing red danger tape on exposed & jutting out shoring in 2 rows on both sides of trench. (Payment to be made per running metre of trench. Rates quoted shall envisage re-use of items as far as practicable.).(Rate worked out considering 2 times usage for tape)

593

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H Technical Specification Clause 406.

1440

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
502 Prime Coat (iii) High porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.20- 1.50 kg/sqm using mechanical means as per MoRD Technical Specification Clause 502.

994

-

-

... More
Catch Pit Raft 150 Thick

17.23

-

-

... More
All kinds of soils.

8749

-

-

... More
1000 mm x 900 mm

1

-

-

... More
Providing, lowering, laying in trenches, aligning, fixing in position and jointing socketed rubber gasket type ISI marked uPVC pipes of Class III (6 Kg/sqcm) with rubber ring joints (as per IS 4985-2000) of following outer dia with all accessories (excluding specials) complete including all material, labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. Note : E/w to be measured and paid separately.

-

-

-

... More
508 20 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/ modified bitumen) Binder. Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508. Case - I : By Manual Means (I) Bitumen of VG-30

4128

-

-

... More
(A)Bituminous Road

52

-

-

... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

169

-

-

... More
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.

-

-

-

... More
503 Tack Coat (iv) Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per MoRD Technical Specification Clause 503.

4128

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Length Wise

5704

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Providing, lowering, laying in trenches, aligning, fixing in position and jointing socketed rubber gasket type ISI marked uPVC pipes of Class III (6 Kg/sqcm) with rubber ring joints (as per IS 4985-2000) of following outer dia with all accessories (excluding specials) complete including all material, labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. Note : E/w to be measured and paid separately.

-

-

-

... More
Providing and fixing MS angle ( 50 x 50 x 5 mm) to act as nosing with lugs of MS flat 10 x 5 mm, 100 mm long forked at end 60 cm apart ( minimum three lugs to be provided ) including necessary welding and applying a priming coat of approved primer on exposed surface etc. complete.

2671

-

-

... More
Including dismembering

480

-

-

... More
By Manual Means

-

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1)

-

-

-

... More
( II ) By Mechanical Means

-

-

-

... More
Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)

2061

-

-

... More
Dismantling of Fencing Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, backfilling of pit by manual means including disposal of dismantled material with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

10

-

-

... More
Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete : (DSR 2021, VOL - II, Page No- 470)

-

-

-

... More
Case - I : Using Concrete Mixer

6375

-

-

... More
502 Prime Coat (iii) High porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.20- 1.50 kg/sqm using mechanical means as per MoRD Technical Specification Clause 502.

1185

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H Technical Specification Clause 401. (iii) For Grading II Material

570

-

-

... More
(A) By Mix in Place Method

-

-

-

... More
Statutory payments to water resources, National Highways, State Highways, Indian Railways, Forest Department, Archeological Survey of India and similar organizations, Provision towards costs associated with social safeguards, Provision towards costs associated with environmental safeguards, Network expansions if required beyond the present scope,Nalla crossings, any dismantling work, shifting of utilities and miscellaneous works

1

-

-

... More
Fixing red danger tape on bamboo poles in two rows on both sides of trench. (Payment to be made per running metre of trench. Rates quoted shall envisage re-use of items as far as practicable.).(Rate worked out considering 2 times usage for tape and 15 times usage for balli)

5160

-

-

... More
Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per MoRD Technical Specification Clause 202. Dismantling of existing Steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
C)Reinforced Cement Concrete

112

-

-

... More
Excavation in soil by manual means

-

-

-

... More
Providing, Laying, Jointing & field testing of high density Polyethyline pipes, (HDPE) conforming to IS 4984/14151/12786/13488 with necessary jointing material like mexchanical connector or jointing pipes heating to the ends of pipes with the help of telfon coated electric mirror/ heater to the required temprature and pressing the ends together against the each other, to form a manolithic & leak proof joint by thermosetting prosses. It may be required to be done with Jacks/Hydraulic Jacks/ but fusion machine. (50 mm and above fusion jointed & below 50 mm mechanical jointed) incl. hydraulic testing

-

-

-

... More
Schedule No. 2: Kailasahar Town

-

-

-

... More
C)Reinforced Cement Concrete

112

-

-

... More
Plastering with cement mortar 15 mm thick on brickwork in substructure as per MoRT&H technical specification Clauses 1300 & 2200

-

-

-

... More
Kailasahar Town-Drain Works

-

-

-

... More
Earth filling (For marshy soil)

1521

-

-

... More
Dismantling of flexible pavement and disposal of dismantled material up to a lead of 1000 meters, staking serviceable and unserviceable materials separately and as per leavent clauses of section-200.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.