Tripura State Electricity Corporation Limited Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.
Tripura State Electricity Corporation Limited - TSECL Tender
Civil And Construction
Eprocure
Opening Date5 Jan 2024
Closing Date5 Jan 2024
Tender Amount₹ 9,55,541
Costs
EMD
₹ 19,111Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_POWER_45114_1Bid Award Id
ViewTender No
NIT/DGM/ED-DMR/22-23/06Tender Authority
Tripura State Electricity Corporation Limited ViewPurchaser Address
-Website
http://tripuratenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Stay wire 7/2.5mm
70
-
-
Stay insulator(HT)
14
-
-
MS Channel 100X50X50X6 mm
310
-
-
MS Channel 75X40X40X6 mm
682
-
-
MS Angle 65X65X6 mm
50
-
-
MS Angle 50X50X6 mm
250
-
-
11 KV Polymer pin insulator
42
-
-
11 KV polymer disc insulator
30
-
-
11 KV Disc fittings
30
-
-
ACSR (6/1/2.59mm)
5.7
-
-
GI wire 8 SWG
248
-
-
11 KV GOS unit(3-phase)
1
-
-
11 KV DOF unit (3-phase)
1
-
-
11 KV polimeric L.A.(9 KV, 5KA)
3
-
-
200 Amp Cut out
6
-
-
LT 120sq.mm PVC cable
120
-
-
LT Shackle insulator
114
-
-
Straps with Nuts & Bolts
114
-
-
LT 4 sq.mm. PVC cable
368
-
-
Febricated MS clamp for X-arm
478
-
-
M.S. Nuts & Bolts i/c washer, ISI markedmachine made(assorted size)
408
-
-
Wooden plank 1X0.25X0.038 mtr, (Shal/koroi wood) for cut out
2
-
-
Aluminium Lugs (Assorted Size)
28
-
-
Supply of 60 kg salt & 55 kg charcoal (for 1 pit)
6
-
-
40 mm dia GI pipe 2.5 mtr long (Make:-TATA/JINDAL)
6
-
-
Stay Clamps of MS Flat (50X6mm)
14
-
-
B. Uprooting/Dismentling of the following :-
-
-
-
9mtr. Long pcc pole
53
-
-
9mtr. Long steel pole
19
-
-
Stay set complete
40
-
-
ACSR 6/1/2.59mm
16.4
-
-
8swg G.I.wire
5.4
-
-
11KV Pin Insulator
240
-
-
11KV Disc. Insulator set along with necessary fittings
168
-
-
11KV SP Top bracket (0.3 mtr. Long) by 75 channel
22
-
-
11KV SP Bottom bracket (1.3 mtr. Long) by 75 channel
82
-
-
11KV SP Guard bracket (1.7 mtr. Long) by 65 angle
42
-
-
11KV DP Top bracket (1.3 mtr. Long) by 75 channel
3
-
-
11KV DP Bottom bracket (1.7 mtr. Long) by 75 channel
39
-
-
11KV DP Guard bracket (2.2 mtr. Long) by 65 angle
15
-
-
11 KV protective guarding by 8 SWG GI wire
300
-
-
Sub-station Top Bracket (2.8 mtr of 100X50X50X6mm)
2
-
-
Sub-station GOS, DOF Bracket (2.8 mtr of 75X40X40X6mm)
8
-
-
Sub-station GOS Handle Bracket (2.8 mtr of 65X50X6mm)
2
-
-
Transformer base Bracket (2.8 mtr of 100X50X50X6mm)
2
-
-
Transformer base support Bracket (00.65 mtr of 100X50X50X6mm)
2
-
-
Dismentling of GOS set i/c necessary connections complete
2
-
-
Dismentling of DOF set i/c necessary connections complete
2
-
-
Dismentling of 315 KVA Transformer from a pole with necessary connections of all allied items.
1
-
-
Dismentling of 63 KVA Transformer from a pole with necessary connections of all allied items.
1
-
-
Dismentling of L.A. i/c necessary connections
6
-
-
4 wire LT X-arm( 1.1 mtr. Long)
68
-
-
Guard X-arm( 1.4 mtr. Long)
68
-
-
Shackle insulator
340
-
-
Cradle Guard LT
150
-
-
C. Erection of the following
-
-
-
Erection of 9.00 mtrs length of PCC pole at any kind of soil upto a depth of 1/6th of pole height , i/c excavation of earth , refilling the pit with soil upto the ground level, ramming and making complete in all respect .
53
-
-
9mtr. Long steel pole ( Dismantled pole)
19
-
-
Erection of stay set direct in earth complete with 19mm X 1800mm long stay rod , anchor plate of size 300X300x8 mm , thimble, turn buckle, 7/2.5mm dia GI stranded stay wire and stay insulator etc.with supply of MS clamp, nuts & bolts etc as required and making complete in all respect .
40
-
-
Sub-station Top Bracket (2.8 mtr of 100X50X50X6mm)
2
-
-
Sub-station GOS, DOF Bracket (2.8 mtr of 75X40X40X6mm)
8
-
-
Sub-station GOS Handle Bracket (2.8 mtr of 65X50X6mm)
2
-
-
Transformer base Bracket (2.8 mtr of 100X50X50X6mm)
4
-
-
Transformer base support Bracket (00.65 mtr of 100X50X50X6mm)
4
-
-
Dismentling of GOS set i/c necessary connections complete
3
-
-
Dismentling of DOF set i/c necessary connections complete
3
-
-
11KV SP Top bracket (0.3 mtr. Long) by 75 channel
22
-
-
11KV SP Bottom bracket (1.3 mtr. Long) by 75 channel
82
-
-
11KV SP Guard bracket (1.7 mtr. Long) by 65 angle
42
-
-
11KV DP Top bracket (1.3 mtr. Long) by 75 channel
3
-
-
11KV DP Bottom bracket (1.7 mtr. Long) by 75 channel
39
-
-
11KV DP Guard bracket (2.2 mtr. Long) by 65 angle
15
-
-
11KV Pin Insulator
240
-
-
11KV Disc. Insulator set along with necessary fittings
168
-
-
Installation / positioning of 11/0.430 KV , 3-phase 315 KVA of distribution transformer on pole with necessary connection and fitting fixing of all allied assessories components as required for making complete in all respect for energizing . (TSECL SUPPLY)
1
-
-
Installation / positioning of 11/0.430 KV , 3-phase 63 KVA of distribution transformer on pole with necessary connection and fitting fixing of all allied assessories components as required for making complete in all respect for energizing . (TSECL SUPPLY)
1
-
-
Errection of L.A. i/c necessary connections
6
-
-
ACSR 6/1/2.59mm
16.4
-
-
Laying & Stringing of 8swg G.I.wire
5.4
-
-
11 KV protective guarding by 8 SWG GI wire
300
-
-
Earthing with GI pipe 2.5 mtr. Long and 40 mm dia i/c excavation , refilling with alternate layer of salt and charcoal as per drawing
6
-
-
Strain screw
2
-
-
4 wire LT X-arm( 1.1 mtr. Long)
68
-
-
Guard X-arm( 1.4 mtr. Long)
68
-
-
Shackle insulator
340
-
-
Cradle Guard LT
150
-
-
Transformer RCC base for 315 KVA Transformer
1
-
-
D. Providing protective Sub-Station fencing of approve quality as per technical specification i/c supply of all materials.
2
-
-
E. Height extension by 2.5 mtr 75X40X40x6 mm channel
10
-
-
F. Providing Service Connection
-
-
-
Dismentling & Re-erection of 3 phase service connection with laying PVC cable from nearby electrical pole to premises upto 35 mtr. In length supported by GI wire, reel insulator i/c fitting fixing of energy meter as required.
17
-
-
Dismentling & Re-erection of 1 phase service connection with laying PVC cable from nearby electrical pole to premises upto 35 mtr. In length supported by GI wire, reel insulator i/c fitting fixing of energy meter as required.
148
-
-
G. Febrication of MS Channel/angle
1292
-
-
H. Carriage of 9.0mtr. Length of PCC poles by Mechanical Transport from the factory / Sub-divisional store to working site Vis-à-vis i/c. loading, unloading and stacking as required :-
-
-
-
a) For maximum 04(four) pole
4
-
-
b) Beyond 04(four) poles
15
-
-
I. Carriage of 11/0.430, 3 phase 63 KVA Transformer by Mechanical Transport from the Sub-Divisional store yard to working site i/c. loading, unloading and placing on base, as required :-
-
-
-
a) Upto the lead range 25km
1
-
-
J. Carriage of 11/0.430, 3 phase 315 KVA Transformer by Mechanical Transport from the Sub-Divisional store yard to working site i/c. loading, unloading and placing on base, as required :-
-
-
-
a) Upto the lead range 25km
1
-
-
K. Carriage of line Materials
1.5
-
-
L. Jungle cutting
0.5
-
-
M. Numbering of errected poles & DT by Black japan paint on yellow background
25
-
-
N. Re-Stringing of conductors
-
-
-
ACSR (6/1/2.59mm)
5.6
-
-
GI wire 8 SWG
1.4
-
-
O. Grouting of 19 nos. 9mtr steel tubular pole of ratio 1:2:4(1cement: 2 river send: 4 jhama brick aggregate) of 20mm normal size i/c. Supply of cement,send & jhama brick aggregate complect excavation,refilling & ramming of cach alongwith centering & shuttaring ang clamping.(per pole= 0.392cum)
7.45
-
-