Tripura Urban Planning And Development Authority Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.
Tripura Urban Planning And Development Authority Tender
Solid Waste Management
Eprocure
Opening Date10 Jan 2023
Closing Date6 Mar 2023
Tender Amount₹ 15,60,18,604
Costs
EMD
₹ 31,20,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Summary
In Situ Nallah Treatment Of Waste Water By Proven Technology Under Phytoremediation Bioremediation Method On Dbo Basis And Post Completion Operation And Maintenance For 05 Years Including Defects Liability Period Of 01 Year For Eight Towns In Total
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_TUDA_36481_1Bid Award Id
ViewTender No
05_EE_TUDA_2022_23Tender Authority
Tripura Urban Planning And Development Authority ViewPurchaser Address
-Website
http://tripuratenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
128
-
-
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
1000
-
-
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
4
-
-
Disinfection and solar panels
Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
4
-
-
Operation & Maintenance
O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer
I) 1st Year
1
-
-
ii) 2nd Year
1
-
-
iii) 3rd year
1
-
-
IV) 4th year
1
-
-
v) 5th year
1
-
-
For Panisagar Construction and repairing of Nalla Design and construction of RCC Drain for the required size ( minimum 1.0 m width and 1.20 m depth) for accommodating the Insitu Nalla treatment components in the drain including clearing of the site, demolishing the existing damaged drains including cost of RCC of mix M25 with centering and shuttering, earth work excavation, refilling the sides after construction, dewatering, removal of surplus earth etc and providing the Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates & Providing FRP sheets in gates as rectangular notch as specified and guided by Engineer-In- Engineer in 4 Nos of Drains.
130
-
-
Coirvel treatment units (CTUs) Providing, fabricating, installation of Coirvel treatment units in mild steel and providing epoxy anti rust and water proof coating to the framework with mesh in between frames, complete done under guidance of SINE IIT Bombay Company-EEPL on payment by the contractor with single unit having tentative rectangular mesh frame of dimensions of 1.0 m width, 0.5 m length, and 1.2 m depth and top and bottom framing plates of 0.5 m length and 1.0 m width, etc and plantation in CTU as complete in 4 Drains (DBO Item)
40
-
-
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
160
-
-
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
1300
-
-
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
5
-
-
Disinfection and solar panels
Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
5
-
-
Operation & Maintenance
O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer
I) 1st Year
1
-
-
ii) 2nd Year
1
-
-
iii) 3rd year
1
-
-
IV) 4th year
1
-
-
v) 5th year
1
-
-
For Sonamura Construction and repairing of Nalla Design and construction of RCC Drain for the required size ( minimum 1.0 m width and 1.20 m depth) for accommodating the Insitu Nalla treatment components in the drain including clearing of the site, demolishing the existing damaged drains including cost of RCC of mix M25 with centering and shuttering, earth work excavation, refilling the sides after construction, dewatering, removal of surplus earth etc and providing the Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates & Providing FRP sheets in gates as rectangular notch as specified and guided by Engineer-In- Engineer in 4 Nos of Drains.
172
-
-
Coirvel treatment units (CTUs) Providing, fabricating, installation of Coirvel treatment units in mild steel and providing epoxy anti rust and water proof coating to the framework with mesh in between frames, complete done under guidance of SINE IIT Bombay Company-EEPL on payment by the contractor with single unit having tentative rectangular mesh frame of dimensions of 1.0 m width, 0.5 m length, and 1.2 m depth and top and bottom framing plates of 0.5 m length and 1.0 m width, etc and plantation in CTU as complete in 4 Drains (DBO Item)
32
-
-
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
128
-
-
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
1100
-
-
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
4
-
-
Disinfection and solar panels
Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
4
-
-
Operation & Maintenance
O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer
I) 1st Year
1
-
-
ii) 2nd Year
1
-
-
iii) 3rd year
1
-
-
IV) 4th year
1
-
-
v) 5th year
1
-
-
For Santirbazar Construction and repairing of Nalla Design and construction of RCC Drain for the required size ( minimum 1.0 m width and 1.20 m depth) for accommodating the Insitu Nalla treatment components in the drain including clearing of the site, demolishing the existing damaged drains including cost of RCC of mix M25 with centering and shuttering, earth work excavation, refilling the sides after construction, dewatering, removal of surplus earth etc and providing the Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates & Providing FRP sheets in gates as rectangular notch as specified and guided by Engineer-In- Engineer in 4 Nos of Drains.
172
-
-
Coirvel treatment units (CTUs) Providing, fabricating, installation of Coirvel treatment units in mild steel and providing epoxy anti rust and water proof coating to the framework with mesh in between frames, complete done under guidance of SINE IIT Bombay Company-EEPL on payment by the contractor with single unit having tentative rectangular mesh frame of dimensions of 1.0 m width, 0.5 m length, and 1.2 m depth and top and bottom framing plates of 0.5 m length and 1.0 m width, etc and plantation in CTU as complete in 4 Drains (DBO Item)
32
-
-
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
128
-
-
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
1100
-
-
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
4
-
-
Disinfection and solar panels
Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
4
-
-
Operation & Maintenance
O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer
I) 1st Year
1
-
-
ii) 2nd Year
1
-
-
iii) 3rd year
1
-
-
IV) 4th year
1
-
-
v) 5th year
1
-
-
For Jirania Construction and repairing of Nalla Design and construction of RCC Drain for the required size ( minimum 1.0 m width and 1.20 m depth) for accommodating the Insitu Nalla treatment components in the drain including clearing of the site, demolishing the existing damaged drains including cost of RCC of mix M25 with centering and shuttering, earth work excavation, refilling the sides after construction, dewatering, removal of surplus earth etc and providing the Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates & Providing FRP sheets in gates as rectangular notch as specified and guided by Engineer-In- Engineer in 4 Nos of Drains.
172
-
-
Coirvel treatment units (CTUs) Providing, fabricating, installation of Coirvel treatment units in mild steel and providing epoxy anti rust and water proof coating to the framework with mesh in between frames, complete done under guidance of SINE IIT Bombay Company-EEPL on payment by the contractor with single unit having tentative rectangular mesh frame of dimensions of 1.0 m width, 0.5 m length, and 1.2 m depth and top and bottom framing plates of 0.5 m length and 1.0 m width, etc and plantation in CTU as complete in 4 Drains (DBO Item)
32
-
-
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
128
-
-
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
1100
-
-
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
4
-
-
Disinfection and solar panels
Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
4
-
-
Operation & Maintenance
O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer
I) 1st Year
1
-
-
ii) 2nd Year
1
-
-
iii) 3rd year
1
-
-
IV) 4th year
1
-
-
v) 5th year
1
-
-
For Amarpur Construction and repairing of Nalla Design and construction of RCC Drain for the required size ( minimum 1.0 m width and 1.20 m depth) for accommodating the Insitu Nalla treatment components in the drain including clearing of the site, demolishing the existing damaged drains including cost of RCC of mix M25 with centering and shuttering, earth work excavation, refilling the sides after construction, dewatering, removal of surplus earth etc and providing the Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates & Providing FRP sheets in gates as rectangular notch as specified and guided by Engineer-In- Engineer in 4 Nos of Drains.
172
-
-
Coirvel treatment units (CTUs) Providing, fabricating, installation of Coirvel treatment units in mild steel and providing epoxy anti rust and water proof coating to the framework with mesh in between frames, complete done under guidance of SINE IIT Bombay Company-EEPL on payment by the contractor with single unit having tentative rectangular mesh frame of dimensions of 1.0 m width, 0.5 m length, and 1.2 m depth and top and bottom framing plates of 0.5 m length and 1.0 m width, etc and plantation in CTU as complete in 4 Drains (DBO Item)
32
-
-
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
128
-
-
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
1100
-
-
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
4
-
-
Disinfection and solar panels
Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
4
-
-
Operation & Maintenance
O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer
I) 1st Year
1
-
-
ii) 2nd Year
1
-
-
iii) 3rd year
1
-
-
IV) 4th year
1
-
-
v) 5th year
1
-
-
For Kamalpur Construction and repairing of Nalla Design and construction of RCC Drain for the required size ( minimum 1.0 m width and 1.20 m depth) for accommodating the Insitu Nalla treatment components in the drain including clearing of the site, demolishing the existing damaged drains including cost of RCC of mix M25 with centering and shuttering, earth work excavation, refilling the sides after construction, dewatering, removal of surplus earth etc and providing the Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates & Providing FRP sheets in gates as rectangular notch as specified and guided by Engineer-In- Engineer in 4 Nos of Drains.
72
-
-
Coirvel treatment units (CTUs) Providing, fabricating, installation of Coirvel treatment units in mild steel and providing epoxy anti rust and water proof coating to the framework with mesh in between frames, complete done under guidance of SINE IIT Bombay Company-EEPL on payment by the contractor with single unit having tentative rectangular mesh frame of dimensions of 1.0 m width, 0.5 m length, and 1.2 m depth and top and bottom framing plates of 0.5 m length and 1.0 m width, etc and plantation in CTU as complete in 4 Drains (DBO Item)
32
-
-
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
128
-
-
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
1000
-
-
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
4
-
-
Disinfection and solar panels
Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
4
-
-
Operation & Maintenance
O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer
I) 1st Year
1
-
-
ii) 2nd Year
1
-
-
iii) 3rd year
1
-
-
IV) 4th year
1
-
-
v) 5th year
1
-
-
For Bishalgarh Construction and repairing of Nalla Design and construction of RCC Drain for the required size ( minimum 1.0 m width and 1.20 m depth) for accommodating the Insitu Nalla treatment components in the drain including clearing of the site, demolishing the existing damaged drains including cost of RCC of mix M25 with centering and shuttering, earth work excavation, refilling the sides after construction, dewatering, removal of surplus earth etc and providing the Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates & Providing FRP sheets in gates as rectangular notch as specified and guided by Engineer-In- Engineer in 4 Nos of Drains.
330
-
-
Coirvel treatment units (CTUs) Providing, fabricating, installation of Coirvel treatment units in mild steel and providing epoxy anti rust and water proof coating to the framework with mesh in between frames, complete done under guidance of SINE IIT Bombay Company-EEPL on payment by the contractor with single unit having tentative rectangular mesh frame of dimensions of 1.0 m width, 0.5 m length, and 1.2 m depth and top and bottom framing plates of 0.5 m length and 1.0 m width, etc and plantation in CTU as complete in 4 Drains (DBO Item)
80
-
-
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
320
-
-
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
2000
-
-
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
10
-
-
Disinfection and solar panels
Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
10
-
-
Operation & Maintenance
O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer
I) 1st Year
1
-
-
ii) 2nd Year
1
-
-
iii) 3rd year
1
-
-
IV) 4th year
1
-
-
v) 5th year
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements