Tripura State Electricity Corporation Limited Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.
Costs
EMD
₹ 1,42,835Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_POWER_47975_1Bid Award Id
ViewTender No
DGM/AMB/2023-24/19 dt 29/02/2024Tender Authority
Tripura State Electricity Corporation Limited ViewPurchaser Address
-Website
http://tripuratenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Supply erection testing commissioning of HT LT line installation of 19x63KVA SS for SC to DTW JJM scheme at different location under ED Ambassa
Supply erection testing commissioning of HT LT line installation of 19x63KVA SS for SC to DTW JJM scheme at different location under ED Ambassa
Supply erection testing commissioning of HT LT line installation of 19x63KVA SS for SC to DTW JJM scheme at different location under ED Ambassa
BOQ Items
Supply of materials (OH lines)for for extension of extension of LT line using L T Areal Bunched Cable for providing thee phase service connection to DTW Schemes under Jal Jeevan Scheme within jurisdiction of ED-Ambassa .
1.2
-
-
Supply of materials for providing of three phase service connection to un-electrified PVTG households under Ganganagar RD Block within jurisdiction of ED-Ambassa.(Meter will be supplied by TSECL)
24
-
-
Erection :
-
-
-
Erection and carrying of materials (OH lines) for extension of HT line using steel tubular pole and PCC pole for providing single phase service connection toun-electrified PVTG households under Ganganagar RD Block within jurisdiction of ED-Ambassa.
5.5
-
-
Erection and Carrying of materials (OH lines) for constructing DTR sub-station line using Steel tubular pole for for providing thee phase service connection to DTW Schemes under Jal Jeevan Scheme within jurisdiction of ED-Ambassa
19
-
-
Erection and Carrying of materials (OH lines) for extension of LT line using L T Areal Bunched Cable for providing single phase service connection to un-electrified PVTG households under Ganganagar RD Block within jurisdiction of ED-Ambassa.
1.2
-
-
Erection and Carrying of materials for for providing thee phase service connection to DTW Schemes under Jal Jeevan Scheme within jurisdiction of ED-Ambassa
24
-
-
Other Works:
-
-
-
Providing Sub-station Fenching of area 4.5Mx3.5M with 13 no. 2.3 mtr. Long 35x35x5 mm Angle posts 1 mtr. Apart and having grouting of volume 0.03125 cum (0.5mx0.25x0.25m ratio 1:2:4, 1 cement:2 river sand: 4 stone/brick chips) with gate size 1.5 mtr. X 1.6 mtr. i/c Angle post grouting.
19
-
-
Hiring of additional vehicle for Site inspection , survey, supervision of works etc.
19
-
-
Carriage of 11/0.433 ,3-Phase Distribution Transformer by Mechanical Transport , Manual , handcart etc as required from Sub-Division yard to worksite Vis-à-vis including loading, unloading & stacking as required:- Beyond 50 KM upto the lead of 150 KM
5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements