Tripura State Electricity Corporation Limited Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.
Costs
EMD
₹ 3,51,293Document Cost
₹ 15,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_POWER_49044_1Bid Award Id
ViewTender No
DGM/ED/UDP/2024-25/01Tender Authority
Tripura State Electricity Corporation Limited ViewPurchaser Address
-Website
http://tripuratenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply of MS Stay set complete
488
-
-
Supply of Galvanized Stranded stay wire (7/2.5mm)
1952
-
-
Supply of Stay Insulator 11KV (Porcelin)
91
-
-
Supply of Stay Insulator LT (Porcelin)
397
-
-
Supply of MS Channel (100x50x50x6mm)
1012
-
-
Supply of MS Channel (75x40x40x6mm)
2424
-
-
Supply of MS Angle (65x65x6mm)
1458
-
-
Supply of MS Nuts & Bolts (16X75mm)
275
-
-
Supply of MS Nuts & Bolts (16X90mm)
100
-
-
Supply of febricated bracket clamps of assorted size of MS flat (50 x 6 mm) with double coat of red oxide primer coating .
825
-
-
Supply of 11 KV Polimer composite Pin Insulator
365
-
-
Supply of 11 KV polimer composite Disc Insulator 45KN
205
-
-
Supply of 11 KV Disc Fittings (6/1/2.59)
205
-
-
Supply of ACSR(6/1/2.59 sq.mm) Weasel
22.8
-
-
Supply of LT AB Cable 3x35+1x16+1x25 sqmm
8
-
-
Supply of LT AB Cable 1x25+1x16+1x25 sqmm
18.42
-
-
Supply of Suspension clamp Assembly with straps & buckle (25-70mm) for LT AB Cable
480
-
-
Supply of Dead end clamp Assembly with straps & buckle (25-50mm) for LT AB Cable
150
-
-
Supply of Distribution box 3 Phase (35 mm) for LT AB Cable
50
-
-
Supply of Distribution box 1 Phase (25 mm) for LT AB Cable
90
-
-
Supply of Eye hook (25mm) for LT AB Cable
634
-
-
Supply of Insulation Piercing Connector for LT AB Cable
200
-
-
Supply of Supply of Pole clamp (25 / 50) for fixing EYE hook for LT AB Cable
1268
-
-
Supply of 8 SWG GI wire (4mm)
1758
-
-
Supply of 10 SWG GI wire (3.15mm)
1508
-
-
Supply of 11KV GO Switch 3-phase (Porcelin type)
15
-
-
Supply of 11KV DO fuse 3-phase (Porcelin type)
15
-
-
Supply of 11KV Polymeric LA (9KV 5 KA)
33
-
-
Supply of Re-wireable porcelin Cut out 100Amps.
33
-
-
Supply of Lug 70sqmm Aluminium
110
-
-
Supply of 2.5mtr. Long , 40mm dia G.I.Pipe ( Make: TATA/ JINDAL)
41
-
-
Supply of Supply of 60Kg Salt & 55Kg Charcoal ( For 1 Pit).
41
-
-
Supply of Polythene pipe 1/2" dia
123
-
-
Supply of PVC Cable 70 sq.mm.(1100Volt)
0.33
-
-
Supply of PVC Cable 2.5 sq.mm.(1100Volt)
24.5
-
-
Supply of porcelin Reel insulator (4mm)
7000
-
-
Erection & commissioning including carriage upto work site of 9.0 Mtr long Steel Tubular Pole direct in earth i/c excavation, back filling & ramming etc as reqd.(the Pole should be buried 1/6th.of their length) as per Technical specification.
137
-
-
Erection & commissioning including carriage upto work site of 8.0 Mtr long Steel Tubular Pole direct in earth i/c excavation, back filling & ramming etc as reqd.(the Pole should be buried 1/6th.of their length) as per Technical specification.
509
-
-
Erection & commissioning including carriage upto work site of 9.0 Mtr long PCC Pole direct in earth i/c excavation, back filling & ramming etc as reqd.(the Pole should be buried 1/6th.of their length) as per Technical specification.
30
-
-
Erection & commissioning including carriage upto work site of 8.0 Mtr long PCC Pole direct in earth i/c excavation, back filling & ramming etc as reqd.(the Pole should be buried 1/6th.of their length) as per Technical specification.
125
-
-
Carriage of 9.00 Mtr. long Steel Tubular Pole by Mechanical Transport from Bodhjun Nagar Store, Agartala to different working site including loading, unloading and stacking as requiruired.
137
-
-
Carriage of materials (upto working site) such as Cable,AAC, AAAC, ACSR, G.I.Wire, Cross-Arm,Stay Set,Insulators etc., by Mechanical Transport from the Electrical Sub-Divisional Site Store to working site Vis-a-vis, including loading, unloading and stacking as required, upto the lead of 25KM & 50KM.
60
-
-
Carriage of 11/0.430, 3-Phase 25KVA Transformer -11 nos. & 1-Phase energy meter-350nos. by Mechanical Transport from AD Nagar Store sub-division, Agartala to working site Vis-a-vis including loading, unloading and placing on base, as required,
11
-
-
Erection & commissioning of Stay set direct in earth complete with 19mm x 1800 mm long stay rod, anchor plate of size 300 x 300 x 8 mm ,thimble, turn buckle, 7/3.15 mm dia G.I Standed stay wire and stain insulator etc. with Supply of M.S.Clamp,Nuts & Bolts etc. as required. and making complete in all respect.
488
-
-
Erection of fabricated M.S.Channel Cross-Arm, 2.8Mtr Long 75 x40 x 40 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts)
44
-
-
Erection of M.S.Channel Cross-Arm, 0.8Mtr. Long100 x50 x 50 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts)
22
-
-
Erection of fabricated M.S.Channel Cross-Arm, 2.8Mtr. Long100 x50 x 50 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts)
33
-
-
Erection of fabricated M.S.Angle Cross-Arm, 2.8 Mtr. Long 65 x65 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts)
11
-
-
Erection of fabricated M.S.Channel Cross-Arm, 2.2Mtr. Long 75 x40 x 40 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts)
44
-
-
Erection of fabricated M.S.Channel Cross-Arm, 1.2Mtr. Long 75 x40 x 40 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts)
91
-
-
Erection of fabricated M.S.Channel Cross-Arm,0.3 Mtr. Long75 x40 x 40 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts)
91
-
-
Erection of fabricated M.S.Angle Cross-Arm,2.5 Mtr. Long 65 x65 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts)
30
-
-
Erection of fabricated M.S.Angle Cross-Arm, 1.6 Mtr. Long 65 x65 x 6 mm( Excluding the cost of Back Clamp, Nuts & Bolts)
91
-
-
Erection & commissioning of 11KV Pin insulator along with Pin.
365
-
-
Erection & commissioning of 11KV Single Disc insulator set along with necessary fittings.
205
-
-
Laying, Stringing & commissioning of 1KM (Single Conductor) ACSR 6/1/2.59 mm dia 'weasel' including hoisting & binding etc. Complete as required.
22.8
-
-
Positioning of cable drum, removing of cable from drum and Laying, hoisting & drawing of AB Cable 3X35+1x16+1x25 sqmm of 1.1 KV grade as per direction of Engineering In-Charge.
8
-
-
Positioning of cable drum, removing of cable from drum and Laying, hoisting & drawing of AB Cable 1X25+1x16+1x25 sqmm of 1.1 KV grade as per direction of Engineering In-Charge.
18.42
-
-
Erection & Fitting-Fixing of Insulated suspention Clamp including Pole clamp, Eye hook for cable massenger of 1.1 KV grade on PCC/Steel Pole with the help Pole brackets or Steel Straps &buckles as per direction of Engineering In-Charge.
480
-
-
Erection & Fitting-Fixing of Insulated Dead end enchoring Clamp including Pole clamp, Eye hook for cable massenger of 1.1 KV grade on PCC/Steel Pole with the help Pole brackets or Steel Straps & buckles asper direction of Engineering In-Charge.
150
-
-
Erection, Fitting-Fixing of Service main 1/3Phase distribution Box of 1.1 KV grade on PCC/Steel Pole with the help Pole brackets or Steel Straps &buckles asper direction of Engineering In-Charge.
140
-
-
Erection & Fitting-Fixing of Insulation Piercing Connectors(IPC) all sizes of 1.1 KV grade including connection from main cable to Distribution box, Tee-Off line asper direction of Engineering In-Charge.
200
-
-
Laying & strining of 1KM (Single Conductor), 8SWG GI wire including hoisting & binding etc. Complete as required.
15.2
-
-
Erection of 11KV protective Guarding by GI wire 8 SWG as per technical specification,across road/River/Telecom line etc. in horizonta formation complete .
486
-
-
Erection of 11KV 200 Amp. GOS unit set of three nos. including necessary connection complete as per technical specification. (Excluding the cost of back clamp,Nuts & Bolts)
15
-
-
Erection of 11KV DOF unit set of three nos. including necessary connection complete as per technical specification.(Excluding the cost of back clamp,Nuts & Bolts)
15
-
-
Installation/Positioning of 11/0.430KV,3-Phase 25KVA Distribution Transformer on Pole with necessary connections & fitting fixing of all allied accessories components as required for making complete in all respect for energizing.
11
-
-
Erection of 9 KV, 5KA Gapless Silicon Polymeric Lightning Arrestors conform to IEC 60099-4 /IS-3070 Part-3 - 1993 with latest amendments
33
-
-
Earthing with G.I pipe 2.5mtr. Long and 40mm dia, including excavation, refilling with alternate layer of salt & Charcoal as per drawing (excluding supply of G.I.Pipe, Salt & Charcoal, Gi wire, nuts &bolts, etc. as required)
41
-
-
Febrication of different sizes Cross-Arms by MS Channel/MS Angle as per specification
4894
-
-
Maintaining adequate clearance from overhead live conductors by Trimming of tree branches for Way Leaves .
27
-
-
Providing single Phase Service Connection with laying PVC cable (2.5 sqmm) from nearby Electrical pole to Premises upto 35mtr. in length supported by G.I.Wire,Reel Insulator i/c fitting fixing of Energy Meter & wooden meter board as required .(excluding cost of PVC cable, Reel insulator, single phase energy meter & meter board)
350
-
-
INTERNAL HOUSE WIRING Supply & erection of 1- Phase Main Switch 16Amp (ISI Marked)
350
-
-
Providing earthing with 40mm dia coil of G I wire of spiral length 450mm of outer dia 50mm closely wound about 115 turns i/c excavation ,refilling with alternate layer of salt & charcoal I/c supply of salt & charcoal etc.as required (excluding cost of 10 SWG GI wire)
350
-
-
Supply of Wooden Plank (1.5'x1''x8') for fixing meter board
350
-
-
Supply & erection of 9W LED Bulb, Bajaj/Havells/Crompton
350
-
-
Supply & erection of Angle Holder (ISI Marked)
350
-
-
Supply & erection of 4''x4'' wooden switch Board
350
-
-
Supply & erection of Piono Switch 5Amp (ISI Marked)
350
-
-
Wiring for Circuit / Sub-main including Supply of 1-Core copper cable of size 1.5 sqmm
1050
-
-
Supply & erection of Galvanized threaded screw (per connection 20nos. Screw)
7000
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements