Tripura Urban Planning And Development Authority Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.

Tripura Urban Planning And Development Authority Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date8 Nov 2023
Closing Date4 Jan 2024
Tender Amount₹ 56,43,70,781 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Technical Specification clause 201.

-

-

-

... More
(I) By Manual Means

-

-

-

... More
(A) In area of light jungle

1

-

-

... More
Removal of Telephone / Electric Poles and Lines

-

-

-

... More
Removal of telephone/ electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRTH Technical Specification Clause 202.

11

-

-

... More
Dismantling of 11/0.430KV, 3-Phase 315 KVA to 500KVA of Distribution Transformer on Pole with necessary connections.

1

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and up to a lead of 1000 m as per MoRTH technical Specification Clause 202.

-

-

-

... More
(I) By Manual Means

-

-

-

... More
A) Lime Concrete

5

-

-

... More
B) Cement Concrete

2

-

-

... More
C) Reinforced Cement Concrete

1

-

-

... More
Dismantling of Brick soling Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and up to a lead of 500 m by manual means as per MoRTH technical Specification Clause 202.

4

-

-

... More
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal up to 1000 metres.

-

-

-

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location with all lifts and lead up to 1000 m as per MoRTH Technical Specification clauses of section 300.

9899

-

-

... More
Excavation in soil by manual means

-

-

-

... More
Excavation in Roadway cutting in soil by using manual means including loading in truck and carrying of cut earth to embankment site with all lifts and lead upto 1000 metre as per MoRT&H Technical Specification clauses of section 300.

2475

-

-

... More
Compacting Original Ground

-

-

-

... More
(i) Compacting original ground supporting subgrade

-

-

-

... More
Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.2 for subgrade construction as per MoRT&H Technical Specification clauses of section 300.

2092

-

-

... More
Construction of Subgrade and Earthen Shoulders

-

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site , spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per MoRT&H Technical Specification clauses of section 300

1228

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead up to 1000 m as per MoRD Technical Specification Clause 301.5.

50

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1)

-

-

-

... More
(A) By Mix in Place Method

-

-

-

... More
Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H Technical Specification Clause 401

819

-

-

... More
Wet Mix Macadam

-

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H Technical Specification Clause 406.

1024

-

-

... More
502 Prime Coat (iii) High porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.20- 1.50 kg/sqm using mechanical means as per MoRD Technical Specification Clause 502.

14223

-

-

... More
Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

361

-

-

... More
503 Tack Coat (iv) Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per MoRD Technical Specification Clause 503.

13944

-

-

... More
Bituminous Concrete Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 509 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

465

-

-

... More
18 mm thick precast chequered cement concrete tiles

-

-

-

... More
Providing and fixing precast chequered cement concrete tiles 18 mm thick, laid in footpath & courtyard, on 20 mm thick bed of cement mortar 1:4 (1 cement : 4 fine sand) jointed with neat cement slurry including rubbing and cleaning complete as per direction of the Engineer-in-charge

4118.4

-

-

... More
Providing and fixing precast chequered cement concrete tiles 18 mm thick, laid in footpath & courtyard, on 20 mm thick bed of cement mortar 1:4 (1 cement : 4 fine sand) jointed with neat cement slurry including rubbing and cleaning complete as per direction of the Engineer-in-charge Shallow potholes (depth 75 mm )

50

-

-

... More
Retro-reflectorised Traffic Signs

-

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of high intensity grade shetting vide MoRT&H technical specification Clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and MoRT&H Technical Specification Clause 801.

-

-

-

... More
(i) with 900 mm equilateral triangle

6

-

-

... More
(ii) with 600 mm equilateral triangle

8

-

-

... More
(iii) with 600 mm circular

6

-

-

... More
(iv) with 800 x 600 mm rectangular

10

-

-

... More
(v) with 600 x 450 mm rectangular

6

-

-

... More
(vi) with 600 x 600 mm square

4

-

-

... More
(vii) with 900 mm octagon

2

-

-

... More
Direction and Place Identification Signs upto 0.9 sqm Size Board.

-

-

-

... More
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and MoRT&H Technical Specification Clause 801.

4

-

-

... More
Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on precast M20 grade RCC vertical posts1.8 metres high (1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed 2 metres centre to, complete as per approved drawing.

25

-

-

... More
Road marking strips (retro-reflective) of specified shade/ colour using Hot Applied Thermoplastic material with Reflectorising Glass Beads on Bituminous Surface Providing and applying 2.5 mm thick thick road marking strips (retro-reflective) of specified shade/ colour using hot thermoplastic material including reflectorising glass beads @ 250 gms per sqm area by fully/ semi-automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater including cost of cleaning the road surface of all dirt, seals, oil, grease and foreign material etc, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes as per MoRT&H Technical Specification Clause 803

-

-

-

... More
a) Lane/ Centre line/ Edge marking/ Transverse marking and any other marking

50

-

-

... More
Cutting of Trees, including cutting of Trunks, Branches and removal of Stumps

-

-

-

... More
Cutting of Trees, including cutting of Trunks, Branches and removal of Stumps & roots, Refilling, Compaction of Backfilling and stacking of serviceable material by manual means with all lifts and lead upto 1000 m as per MORT&H Technical specification Clause 201

-

-

-

... More
Girth Above 900 mm to 1800 mm

2

-

-

... More
Girth Above 600 mm to 900 mm

2

-

-

... More
Providing labour at site supplied with all necessary hand tools inclusive of all cost overhead and profit margin etc.

-

-

-

25

-

-

... More
Labour/Mazdoor

25

-

-

... More
Mason (1st Class)

25

-

-

... More
Providing material including cost of material, carriage and its staking at site including all taxes, overhead and profits etc.

-

-

-

... More
Cement ordinary Portland or equivalent in bags

1

-

-

... More
High Yield Strength Deformed steel reinforcing bar up to 16mm dia to as per IS 432

0.2

-

-

... More
Providing clean well graded river or pit sand at site (Sand (Fine) : from local quarries)

10

-

-

... More
Providing hard cut stone boulders at site 15-30cm size

20

-

-

... More
Providing coarse aggregate of 20mm to 10mm size as per MoRT&H Specifications.

5

-

-

... More
Providing construction machine / equipment with drivers/ operators including fuel, lubricants, reapairs, maintenance, all taxes, overhead and profits etc.

-

-

-

... More
Tipper 5.5 cum/10 t

10

-

-

... More
Hire and running charge of Tractor with ripper attachment

10

-

-

... More
Hire charge of Hydraulic Excavator (3D) with driver and fuel

10

-

-

... More
Hire charge of Concrete mixer 0.25-0.40 cubic metre with hopper

10

-

-

... More
Hire and running charge of loader (Front end-loader)

10

-

-

... More
Dozer D80

10

-

-

... More
Grader

10

-

-

... More
Drain Works-Khowai Town

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation , grass, bushes, shrubs,saplings and trees of girth upto 300 mm , removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRD Technical Specification clause 201.

-

-

-

... More
By Manual Means

-

-

-

... More
In area of non-thorny jungle

0.5

-

-

... More
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.

-

-

-

... More
All kinds of soils.

7994

-

-

... More
Dismantling of Brick soling Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and upto a lead of 500 m by manual means as per MoRD Technical Specification Clause 202.

180

-

-

... More
Dismantling of flexible pavement and disposal of dismantled material up to a lead of 1000 meters, staking serviceable and unserviceable materials separately and as per leavent clauses of section-200.

-

-

-

... More
( I ) By Manual Means

-

-

-

... More
(A)Bituminous Road

50

-

-

... More
(B)Granular Road

20

-

-

... More
( II ) By Mechanical Means

-

-

-

... More
(A)Bituminous Courses

101

-

-

... More
Dismantling of Cement Concrete Pavements as per MoRT&H Technical Specification Clause 202 Dismantling of cement concrete pavements by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials with all lifts and upto a lead of 1000 m, stacking serviceable materials and unserviceable materials separately as per MoRT&H Technical Specification Clause 202. (B) upto partial depth of concrete

42

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, dewatering, construction of shoring, shuttering & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
I. Ordinary Soil

-

-

-

... More
I) Upto 3.0 m Depth

17872

-

-

... More
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead with all lifts but excluding compaction ground supporting embankment/ subgrade, replacement by suitable soil, which shall be paid separately as per MoRT&H Technical Specification clauses of section 300.

475

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Earth filling (For marshy soil)

4397

-

-

... More
Sand Filling

468

-

-

... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

1828

-

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil)

-

-

-

... More
Making up loss of material/ irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MoRD technical specification Clause 1903.

2515

-

-

... More
Maintenance of Earthen shoulder (Stripping of excess soil)

-

-

-

... More
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MoRD technical specification Clause 1903.

2515

-

-

... More
Single bamboo palasiding/walling of whole 2nd class bamboo (Jati or Bethua) 65 to 75 mm dia and closely packed & driven @ 150 mm c/c including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing bitumen drum sheet walling fixed with nails as per drawing and MoRD technical specification Clause 1302.5.

-

-

-

... More
B) Driven at least 900 mm below ground and 900 mm above ground on average

345

-

-

... More
Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)

1926

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
PCC M 15 Grade ( upto 5 m height )

570

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
RCC M 30 Grade

-

-

-

... More
Upto 5 m height

-

-

-

... More
Case - I : Using Concrete Mixer

4626

-

-

... More
Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in substructure complete as per drawings & MoRT&H technical specification Clauses 1600, 2200.

337.33

-

-

... More
Brick masonry work in cement mortar in sub-structure complete excluding pointing & plastering, as per drawing & MoRT&H technical specification Clauses 1300, 2200.

-

-

-

... More
In 1:3 cement mortar

101

-

-

... More
Plastering with cement mortar 15 mm thick on brickwork in substructure as per MoRT&H technical specification Clauses 1300 & 2200

-

-

-

... More
In 1:3 cement mortar

733

-

-

... More
Neat cement punning.

733

-

-

... More
Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete : (DSR 2021, VOL - II, Page No- 470)

-

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Section Wise

607

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Length Wise

10060

-

-

... More
Providing weep holes in brick masonry/ stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe or uPVC pipe (110 mm OD of 6.0 Kg/cm2 pressure) extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MoRT&H technical specification clauses 2706, 2200.

-

-

-

... More
One Side Weep Hole 110 Dia UPVC @ 5M C/C

125

-

-

... More
Both Side Weep Hole 110 Dia UPVC @ 5M C/C

173

-

-

... More
Providing, lowering, laying in trenches, aligning, fixing in position and jointing socketed rubber gasket type ISI marked uPVC pipes of Class III (6 Kg/sqcm) with rubber ring joints (as per IS 4985-2000) of following outer dia with all accessories (excluding specials) complete including all material, labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. Note : E/w to be measured and paid separately.

-

-

-

... More
110 mm dia

75

-

-

... More
U-PVC coupler for UPVC drainage pipes 110/160 mm Dia

202

-

-

... More
Road Restoration Works

-

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H Technical Specification Clause 401. (iii) For Grading II Material

297

-

-

... More
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H Technical Specification Clause 406.

371

-

-

... More
502 Prime Coat (iii) High porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.20- 1.50 kg/sqm using mechanical means as per MoRD Technical Specification Clause 502.

1485

-

-

... More
Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

59

-

-

... More
503 Tack Coat (iv) Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per MoRD Technical Specification Clause 503.

1485

-

-

... More
Bituminous Concrete Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 509 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

119

-

-

... More
508 20 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/ modified bitumen) Binder. Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508. Case - I : By Manual Means (I) Bitumen of VG-30

1485

-

-

... More
Cast in Situ Cement Concrete M 20 Kerb. Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawings & MoRT&H technical specifications Clauses 408.

-

-

-

... More
A. Using Concrete Mixer

5030

-

-

... More
Miscellaneous Works

-

-

-

... More
Dismantling of Fencing Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, backfilling of pit by manual means including disposal of dismantled material with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

10

-

-

... More
Removal of Telephone / Electric Poles and Lines Removal of telephone/ electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

8

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
(I) By Manual Means

-

-

-

... More
B)Cement Concrete

200

-

-

... More
C)Reinforced Cement Concrete

110

-

-

... More
Demolishing brick work like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRT&H Technical Specification Clause 202.

-

-

-

... More
Dismantling brick / tile work

-

-

-

... More
In cement mortar.

140

-

-

... More
Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per MoRD Technical Specification Clause 202. Dismantling of existing Steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
Including dismembering

665

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m excluding Earthwork and Dismantling of Masonry Works as per MoRD Technical Specification Clause 202 .

-

-

-

... More
Upto 600 mm dia Hume pipe

75

-

-

... More
Above 600 mm to 900 mm dia Hume pipe

126

-

-

... More
Dismantling old C.I. / D.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes at site lead upto 50 metre as per CPWD specification and direction of the Engineer - in - charge.

-

-

-

... More
i.80 mm dia

38.5

-

-

... More
ii.100 mm dia

38.5

-

-

... More
iii.125 mm dia

38.5

-

-

... More
iv.150 mm dia

38.5

-

-

... More
v.200 mm dia

37.5

-

-

... More
vi.250mm dia

37.5

-

-

... More
vii.300mm dia

37.5

-

-

... More
viii.350mm dia

37.5

-

-

... More
ix.400mm dia

37.5

-

-

... More
x.450mm dia

36.5

-

-

... More
xi.500mm dia

36.5

-

-

... More
xii.600mm dia

35.5

-

-

... More
Charges for cutting C.I. pipe with steel saw by manual means as per CPWD specification and direction of the Engineer - in - charge.

-

-

-

... More
i.80 mm dia

15

-

-

... More
ii.100 mm dia

10

-

-

... More
iii.125 mm dia

10

-

-

... More
iv.150 mm dia

10

-

-

... More
Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A- 9/261) HP/ Hr. 77.00 13 (i) The

3500

-

-

... More
Circular shape 560 mm dia precast R.C.C. manhole cover with frame - E.H.D. - 35

261

-

-

... More
Proving and supplying and Fixing of RCPC Grating 12 Ton Load Capacity in Catch Pit- 600 x 600 x 600(H) all neccery civil works and equipment as per provided drawing and specefication all complete and direction of Engineer in In charge. (Including Loding Unloasding Transportation, Erection and GST )

268

-

-

... More
Supplying, fixing and installation of HDPE fabricated wall mounted Flap Gates of approved manufacturer, complete with anchor bolts and all other accessories complete as per specifications, drawings and direction of Engineer-In-Charge.

-

-

-

... More
1600 mm x 1600 mm

1

-

-

... More
1250 mm x 1150 mm

1

-

-

... More
1200 mm x 1000 mm

1

-

-

... More
800 mm x 850 mm

1

-

-

... More
500 mm x 500 mm

1

-

-

... More
Providing and anchoring polypropylene coated MS foot rests (weighing approximately 0.9 kg) for chamber/pit/sump/ walls etc. at levels and intervals as directed by engineer.

34

-

-

... More
Survey, Investigations, Designing, Supplying and Laying of R.C.C. NP4 pipes using trenchless / jack-pushing method true to line as shown in the construction drawings, including preparation of survey / construction drawing, construction of all jacking / receiving pit, earthwork in excavation, backfilling after conversion of shafts/pit to manholes, bailing out / dewatering (by pumps or otherwise) water from working area, disposal of muck / spoil, dismantling and removal of jacking / receiving shafts, barricading, all safety measures, sign boards, area lighting, transportation, temporary diversion of utilities, traffic diversion arrangements, cleaning of pipeline, final clearing of sites, etc. all complete as per drawings and specification including cost of all materials, labours and plant & equipment. The rate shall include all necessary equipment, machinery, man power and consummables, complete as per specification and direction of Engineer.

-

-

-

... More
1400 mm dia RCC NP4 Pipe

20

-

-

... More
Safety Arrangements

-

-

-

... More
Trench barricading for safety as per drawing and specification wherever directed by the Engineer. (Payment to be made as per running metre of trench) (Rates quoted shall envisage re-use of items as far as practicable).(Rate worked out considering 15 times usage)

5030

-

-

... More
Fixing red danger tape on bamboo poles in two rows on both sides of trench. (Payment to be made per running metre of trench. Rates quoted shall envisage re-use of items as far as practicable.).(Rate worked out considering 2 times usage for tape and 15 times usage for balli)

5030

-

-

... More
Fixing red danger tape on exposed & jutting out shoring in 2 rows on both sides of trench. (Payment to be made per running metre of trench. Rates quoted shall envisage re-use of items as far as practicable.).(Rate worked out considering 2 times usage for tape)

1258

-

-

... More
Survey Work

-

-

-

... More
Topographical survey Work using Total Station, preparation and finalization of survey drawings and CADD files, preparation of working drawing including Geotechnical work as directed by the Engineer in charge.

30

-

-

... More
Ranirbazar Road Work

-

-

-

... More
Topographical survey Work using Total Station, preparation and finalization of survey drawings and CADD files, preparation of working drawing including Geotechnical work as directed by the Engineer in charge.

0.45

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRT&H Technical Specification clause 201.

-

-

-

... More
(I) By Manual Means

-

-

-

... More
(A) In area of light jungle

0.2

-

-

... More
Removal of Telephone / Electric Poles and Lines

-

-

-

... More
Removal of telephone/ electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

26

-

-

... More
Dismantling of 11/0.430KV, 3-Phase 315 KVA to 500KVA of Distribution Transformer on Pole with necessary connections.

2

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
(I) By Manual Means

-

-

-

... More
A) Lime Concrete

15

-

-

... More
B)Cement Concrete

10

-

-

... More
C)Reinforced Cement Concrete

5

-

-

... More
Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means

-

-

-

... More
Scarifying Existing bituminous Road Surface by mechanical means to a Depth of 150 mm and disposal of scarified material with all lifts and leads upto 1000 m as per MoRT&H Technical Specification clauses of section 300.

700

-

-

... More
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.

-

-

-

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location with all lifts and lead upto 1000 m as per MoRT&H Technical Specification clauses of section 300.

60.39

-

-

... More
Excavation in soil by manual means

-

-

-

... More
Excavation in Roadway cutting in soil by using manual means including loading in truck and carrying of cut earth to embankment site with all lifts and lead upto 1000 metre as per MoRT&H Technical Specification clauses of section 300.

15.1

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Earth filling (For marshy soil)

131.11

-

-

... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

100

-

-

... More
Compacting Original Ground

-

-

-

... More
(i) Compacting original ground supporting subgrade

-

-

-

... More
Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.2 for subgrade construction as per MoRT&H Technical Specification clauses of section 300.

117.6

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site , spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per MoRT&H Technical Specification clauses of section 300

50

-

-

... More
(A)With Borrow Area

-

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1)

-

-

-

... More
(A) By Mix in Place Method

-

-

-

... More
Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H Technical Specification Clause 401

-

-

-

... More
(ii) For Grading II Material

54.45

-

-

... More
Wet Mix Macadam

-

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H Technical Specification Clause 406.

197.18

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Sand Filling

84.98

-

-

... More
80 mm thick factory made c.c. interlocking paver block of M-40 Grade

-

-

-

... More
Providing and laying factory made chamfered edge Cement Concrete paver blocks of required strength, thickness & size/ shape, made by table vibratory method to attain superior smooth finish using PU or equivalent moulds, laid in required grey colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with fine sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic parking etc. all complete as per specifications & approval/ direction of the Engineer -in-Charge:

-

-

-

... More
a) 80 mm thick c.c. paver block of M-40 grade with approved colour, design and pattern.

1700

-

-

... More
Cast in Situ Cement Concrete M 20 Kerb.

-

-

-

... More
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete inposition to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-Charge (length of finished kerb edging shall be measured for payment). (Precast c.c. kerb stone shall be approved by Engineer-in- Charge).

58.65

-

-

... More
Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on precast M20 grade RCC vertical posts1.8 metres high (1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed 2 metres centre to, complete as per approved drawing.

25

-

-

... More
Retro-reflectorised Traffic Signs

-

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of high intensity grade shetting vide MoRT&H technical specification Clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and MoRT&H Technical Specification Clause 801.

-

-

-

... More
(i) with 900 mm equilateral triangle

12

-

-

... More
(ii) with 600 mm equilateral triangle

15

-

-

... More
(iv) with 800 x 600 mm rectangular

6

-

-

... More
(v) with 600 x 450 mm rectangular

6

-

-

... More
Direction and Place Identification Signs upto 0.9 sqm Size Board.

-

-

-

... More
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and MoRT&H Technical Specification Clause 801.

6

-

-

... More
Road marking strips (retro-reflective) of specified shade/ colour using Hot Applied Thermoplastic material with Reflectorising Glass Beads on Bituminous Surface

-

-

-

... More
Providing and applying 2.5 mm thick thick road marking strips (retro-reflective) of specified shade/ colour using hot thermoplastic material including reflectorising glass beads @ 250 gms per sqm area by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater including cost of cleaning the road surface of all dirt, seals, oil, grease and foreign material etc, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes as per MoRT&H Technical Specification Clause 803

-

-

-

... More
a) Lane/ Centre line/ Edge marking/ Transverse marking and any other marking

50

-

-

... More
Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering as per MoRD Technical Specification Clause 412.

519.75

-

-

... More
Cutting of Trees, including cutting of Trunks, Branches and removal of Stumps

-

-

-

... More
Cutting of Trees, including cutting of Trunks, Branches and removal of Stumps & roots, Refilling, Compaction of Backfilling and stacking of serviceable material by manual means with all lifts and lead upto 1000 m as per MORT&H Technical specification Clause 201

-

-

-

... More
Girth Above 300 mm to 600 mm

6

-

-

... More
Girth Above 600 mm to 900 mm

3

-

-

... More
Girth Above 900 mm to 1800 mm

3

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5.

200

-

-

... More
Turfing with Sods

-

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope , verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per MoRD Technical Specification Clause 309.

267

-

-

... More
Providing labour at site supplied with all necessary hand tools inclusive of all cost overhead and profit margin etc.

-

-

-

25

-

-

... More
Labour/Mazdoor

25

-

-

... More
Mason (1st Class)

25

-

-

... More
Providing material including cost of material, carriage and its staking at site including all taxes, overhead and profits etc.

-

-

-

... More
Cement ordinary Portland or equivalent in bags

1

-

-

... More
High Yield Strength Deformed steel reinforcing bar up to 16mm dia to as per IS 432

0.2

-

-

... More
Providing clean well graded river or pit sand at site (Sand (Fine) : from local quarries)

10

-

-

... More
Providing hard cut stone boulders at site 15-30cm size

20

-

-

... More
Providing coarse aggregate of 20mm to 10mm size as per MoRT&H Specifications.

5

-

-

... More
Providing construction machine / equipment with drivers/ operators including fuel,lubricants,reapairs,maintennace, all taxes, overhead and profits etc.

-

-

-

... More
Tipper 5.5 cum/10 t

10

-

-

... More
Hire and running charge of Tractor with ripper attachment

10

-

-

... More
Hire charge of Hydraulic Excavator (3D) with driver and fuel

10

-

-

... More
Hire charge of Concrete mixer 0.25-0.40 cubic metre with hopper

10

-

-

... More
Hire and running charge of loader (Front end-loader)

10

-

-

... More
Dozer D80

10

-

-

... More
Grader

10

-

-

... More
Ranirbazar Town-Storm Water Drain Work

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation , grass, bushes, shrubs,saplings and trees of girth upto 300 mm , removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRD Technical Specification clause 201.

-

-

-

... More
By Manual Means

-

-

-

... More
In area of non-thorny jungle

0.42

-

-

... More
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.

-

-

-

... More
All kinds of soils.

6379

-

-

... More
Dismantling of Brick soling Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and upto a lead of 500 m by manual means as per MoRD Technical Specification Clause 202.

144

-

-

... More
Dismantling of flexible pavement and disposal of dismantled material up to a lead of 1000 meters, staking serviceable and unserviceable materials separately and as per leavent clauses of section-200.

-

-

-

... More
( I ) By Manual Means

-

-

-

... More
(A)Bituminous Road

49

-

-

... More
(B)Granular Road

20

-

-

... More
( II ) By Mechanical Means

-

-

-

... More
(A)Bituminous Courses

98

-

-

... More
Dismantling of Cement Concrete Pavements as per MoRT&H Technical Specification Clause 202 Dismantling of cement concrete pavements by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials with all lifts and upto a lead of 1000 m, stacking serviceable materials and unserviceable materials separately as per MoRT&H Technical Specification Clause 202. (B) upto partial depth of concrete

45

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, dewatering, construction of shoring, shuttering & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
I. Ordinary Soil

-

-

-

... More
I) Upto 3.0 m Depth

14406

-

-

... More
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead with all lifts but excluding compaction ground supporting embankment/ subgrade, replacement by suitable soil, which shall be paid separately as per MoRT&H Technical Specification clauses of section 300.

475

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Earth filling (For marshy soil)

4176

-

-

... More
Sand Filling

369

-

-

... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

1760

-

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil)

-

-

-

... More
Making up loss of material/ irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MoRD technical specification Clause 1903.

2461

-

-

... More
Maintenance of Earthen shoulder (Stripping of excess soil)

-

-

-

... More
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MoRD technical specification Clause 1903.

2461

-

-

... More
Single bamboo palasiding/walling of whole 2nd class bamboo (Jati or Bethua) 65 to 75 mm dia and closely packed & driven @ 150 mm c/c including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing bitumen drum sheet walling fixed with nails as per drawing and MoRD technical specification Clause 1302.5.

-

-

-

... More
B) Driven at least 900 mm below ground and 900 mm above ground on average

393

-

-

... More
Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)

1597

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
PCC M 15 Grade ( upto 5 m height )

462

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
RCC M 30 Grade

-

-

-

... More
Upto 5 m height

-

-

-

... More
Case - I : Using Concrete Mixer

3282

-

-

... More
Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in substructure complete as per drawings & MoRT&H technical specification Clauses 1600, 2200.

238.69

-

-

... More
Brick masonry work in cement mortar in sub-structure complete excluding pointing & plastering, as per drawing & MoRT&H technical specification Clauses 1300, 2200.

-

-

-

... More
In 1:3 cement mortar

98

-

-

... More
Plastering with cement mortar 15 mm thick on brickwork in substructure as per MoRT&H technical specification Clauses 1300 & 2200

-

-

-

... More
In 1:3 cement mortar

516

-

-

... More
Neat cement punning.

516

-

-

... More
Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete : (DSR 2021, VOL - II, Page No- 470)

-

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Section Wise

336

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Length Wise

9842

-

-

... More
Providing weep holes in brick masonry/ stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe or uPVC pipe (110 mm OD of 6.0 Kg/cm2 pressure) extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MoRT&H technical specification clauses 2706, 2200.

-

-

-

... More
One Side Weep Hole 110 Dia UPVC @ 5M C/C

143

-

-

... More
Both Side Weep Hole 110 Dia UPVC @ 5M C/C

129

-

-

... More
Providing, lowering, laying in trenches, aligning, fixing in position and jointing socketed rubber gasket type ISI marked uPVC pipes of Class III (6 Kg/sqcm) with rubber ring joints (as per IS 4985-2000) of following outer dia with all accessories (excluding specials) complete including all material, labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. Note : E/w to be measured and paid separately.

-

-

-

... More
110 mm dia

120

-

-

... More
U-PVC coupler for UPVC drainage pipes 110/160 mm Dia

338

-

-

... More
Road Restoration Works

-

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H Technical Specification Clause 401. (iii) For Grading II Material

492

-

-

... More
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H Technical Specification Clause 406.

615

-

-

... More
502 Prime Coat (iii) High porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.20- 1.50 kg/sqm using mechanical means as per MoRD Technical Specification Clause 502.

2461

-

-

... More
Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

98

-

-

... More
503 Tack Coat (iv) Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per MoRD Technical Specification Clause 503.

2461

-

-

... More
Bituminous Concrete Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 509 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

197

-

-

... More
508 20 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/ modified bitumen) Binder. Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508. Case - I : By Manual Means (I) Bitumen of VG-30

2461

-

-

... More
Cast in Situ Cement Concrete M 20 Kerb. Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawings & MoRT&H technical specifications Clauses 408.

-

-

-

... More
A. Using Concrete Mixer

4921

-

-

... More
Miscellaneous Works

-

-

-

... More
Dismantling of Fencing Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, backfilling of pit by manual means including disposal of dismantled material with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

12

-

-

... More
Removal of Telephone / Electric Poles and Lines Removal of telephone/ electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

10

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
(I) By Manual Means

-

-

-

... More
B)Cement Concrete

220

-

-

... More
C)Reinforced Cement Concrete

115

-

-

... More
Demolishing brick work like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRT&H Technical Specification Clause 202.

-

-

-

... More
Dismantling brick / tile work

-

-

-

... More
In cement mortar.

150

-

-

... More
Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per MoRD Technical Specification Clause 202. Dismantling of existing Steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
Including dismembering

700

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m excluding Earthwork and Dismantling of Masonry Works as per MoRD Technical Specification Clause 202 .

-

-

-

... More
Upto 600 mm dia Hume pipe

74

-

-

... More
Above 600 mm to 900 mm dia Hume pipe

123

-

-

... More
Dismantling old C.I. / D.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes at site lead upto 50 metre as per CPWD specification and direction of the Engineer - in - charge.

-

-

-

... More
i.80 mm dia

41

-

-

... More
ii.100 mm dia

41

-

-

... More
iii.125 mm dia

41

-

-

... More
iv.150 mm dia

41

-

-

... More
v.200 mm dia

40

-

-

... More
vi.250mm dia

40

-

-

... More
vii.300mm dia

40

-

-

... More
viii.350mm dia

40

-

-

... More
ix.400mm dia

39

-

-

... More
x.450mm dia

39

-

-

... More
xi.500mm dia

39

-

-

... More
xii.600mm dia

41

-

-

... More
Charges for cutting C.I. pipe with steel saw by manual means as per CPWD specification and direction of the Engineer - in - charge.

-

-

-

... More
i.80 mm dia

15

-

-

... More
ii.100 mm dia

10

-

-

... More
iii.125 mm dia

8

-

-

... More
iv.150 mm dia

8

-

-

... More
Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A- 9/261) HP/ Hr. 77.00 13 (i) The

4000

-

-

... More
Circular shape 560 mm dia precast R.C.C. manhole cover with frame - E.H.D. - 35

256

-

-

... More
Proving and supplying and Fixing of RCPC Grating 12 Ton Load Capacity in Catch Pit- 600 x 600 x 600(H) all neccery civil works and equipment as per provided drawing and specefication all complete and direction of Engineer in In charge. (Including Loding Unloasding Transportation, Erection and GST )

322

-

-

... More
Supplying, fixing and installation of HDPE fabricated wall mounted Flap Gates of approved manufacturer, complete with anchor bolts and all other accessories complete as per specifications, drawings and direction of Engineer-In-Charge.

-

-

-

... More
1200 mm x 1000 mm

3

-

-

... More
700 mm x 1000 mm

2

-

-

... More
600 mm x 1000 mm

1

-

-

... More
Providing and anchoring polypropylene coated MS foot rests (weighing approximately 0.9 kg) for chamber/pit/sump/ walls etc. at levels and intervals as directed by engineer.

36

-

-

... More
Safety Arrangements

-

-

-

... More
Trench barricading for safety as per drawing and specification wherever directed by the Engineer. (Payment to be made as per running metre of trench) (Rates quoted shall envisage re-use of items as far as practicable).(Rate worked out considering 15 times usage)

4921

-

-

... More
Fixing red danger tape on bamboo poles in two rows on both sides of trench. (Payment to be made per running metre of trench. Rates quoted shall envisage re-use of items as far as practicable.).(Rate worked out considering 2 times usage for tape and 15 times usage for balli)

4921

-

-

... More
Fixing red danger tape on exposed & jutting out shoring in 2 rows on both sides of trench. (Payment to be made per running metre of trench. Rates quoted shall envisage re-use of items as far as practicable.).(Rate worked out considering 2 times usage for tape)

1230

-

-

... More
Survey Work

-

-

-

... More
Topographical survey Work using Total Station, preparation and finalization of survey drawings and CADD files, preparation of working drawing including Geotechnical work as directed by the Engineer in charge.

20

-

-

... More
Mohanpur Town-Road Work

-

-

-

... More
Topographical survey Work using Total Station, preparation and finalization of survey drawings and CADD files, preparation of working drawing including Geotechnical work as directed by the Engineer in charge.

2.71

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRT&H Technical Specification clause 201.

-

-

-

... More
(I) By Manual Means

-

-

-

... More
(A) In area of light jungle

1

-

-

... More
Removal of Telephone / Electric Poles and Lines

-

-

-

... More
Removal of telephone/ electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

26

-

-

... More
Dismantling of 11/0.430KV, 3-Phase 315 KVA to 500KVA of Distribution Transformer on Pole with necessary connections.

1

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
(I) By Manual Means

-

-

-

... More
A) Lime Concrete

15

-

-

... More
B)Cement Concrete

10

-

-

... More
C)Reinforced Cement Concrete

5

-

-

... More
Dismantling of Brick soling Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and upto a lead of 500 m by manual means as per MoRD Technical Specification Clause 202.

10

-

-

... More
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.

-

-

-

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location with all lifts and lead upto 1000 m as per MoRT&H Technical Specification clauses of section 300.

5102

-

-

... More
Excavation in soil by manual means

-

-

-

... More
Excavation in Roadway cutting in soil by using manual means including loading in truck and carrying of cut earth to embankment site with all lifts and lead upto 1000 metre as per MoRT&H Technical Specification clauses of section 300.

1276

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Earth filling (For marshy soil)

2301

-

-

... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

238

-

-

... More
Compacting Original Ground

-

-

-

... More
(i) Compacting original ground supporting subgrade

-

-

-

... More
Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.2 for subgrade construction as per MoRT&H Technical Specification clauses of section 300.

4058

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site , spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per MoRT&H Technical Specification clauses of section 300

50

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1)

-

-

-

... More
(A) By Mix in Place Method

-

-

-

... More
Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H Technical Specification Clause 401

-

-

-

... More
(ii) For Grading II Material

893

-

-

... More
Wet Mix Macadam

-

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H Technical Specification Clause 406.

1339

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Sand Filling

498

-

-

... More
80 mm thick factory made c.c. interlocking paver block of M-40 Grade

-

-

-

... More
Providing and laying factory made chamfered edge Cement Concrete paver blocks of required strength, thickness & size/ shape, made by table vibratory method to attain superior smooth finish using PU or equivalent moulds, laid in required grey colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with fine sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic parking etc. all complete as per specifications & approval/ direction of the Engineer -in-Charge:

-

-

-

... More
a) 80 mm thick c.c. paver block of M-40 grade with approved colour, design and pattern.

8927

-

-

... More
Cast in Situ Cement Concrete M 25 Kerb.

-

-

-

... More
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete inposition to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-Charge (length of finished kerb edging shall be measured for payment). (Precast c.c. kerb stone shall be approved by Engineer-in- Charge).

164.68

-

-

... More
Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on precast M20 grade RCC vertical posts1.8 metres high (1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed 2 metres centre to, complete as per approved drawing.

25

-

-

... More
Retro-reflectorised Traffic Signs

-

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of high intensity grade shetting vide MoRT&H technical specification Clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and MoRT&H Technical Specification Clause 801.

-

-

-

... More
(i) with 900 mm equilateral triangle

6

-

-

... More
(ii) with 600 mm equilateral triangle

8

-

-

... More
(iv) with 800 x 600 mm rectangular

4

-

-

... More
(v) with 600 x 450 mm rectangular

6

-

-

... More
Direction and Place Identification Signs upto 0.9 sqm Size Board.

-

-

-

... More
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and MoRT&H Technical Specification Clause 801.

6

-

-

... More
Road marking strips (retro-reflective) of specified shade/ colour using Hot Applied Thermoplastic material with Reflectorising Glass Beads on Bituminous Surface

-

-

-

... More
Providing and applying 2.5 mm thick thick road marking strips (retro-reflective) of specified shade/ colour using hot thermoplastic material including reflectorising glass beads @ 250 gms per sqm area by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater including cost of cleaning the road surface of all dirt, seals, oil, grease and foreign material etc, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes as per MoRT&H Technical Specification Clause 803

-

-

-

... More
a) Lane/ Centre line/ Edge marking/ Transverse marking and any other marking

50

-

-

... More
Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering as per MoRD Technical Specification Clause 412.

6008

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
PCC M 15 Grade ( upto 5 m height )

331

-

-

... More
RCC M 30 Grade

-

-

-

... More
Upto 5 m height

-

-

-

... More
Case - I : Using Concrete Mixer

-

-

-

... More
Drain Raft 150 Thick

621

-

-

... More
Drain Both Side Wall 150 Thick

731

-

-

... More
Drain Roof Slab 150 Thick

281

-

-

... More
Catch Pit Raft 150 Thick

47

-

-

... More
Catch Pit Wall 150 thick

45

-

-

... More
Retaining Wall

107

-

-

... More
Box Culvert

109

-

-

... More
Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in substructure complete as per drawings & MoRT&H technical specification Clauses 1600, 2200.

153.6

-

-

... More
Brick masonry work in cement mortar in sub-structure complete excluding pointing & plastering, as per drawing & MoRT&H technical specification Clauses 1300, 2200.

-

-

-

... More
In 1:3 cement mortar

108

-

-

... More
Plastering with cement mortar 15 mm thick on brickwork in substructure as per MoRT&H technical specification Clauses 1300 & 2200

-

-

-

... More
In 1:3 cement mortar

9023

-

-

... More
Neat cement punning.

9023

-

-

... More
Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete : (DSR 2021, VOL - II, Page No- 470)

-

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Section Wise

361

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Length Wise

5410

-

-

... More
Providing and fixing MS angle ( 50 x 50 x 5 mm) to act as nosing with lugs of MS flat 10 x 5 mm, 100 mm long forked at end 60 cm apart ( minimum three lugs to be provided ) including necessary welding and applying a priming coat of approved primer on exposed surface etc. complete.

3298

-

-

... More
RCPC Grating 12 Ton Load Capacity

-

-

-

... More
For Drain

136

-

-

... More
For Catch Pit

142

-

-

... More
Pipe Laying And Others

-

-

-

... More
Providing, Laying, Jointing & field testing of high density Polyethyline pipes, (HDPE) conforming to IS 4984/14151/12786/13488 with necessary jointing material like mexchanical connector or jointing pipes heating to the ends of pipes with the help of telfon coated electric mirror/ heater to the required temprature and pressing the ends together against the each other, to form a manolithic & leak proof joint by thermosetting prosses. It may be required to be done with Jacks/Hydraulic Jacks/ but fusion machine. (50 mm and above fusion jointed & below 50 mm mechanical jointed) incl. hydraulic testing

-

-

-

... More
d) 160 mm Dia 10 kg/Sq.cm pipes

616.5

-

-

... More
Providing weep holes in brick masonry/ stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe or uPVC pipe (110 mm OD of 6.0 Kg/cm2 pressure) extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MoRT&H technical specification clauses 2706, 2200.

-

-

-

... More
One Side Weep Hole 110 Dia UPVC @ 1M C/C

528

-

-

... More
Cutting of Trees, including cutting of Trunks, Branches and removal of Stumps

-

-

-

... More
Cutting of Trees, including cutting of Trunks, Branches and removal of Stumps & roots, Refilling, Compaction of Backfilling and stacking of serviceable material by manual means with all lifts and lead upto 1000 m as per MORT&H Technical specification Clause 201

-

-

-

... More
Girth Above 300 mm to 600 mm

2

-

-

... More
Girth Above 600 mm to 900 mm

1

-

-

... More
Girth Above 900 mm to 1800 mm

1

-

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5.

649

-

-

... More
Turfing with Sods

-

-

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope , verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per MoRD Technical Specification Clause 309.

1623

-

-

... More
Providing labour at site supplied with all necessary hand tools inclusive of all cost overhead and profit margin etc.

-

-

-

25

-

-

... More
Labour/Mazdoor

25

-

-

... More
Mason (1st Class)

25

-

-

... More
Providing material including cost of material, carriage and its staking at site including all taxes, overhead and profits etc.

-

-

-

... More
Cement ordinary Portland or equivalent in bags

1

-

-

... More
High Yield Strength Deformed steel reinforcing bar up to 16mm dia to as per IS 432

0.2

-

-

... More
Providing clean well graded river or pit sand at site (Sand (Fine) : from local quarries)

10

-

-

... More
Providing hard cut stone boulders at site 15-30cm size

20

-

-

... More
Providing coarse aggregate of 20mm to 10mm size as per MoRT&H Specifications.

5

-

-

... More
Providing construction machine / equipment with drivers/ operators including fuel,lubricants,reapairs,maintennace, all taxes, overhead and profits etc.

-

-

-

... More
Tipper 5.5 cum/10 t

10

-

-

... More
Hire and running charge of Tractor with ripper attachment

10

-

-

... More
Hire charge of Hydraulic Excavator (3D) with driver and fuel

10

-

-

... More
Hire charge of Concrete mixer 0.25-0.40 cubic metre with hopper

10

-

-

... More
Hire and running charge of loader (Front end-loader)

10

-

-

... More
Dozer D80

10

-

-

... More
Grader

10

-

-

... More
Mohanpurr Town-Storm Water Drain Work

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation , grass, bushes, shrubs,saplings and trees of girth upto 300 mm , removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRD Technical Specification clause 201.

-

-

-

... More
By Manual Means

-

-

-

... More
In area of non-thorny jungle

0.59

-

-

... More
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.

-

-

-

... More
All kinds of soils.

8820

-

-

... More
Dismantling of Brick soling Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and upto a lead of 500 m by manual means as per MoRD Technical Specification Clause 202.

198

-

-

... More
Dismantling of flexible pavement and disposal of dismantled material up to a lead of 1000 meters, staking serviceable and unserviceable materials separately and as per leavent clauses of section-200.

-

-

-

... More
( I ) By Manual Means

-

-

-

... More
(A)Bituminous Road

74

-

-

... More
(B)Granular Road

30

-

-

... More
( II ) By Mechanical Means

-

-

-

... More
(A)Bituminous Courses

148

-

-

... More
Dismantling of Cement Concrete Pavements as per MoRT&H Technical Specification Clause 202 Dismantling of cement concrete pavements by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials with all lifts and upto a lead of 1000 m, stacking serviceable materials and unserviceable materials separately as per MoRT&H Technical Specification Clause 202. (B) upto partial depth of concrete

50

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, dewatering, construction of shoring, shuttering & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
I. Ordinary Soil

-

-

-

... More
I) Upto 3.0 m Depth

15382

-

-

... More
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead with all lifts but excluding compaction ground supporting embankment/ subgrade, replacement by suitable soil, which shall be paid separately as per MoRT&H Technical Specification clauses of section 300.

550

-

-

... More
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.

-

-

-

... More
Earth filling (For marshy soil)

6959

-

-

... More
Sand Filling

347

-

-

... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

2110

-

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil)

-

-

-

... More
Making up loss of material/ irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MoRD technical specification Clause 1903.

3694

-

-

... More
Maintenance of Earthen shoulder (Stripping of excess soil)

-

-

-

... More
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MoRD technical specification Clause 1903.

3694

-

-

... More
Single bamboo palasiding/walling of whole 2nd class bamboo (Jati or Bethua) 65 to 75 mm dia and closely packed & driven @ 150 mm c/c including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing bitumen drum sheet walling fixed with nails as per drawing and MoRD technical specification Clause 1302.5.

-

-

-

... More
B) Driven at least 900 mm below ground and 900 mm above ground on average

128

-

-

... More
Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)

2210

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
PCC M 15 Grade ( upto 5 m height )

629

-

-

... More
Plain/reinforced cement concrete in sub-structure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement)

-

-

-

... More
RCC M 30 Grade

-

-

-

... More
Upto 5 m height

-

-

-

... More
Case - I : Using Concrete Mixer

4431

-

-

... More
Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in substructure complete as per drawings & MoRT&H technical specification Clauses 1600, 2200.

370.29

-

-

... More
Brick masonry work in cement mortar in sub-structure complete excluding pointing & plastering, as per drawing & MoRT&H technical specification Clauses 1300, 2200.

-

-

-

... More
In 1:3 cement mortar

148

-

-

... More
Plastering with cement mortar 15 mm thick on brickwork in substructure as per MoRT&H technical specification Clauses 1300 & 2200

-

-

-

... More
In 1:3 cement mortar

3053

-

-

... More
Neat cement punning.

3053

-

-

... More
Providing and Placing in position suitable PVC water stops conforming to IS:12200 for construction/ expansion joints between two RCC members and fixed to the reinforcement with binding wire before pouring concrete etc. complete : (DSR 2021, VOL - II, Page No- 470)

-

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Section Wise

581

-

-

... More
Serrated with central bulb (225 mm wide, 8-11 mm thick) Length Wise

14778

-

-

... More
Providing weep holes in brick masonry/ stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe or uPVC pipe (110 mm OD of 6.0 Kg/cm2 pressure) extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MoRT&H technical specification clauses 2706, 2200.

-

-

-

... More
One Side Weep Hole 110 Dia UPVC @ 5M C/C

337

-

-

... More
Both Side Weep Hole 110 Dia UPVC @ 5M C/C

284

-

-

... More
Providing, lowering, laying in trenches, aligning, fixing in position and jointing socketed rubber gasket type ISI marked uPVC pipes of Class III (6 Kg/sqcm) with rubber ring joints (as per IS 4985-2000) of following outer dia with all accessories (excluding specials) complete including all material, labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. Note : E/w to be measured and paid separately.

-

-

-

... More
110 mm dia

160

-

-

... More
U-PVC coupler for UPVC drainage pipes 110/160 mm Dia

450

-

-

... More
Road Restoration Works

-

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H Technical Specification Clause 401. (iii) For Grading II Material

739

-

-

... More
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MoRT&H Technical Specification Clause 406.

924

-

-

... More
502 Prime Coat (iii) High porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.20- 1.50 kg/sqm using mechanical means as per MoRD Technical Specification Clause 502.

3694

-

-

... More
Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

148

-

-

... More
503 Tack Coat (iv) Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per MoRD Technical Specification Clause 503.

3694

-

-

... More
Bituminous Concrete Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 509 complete in all respects. A. Grading II i. With Viscosity Graded Bitumen of VG-30.

296

-

-

... More
508 20 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/ modified bitumen) Binder. Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508. Case - I : By Manual Means (I) Bitumen of VG-30

3694

-

-

... More
Cast in Situ Cement Concrete M 20 Kerb. Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawings & MoRT&H technical specifications Clauses 408.

-

-

-

... More
A. Using Concrete Mixer

7389

-

-

... More
Miscellaneous Works

-

-

-

... More
Dismantling of Fencing Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, backfilling of pit by manual means including disposal of dismantled material with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

16

-

-

... More
Removal of Telephone / Electric Poles and Lines Removal of telephone/ electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per MoRT&H Technical Specification Clause 202.

14

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
(I) By Manual Means

-

-

-

... More
B)Cement Concrete

250

-

-

... More
C)Reinforced Cement Concrete

135

-

-

... More
Demolishing brick work like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRT&H Technical Specification Clause 202.

-

-

-

... More
Dismantling brick / tile work

-

-

-

... More
In cement mortar.

170

-

-

... More
Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per MoRD Technical Specification Clause 202. Dismantling of existing Steel work, including T&P and scaffolding whenever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and upto a lead of 1000 m as per MoRD Technical Specification Clause 202.

-

-

-

... More
Including dismembering

750

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m excluding Earthwork and Dismantling of Masonry Works as per MoRD Technical Specification Clause 202 .

-

-

-

... More
Upto 600 mm dia Hume pipe

111

-

-

... More
Above 600 mm to 900 mm dia Hume pipe

185

-

-

... More
Dismantling old C.I. / D.I. pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes at site lead upto 50 metre as per CPWD specification and direction of the Engineer - in - charge.

-

-

-

... More
i.80 mm dia

47.25

-

-

... More
ii.100 mm dia

47.25

-

-

... More
iii.125 mm dia

47.25

-

-

... More
iv.150 mm dia

47.25

-

-

... More
v.200 mm dia

46.25

-

-

... More
vi.250mm dia

46.25

-

-

... More
vii.300mm dia

46.25

-

-

... More
viii.350mm dia

46.25

-

-

... More
ix.400mm dia

46.25

-

-

... More
x.450mm dia

45.25

-

-

... More
xi.500mm dia

45.25

-

-

... More
xii.600mm dia

45.25

-

-

... More
Charges for cutting C.I. pipe with steel saw by manual means as per CPWD specification and direction of the Engineer - in - charge.

-

-

-

... More
i.80 mm dia

20

-

-

... More
ii.100 mm dia

12

-

-

... More
iii.125 mm dia

10

-

-

... More
iv.150 mm dia

10

-

-

... More
Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A- 9/261) HP/ Hr. 77.00 13 (i) The

6000

-

-

... More
Circular shape 560 mm dia precast R.C.C. manhole cover with frame - E.H.D. - 35

384

-

-

... More
Proving and supplying and Fixing of RCPC Grating 12 Ton Load Capacity in Catch Pit- 600 x 600 x 600(H) all neccery civil works and equipment as per provided drawing and specefication all complete and direction of Engineer in In charge. (Including Loding Unloasding Transportation, Erection and GST )

429

-

-

... More
Supplying, fixing and installation of HDPE fabricated wall mounted Flap Gates of approved manufacturer, complete with anchor bolts and all other accessories complete as per specifications, drawings and direction of Engineer-In-Charge.

-

-

-

... More
1100 mm x 1100 mm

1

-

-

... More
600 mm x 800 mm

1

-

-

... More
Providing and anchoring polypropylene coated MS foot rests (weighing approximately 0.9 kg) for chamber/pit/sump/ walls etc. at levels and intervals as directed by engineer.

16

-

-

... More
Safety Arrangements

-

-

-

... More
Trench barricading for safety as per drawing and specification wherever directed by the Engineer. (Payment to be made as per running metre of trench) (Rates quoted shall envisage re-use of items as far as practicable).(Rate worked out considering 15 times usage)

7389

-

-

... More
Fixing red danger tape on bamboo poles in two rows on both sides of trench. (Payment to be made per running metre of trench. Rates quoted shall envisage re-use of items as far as practicable.).(Rate worked out considering 2 times usage for tape and 15 times usage for balli)

7389

-

-

... More
Fixing red danger tape on exposed & jutting out shoring in 2 rows on both sides of trench. (Payment to be made per running metre of trench. Rates quoted shall envisage re-use of items as far as practicable.).(Rate worked out considering 2 times usage for tape)

1847

-

-

... More
Survey Work

-

-

-

... More
Topographical survey Work using Total Station, preparation and finalization of survey drawings and CADD files, preparation of working drawing including Geotechnical work as directed by the Engineer in charge.

32

-

-

... More
Provisional Sum Amount for (Roads & Storm Water Drains--Khowai, Ranirbazar, Mohanpur) -Statutory payments to water resources, National Highways, State Highways, Indian Railways, Forest Department, archaeological Survey of India and similar organizations, Provision towards costs associated with social safeguards, Provision towards costs associated with environmental safeguards, Network expansions if required beyond the present scope, Nalla crossings, any dismantling work, shifting of utilities and miscellaneous works All arrangement for implementation of Environment Management Plan as identified in the Initial Environmental Examination (Refer: EE for Khowai, Ranirbazar, Mohanpur)Payment of the budget amount will be paid after completion of the project subject to satisfactory compliance EMPs Please quote Rs 5,10,83,707.00 ( Rupees Five Crore Ten Lakh Eighty Three Thousand Seven Hundred Seven only) in Rate Column

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.