Tripura State Electricity Corporation Limited Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.

Tripura State Electricity Corporation Limited - TSECL Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date7 Sep 2022
Closing Date21 Oct 2022
Tender Amount₹ 37,04,59,708 
Notes
Download

Costs

Summary

Work Of Distribution Infra At Khowai District Under Rdss Scheme

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
8 M long Steel Tubular poles with welded steel base plate of Designation 540 SP 15 (IS 2713, Pt I, II, III 1980) galvanized.

3570

-

-

... More
PCC Pole (8 mtr/140Kg )

2

-

-

... More
LT AB Cable 3x50 +1x16+1x35 sq.mm (As per IS 7098 (Part-II) 1985 ,IS 8130 1984, IS 5831 1984, IS 3975 1988 , IS 398 Part-IV 1979)

561

-

-

... More
Galvanised Stay Set with anchor plate (200x200x6mm), 50x8mm stay clamp, nut bolts, 2 Nos. turn buckles, 1.8 m long, 16 mm diameter solid GS Stay rod etc. as required as per technical specification, approved drawings and scope of work.

2040

-

-

... More
Guy Insulator

2040

-

-

... More
Stay Wire (7/4 mm, 8 SWG) (4 Nos)

10200

-

-

... More
Suspension clamp Assembly with straps & buckles (50 Sq. mm)

3060

-

-

... More
Dead End Clamp assembly with straps & Buckles ( 35-50)Sq. mm

2040

-

-

... More
Anchor Clamp

4080

-

-

... More
IPC Main 16-95 and Tap 4-50 sq mm

51000

-

-

... More
Pole Clamp

12750

-

-

... More
Eye Hook

12750

-

-

... More
Distribution Box 3 Phase 25-50 Sq. mm (Type A- Single Phase/Type B- Three Phase)

7140

-

-

... More
Stay Clamp of Ms Flat (50x6mm)

9180

-

-

... More
Nuts & Bolts with washers (assorted)

3672

-

-

... More
Engineering, drawing & supply of 3-ph 35 Sq. mm AB Cable (8 mtr GI Pole) in replacement work Along with accessories As per IS standard , Approved Technical Specification & drawings.

-

-

-

... More
8 M long Steel Tubular poles with welded steel base plate of Designation 540 SP 15 (IS 2713, Pt I, II, III 1980) galvanized.

1806

-

-

... More
PCC Pole (8 mtr/140Kg)

2

-

-

... More
LT AB Cable 3x35 +1x16+1x25 Sq. Mm (As per IS 7098 (Part-II) 1985 ,IS 8130 1984, IS 5831 1984, IS 3975 1988 , IS 398 Part-IV 1979)

283.8

-

-

... More
Galvanised Stay Set with anchor plate (200x200x6mm), 50x8mm stay clamp, nut bolts, 2 Nos turn buckles, 1.8 m long, 16 mm diameter solid GS Stay rod etc. as required as per technical specification, approved drawings and scope of work.

1032

-

-

... More
Guy Insulator

1032

-

-

... More
Stay Wire (7/4 mm/8 SWG) (4 Nos)

6192

-

-

... More
Suspension clamp Assembly with straps & buckle (50 Sq. mm)

1548

-

-

... More
Dead End Clamp assembly with straps & Buckles ( 35-50) Sq. mm

1032

-

-

... More
Anchor Clamp

2064

-

-

... More
IPC Main 16-95 and Tap 4-35 sq mm

25800

-

-

... More
Pole Clamp

6450

-

-

... More
Eye Hook

6450

-

-

... More
Distribution Box 3 Phase 25-35 Sq. mm (Type A- Single Phase/Type B- Three Phase)

3612

-

-

... More
Stay Clamp of Ms Flat (50x6mm)

4644

-

-

... More
Nut & Bolts with washers (assorted)

1858

-

-

... More
Engineering, drawing & supply of 1-ph 25 Sq. mm AB Cable (8 mtr GI Pole) in replacement work Along with accessories As per IS standard , Approved Technical Specification & drawings.

-

-

-

... More
8 M long Steel Tubular poles with welded steel base plate of Designation 540 SP 15 (IS 2713, Pt I, II, III 1980) galvanized.

602

-

-

... More
PCC Pole (8 mtr/140 Kg)

1

-

-

... More
LT AB Cable 1X25 +1x16+1x25 (As per IS 7098 (Part-II) 1985 ,IS 8130 1984, IS 5831 1984, IS 3975 1988 , IS 398 Part-IV 1979)

94.6

-

-

... More
Galvanised Stay Set with anchor plate (200x200x6mm), 50x8mm stay clamp, nut bolts, 2 Nos turn buckles, 1.8 m long, 16 mm diameter solid GS Stay rod etc as required as per technical specification, approved drawings and scope of work.

430

-

-

... More
Guy Insulator

430

-

-

... More
Stay Wire (7/4 mm, 8 SWG) (4 Nos)

1548

-

-

... More
Suspension clamp Assembly with straps & buckle (25-50 Sq.mm)

1720

-

-

... More
Dead End Clamp assembly with straps & Buckles ( 25-50Sq. mm)

430

-

-

... More
Anchor Clamp

688

-

-

... More
IPC Main 16-95 and Tap 4-35 sq mm

8600

-

-

... More
Pole Clamp

2150

-

-

... More
Eye Hook

2150

-

-

... More
Distribution Box 1 Phase 25-35 sq. mm TypeA-Single phase, TypeB-Three Phase

1118

-

-

... More
Stay Clamp of Ms Flat (50x6mm)

1548

-

-

... More
Nut & Bolts with washers (assorted)

619

-

-

... More
HVDS Works

-

-

-

... More
Engineering, drawing & supply of 11KV line using ACSR (weasel) on 9 mtr Long GI Pole supports with Span of 50 Meters (Avg.) having cross bracing in each Double pole as per TS & approved Drawing. (in HVDS Work)

-

-

-

... More
9 M long Steel Tubular poles with welded steel base plate of Designation 540 SP 28 (IS 2713, Pt I, II, III 1980) As per approved drawing.

968

-

-

... More
PCC Pole (9 mtr/180Kg)

5

-

-

... More
M.S Angle (65x65x6mm) (Length 2.5 m)

17600

-

-

... More
M.S Channel (75x40x6)mm (Length 1.5 m)

10771

-

-

... More
Galvanised Stay Set with anchor plate (200x200x6mm), 50x8mm stay clamp, nut bolts, 2 Nos turn buckles, 1.8 m long, 16 mm diameter solid GS Stay rod etc as required as per technical specification, approved drawings and scope of work.

880

-

-

... More
GI Stranded Stay wire 7/3.15 mm dia

3300

-

-

... More
Stay insulator (HT)

660

-

-

... More
11 KV polymer Disc insulator

1188

-

-

... More
11 KV Disc Fittings

1188

-

-

... More
11 KV polymer Pin insulator

2508

-

-

... More
A.C.S.R 6/2.59+1/2.59 mm 30 Sq. mm Al (Weasel) (Considering 3% sag)

136.4

-

-

... More
G.I Wire ( 8 SWG )

10472

-

-

... More
Nut & Bolts with washers (assorted)

2112

-

-

... More
Stay Clamps of Ms Flat (50x6mm)

880

-

-

... More
Bracket Clamps of Ms Flat (50x6mm)

4444

-

-

... More
Engineering, drawing & supply of 11KV line using ACSR (Rabbit) on 9 mtr Long GI Pole supports with Span of 50 Meters (Avg.) having cross bracing in each Double pole as per TS & Approved Drawing. (In HVDS work)

-

-

-

... More
9 M long Steel Tubular poles with welded steel base plate of Designation 540 SP 28 (IS 2713, Pt I, II, III 1980) As per approved drawing.

924

-

-

... More
M.S Angle (65x65x6mm) (Length 2.5 m)

13440

-

-

... More
M.S Channel (75x40x6)mm (Length 1.5 m)

9660

-

-

... More
Galvanised Stay Set with anchor plate (200x200x6mm), 50x8mm stay clamp, nut bolts, 2 Nos turn buckles, 1.8 m long, 16 mm diameter solid GS Stay rod etc as required as per technical specification, approved drawings and scope of work.

630

-

-

... More
GI Stranded Stay wire 7/3.15 mm dia

3066

-

-

... More
Stay insulator (HT)

630

-

-

... More
11 KV polymer Disc insulator

924

-

-

... More
11 KV Disc Fittings

924

-

-

... More
11 KV polymer Pin insulator

2310

-

-

... More
A.C.S.R 6/3.35 + 1/3.35 mm 50 Sq.mm Al (Rabbit)

130.2

-

-

... More
G.I Wire ( 8 SWG )

9996

-

-

... More
Nut & Bolts with washers (assorted)

2016

-

-

... More
Stay Clamps of Ms Flat (50x6mm)

630

-

-

... More
Bracket Clamps of Ms Flat (50x6mm)

4116

-

-

... More
Engineering, drawing & supply of new 11/0.4 KV, outdoor type, oil immersed 25 KVA Distribution Transformer Substations with all accessories as per scope of work, approved drawings and technical specifications: (HVDS Work)

-

-

-

... More
9 M long Steel Tubular poles with welded steel base plate of Designation 540 SP 32 (IS 2713, Pt I, II, III 1980). as per Technical Specification, approved Drawing & Scope of works

128

-

-

... More
50 sqmm single core XLPE Aluminium Conductor, Stranded, unarmoured cable. as per Technical Specification, approved Drawing & Scope of works.

5120

-

-

... More
70 sqmm single core XLPE Aluminium Conductor, Stranded, unarmoured cable. as per Technical Specification, approved Drawing & Scope of works.

2560

-

-

... More
P G clamp for 30/50 sq.mm AS per IS 8309

384

-

-

... More
11 KV pin Insulator ( Polymer) with GI Pin and Hardware fittings. as per scope of work. as per Technical Specification, approved Drawing & Scope of works

192

-

-

... More
11 KV disc Insulator (Polymer) 45 KN with Strain H/W Fitting. as per scope of work. as per Technical Specification, approved Drawing & Scope of works

192

-

-

... More
11 KV, 600 A, 3-pole Horizontal/Vertical Mounting type, Gang Operated, AB Switch along with Support Insulators, Base Channel, down Pipe, Arcing Horns etc. AB Switch for Distribution Transformer Substation.as per Technical Specification, approved Drawing & Scope of works

64

-

-

... More
11 KV Lightening Arrestor S/stn.Type Heavy Duty 9 KV, 10 KA Distribution Class Lightening Arrester for DT.as per technical specification, approved drawings and scope of work.

64

-

-

... More
11/0.433 KV outdoor type, oil immersed, Distribution Transformer 25 KVA, 3 phase Aluminium wound DTR. Stack type CRGO Core fitted. as per IS 2026 IS1180 (Part-1): 2014 and its amendments 1, 2, 3 and 4, CRGO/Amorphous core, Energy Efficiency Level 1, carrying Bureau of Indian Standard Certificate mark with all accessories as per scope of work, approved drawings and specifications.

64

-

-

... More
Clamp (50 x 6 mm Flat) for Top Channel [GALVANIZED]

256

-

-

... More
Clamp (50 x 6 mm) for AB switch base channel [GALVANIZED]

256

-

-

... More
Stay clamp side/angle (50 x 10 mm)

256

-

-

... More
MS Channel (100x50x6 mm) for 11 KV AB switch [GALVANIZED]

128

-

-

... More
11KV Top Channel (100x50x6) 9.56 kg per meter [GALVANIZED]

192

-

-

... More
MS Angle for L T distribution bus (35 x 35 x6 mm) [GALVANIZED]

64

-

-

... More
Transformer Base Channel (100x50x6 mm) [GALVANIZED]

128

-

-

... More
MS Channel (75x40x6 mm)for supporting H.G fuse & L.A [GALVANIZED]

128

-

-

... More
Transformer belting (50x50x6 mm) & belting support (40x40x6 mm)[GALVANIZED] (L=2.5m)

128

-

-

... More
Clamp (50 x 6 mm) for Transformer base channel [GALVANIZED]

384

-

-

... More
Clamp (50 x 6 mm) for Transformer belting [ GALVANIZED]

256

-

-

... More
Clamp (50 x 6 mm) for LT bus & H.G fuse set [ GALVANIZED]

256

-

-

... More
Male female contact of 11 KV AB Switch 600 Amp

64

-

-

... More
Complete stay set with GI stay wire (7x3.15 mm dia), binding of stay wire, by providing Guy stay insulator (1 Nos.) as per technical specifications, approved drawings and scope of works.

256

-

-

... More
Aluminium binding wire

640

-

-

... More
GI Wire No. 8 SWG

640

-

-

... More
M S Nuts , Bolts and Washers (Assorted). Galvanized.

1344

-

-

... More
Aluminium Tape

640

-

-

... More
Stone Base plate for 11/415 KV DSS

128

-

-

... More
Anti-climbing Devices (Barbed wire) 2.5 mm Dia /12 SWG Galvanized

512

-

-

... More
Miscelenious Hardwares ( Inc. safety equipment, Sign Board(as per approved drawing) etc

64

-

-

... More
LT Distribution box suitable for 25 KVA transformer (100 A, isolator & 6 SP MCCB of 100 A). Outdoor mounting type Distribution box made of MS sheet of thickness not less than 18 SWG CRCA sheet/ SMC Distribution Box, dust and moisture vermin, weather proof with degree of protection with suitable bus bars, earthing cum neutral bus, earthing terminals, box illumination, front door operated with proper locking arrangement, lugs, mounting channel frame, internal wiring with FRLS cables, danger plate, numbering, back clamps, hardware as per scope of the work, technical specifications and approved drawings suitable for following transformer: (as per technical specifications, approved drawings and scope of works)

64

-

-

... More
MS Flat (75x40x6 mm)[ GALVANIZED]

640

-

-

... More
Earth clamp for earthwire (50 x 6 mm)[GALVANIZED]

128

-

-

... More
11 KV Earthing (Chemical) with 3 Nos pipe earthing using 20mm dia GI pipe 2 mtrs. Long. making earth grid using 50x6mm GI Flat and riser and connecting risers to various equipment as per technical specifications, scope of works and approved drawings.

64

-

-

... More
Danger Plate 11KV as per technical specifications, scope of works and approved drawings.

64

-

-

... More
11 kV, 3-ph, Drop Out fuse units (set of 3 units) along with Support Insulators, Base Channel, fuse barrel etc. complete as per technical specifications, scope of works and approved drawings.

64

-

-

... More
OPC CEMENT

256

-

-

... More
Engineering, drawing & supply of new 11/0.4 KV, outdoor type, oil immersed 63 KVA Distribution Transformer Substations with all accessories as per scope of work, approved drawings and technical specifications: (HVDS Work)

-

-

-

... More
9 M long Steel Tubular poles with welded steel base plate of Designation 540 SP 32 (IS 2713, Pt I, II, III 1980). as per Technical Specification, approved Drawing & Scope of works

12

-

-

... More
50 sqmm single core XLPE Aluminium Conductor, Stranded, unarmoured cable. as per Technical Specification, approved Drawing & Scope of works.

480

-

-

... More
70 sqmm single core XLPE Aluminium Conductor, Stranded, unarmoured cable. as per Technical Specification, approved Drawing & Scope of works.

240

-

-

... More
P G clamp for 30/50 sq.mm AS per IS 8309

36

-

-

... More
11 KV pin Insulator ( Polymer) with GI Pin and Hardware fittings. as per scope of work. as per Technical Specification, approved Drawing & Scope of works

18

-

-

... More
11 KV disc Insulator (Polymer) 45 KN with Strain H/W Fitting. as per scope of work. as per Technical Specification, approved Drawing & Scope of works

18

-

-

... More
11 KV, 600 A, 3-pole Horizontal/Vertical Mounting type, Gang Operated, AB Switch along with Support Insulators, Base Channel, down Pipe, Arcing Horns etc. AB Switch for Distribution Transformer Substation.as per Technical Specification, approved Drawing & Scope of works

6

-

-

... More
11 KV Lightening Arrestor S/stn.Type Heavy Duty 9 KV, 10 KA Distribution Class Lightening Arrester for DT.as per technical specification, approved drawings and scope of work. (1 set of 3 Nos)

6

-

-

... More
11/0.433 KV outdoor type, oil immersed, Distribution Transformer 63 KVA, 3 phase Aluminium wound DTR. , Stack type CRGO Core fitted. as per IS1180 (Part-1): 2014 and its amendments 1, 2, 3 and 4, CRGO/Amorphous core, Energy Efficiency Level 1, carrying Bureau of Indian Standard Certificate mark with all accessories as per scope of work, approved drawings and specifications.

6

-

-

... More
Clamp (50 x 6 mm Flat) for Top Channel [GALVANIZED]

24

-

-

... More
Clamp (50 x 6 mm) for AB switch base channel [GALVANIZED]

24

-

-

... More
Stay clamp side/angle (50 x 10 mm)

24

-

-

... More
MS Channel (100x50x6 mm) for 11 KV AB switch [GALVANIZED]

18

-

-

... More
11KV Top Channel (100x50x6) 9.56 kg per meter [GALVANIZED]

12

-

-

... More
MS Angle for L T distribution bus (35 x 35 x6 mm) [GALVANIZED]

6

-

-

... More
Transformer Base Channel (100x50x6 mm) [GALVANIZED]

12

-

-

... More
MS Channel (75x40x6 mm)for supporting H.G fuse & L.A [GALVANIZED]

12

-

-

... More
Transformer belting (50x50x6 mm) & belting support (40x40x6 mm)[GALVANIZED]

12

-

-

... More
Clamp (50 x 6 mm) for Transformer base channel [GALVANIZED]

36

-

-

... More
Clamp (50 x 6 mm) for Transformer belting [ GALVANIZED]

24

-

-

... More
Clamp (50 x 6 mm) for LT bus & H.G fuse set [ GALVANIZED]

24

-

-

... More
Male female contact of 11 KV AB Switch 600 Amp

6

-

-

... More
Complete stay set with GI stay wire (7x3.15 mm dia), binding of stay wire, by providing Guy stay insulator (1 Nos.) as per technical specifications, approved drawings and scope of works.

24

-

-

... More
Miscellaneous spares.

6

-

-

... More
LT Distribution box suitable for 63 KVA transformer (200 A, isolator & 6 SP MCCB of 100 A). Outdoor mounting type Distribution box made of MS sheet of thickness not less than 18 SWG CRCA sheet/ SMC Distribution Box, dust and moisture vermin, weather proof with degree of protection with suitable bus bars, earthing cum neutral bus, earthing terminals, box illumination, front door operated with proper locking arrangement, lugs, mounting channel frame, internal wiring with FRLS cables, danger plate, numbering, back clamps, hardware as per scope of the work, technical specifications and approved drawings suitable for following transformer: as per technical specifications, approved drawings and scope of works.

6

-

-

... More
Aluminium binding wire

60

-

-

... More
8 SWG GI Wire

60

-

-

... More
M S Nuts , Bolts and Washers (Assorted). Galvanized.

126

-

-

... More
Aluminium Tape

60

-

-

... More
Stone Base plate for 11/415 KV,D.S.S.

12

-

-

... More
Anti-climbing Devices (Barbed wire) 2.5 mm Dia /12 SWG Galvanized

60

-

-

... More
Miscelenious Hardwares ( Inc. safety equipment, Signboard (as per approved drawing),etc.

6

-

-

... More
MS Flat (75x40x6 mm)[ GALVANIZED]

60

-

-

... More
Earth clamp for earthwire (50 x 6 mm)[GALVANIZED]

12

-

-

... More
11 KV Earthing (Chemical) with 3 Nos pipe earthing using 20mm dia GI pipe 2 mtrs. Long. making earth grid using 50x6mm GI Flat and riser and connecting risers to various equipment as per technical specifications, scope of works and approved drawings.

6

-

-

... More
Danger Plate 11KV as per technical specifications, scope of works and approved drawings.

6

-

-

... More
11 kV, 3-ph, Drop Out fuse units (set of 3 units) along with Support Insulators, Base Channel, fuse barrel etc. complete as per technical specifications, scope of works and approved drawings.

6

-

-

... More
OPC Cement & other aggregates

24

-

-

... More
Engineering, drawing & supply of LT line 3-phase 5 wire using LT AB Cable 35 sq mm support on 8 Mtr Long STP pole as per TS & approved drawing (HVDS Work)

-

-

-

... More
8 M long Steel Tubular poles with welded steel base plate of Designation 540 SP 15 (IS 2713, Pt I, II, III 1980) galvanized

550

-

-

... More
LT AB Cable 3x35 +1x16+1x25 Sq. mm

24.2

-

-

... More
Galvanised Stay Set with anchor plate (200x200x6mm), 50x8mm stay clamp, nut bolts, 2 Nos turn buckles, 1.8 m long, 16 mm diameter solid GS Stay rod etc as required as per technical specification, approved drawings and scope of work.

396

-

-

... More
Stay Insulator

396

-

-

... More
Stay Wire (7/4)mm 8 SWG

1980

-

-

... More
Suspension clamp Assembly with straps & buckle (35-50mm)

440

-

-

... More
Dead End Clamp assembly with straps & Buckles ( 35-50)mm

88

-

-

... More
Anchor Clamp

176

-

-

... More
IPC Main 16-95 and Tap 4-35 sq mm

2200

-

-

... More
Pole Clamp

550

-

-

... More
Eye Hook

550

-

-

... More
Distribution Box 3 Phase Type A- Single Ph. /Type B- Three Ph.

308

-

-

... More
Stay Clamp of Ms Flat (50x6mm)

396

-

-

... More
Nut & Bolts with washers (assorted)

158

-

-

... More
Engineering, drawing & supply of AB Cable Single Phase 25 Sq.mm new line on 8 mtr GI STP Poles As per TS & Approved drawing ( HVDS Work)

-

-

-

... More
8 M long Steel Tubular poles with welded steel base plate of Designation 540 SP 15 (IS 2713, Pt I, II, III 1980) galvanized

500

-

-

... More
LT AB Cable 1X25 +1x16+1x25 Sq. mm

22

-

-

... More
Galvanised Stay Set with anchor plate (200x200x6mm), 50x8mm stay clamp, nut bolts, 2 Nos turn buckles, 1.8 m long, 16 mm diameter solid GS Stay rod etc as required as per technical specification, approved drawings and scope of work.

360

-

-

... More
Stay Insulator

360

-

-

... More
Stay Wire (7/4 mm/8 SWG)

1800

-

-

... More
Suspension clamp Assembly with straps & buckle (25-50 Sq.mm)

400

-

-

... More
Dead End Clamp assembly with straps & Buckles ( 25-50 sq. mm)

80

-

-

... More
Anchor Clamp

160

-

-

... More
IPC Main 16-95 and Tap 4-35 sq mm

2000

-

-

... More
Pole Clamp

500

-

-

... More
Eye Hook

500

-

-

... More
Distribution Box 3 Phase Type A- Single Ph. /Type B- Three Ph.

280

-

-

... More
Stay Clamp of Ms Flat (50x6mm)

360

-

-

... More
Nut & Bolts with Washers (assorted)

144

-

-

... More
Feeder Bifurcation Work

-

-

-

... More
Engineering, drawing & supply of AB Cable Three Phase 50 Sq.mm new line 8 mtr GI STP Pole. As per Technical Specification and approved drawing. (Feeder bifurcation work)

-

-

-

... More
8 M long Steel Tubular poles with welded steel base plate of Designation 540 SP 15 (IS 2713, Pt I, II, III 1980) galvanized

75

-

-

... More
LT AB Cable 3x50 +1x16+1x35 sq.mm

3.3

-

-

... More
Galvanised Stay Set with anchor plate (200x200x6mm), 50x8mm stay clamp, nut bolts, 2 Nos turn buckles, 1.8 m long, 16 mm diameter solid GS Stay rod etc as required as per technical specification, approved drawings and scope of work.

57

-

-

... More
Stay Insulator

57

-

-

... More
Stay Wire (7/4 mm/8 SWG)

300

-

-

... More
Suspension clamp Assembly with straps & buckle (35-50 Sq. mm)

60

-

-

... More
Dead End Clamp assembly with straps & Buckles ( 35-50 Sq. mm)

24

-

-

... More
Anchor Clamp

24

-

-

... More
IPC Main 16-95 and Tap 4-50 sq mm

300

-

-

... More
Pole Clamp

75

-

-

... More
Eye Hook

75

-

-

... More
Distribution Box 3 Phase 25-50 Sq.mm TypeA- Single Phase, Type B- Three Phase

60

-

-

... More
Stay Clamp of Ms Flat (50x6mm)

54

-

-

... More
Nut & Bolts with Washers(assorted)

29

-

-

... More
Engineering, drawing & supply of new 11/0.4 KV, outdoor type, oil immersed 100 KVA Distribution Transformer Substations with all accessories as per scope of work, approved drawings and technical specifications: (Feeder Bifurcation work)

-

-

-

... More
9 M long Steel Tubular poles with welded steel base plate of Designation 540 SP 32 (IS 2713, Pt I, II, III 1980). as per Technical Specification, approved Drawing & Scope of works

8

-

-

... More
50 sqmm single core XLPE Aluminium Conductor, Stranded, unarmoured cable. as per Technical Specification, approved Drawing & Scope of works.

320

-

-

... More
70 sqmm single core XLPE Aluminium Conductor, Stranded, unarmoured cable. as per Technical Specification, approved Drawing & Scope of works.

160

-

-

... More
P G clamp for 30/50 sq.mm as per IS 8309

24

-

-

... More
11 KV pin Insulator ( Polymer) with GI Pin and Hardware fittings. as per scope of work. as per Technical Specification, approved Drawing & Scope of works

12

-

-

... More
11 KV disc Insulator (Polymer) 45 KN with Strain H/W Fitting. as per scope of work. as per Technical Specification, approved Drawing & Scope of works

12

-

-

... More
11 KV, 600 A, 3-pole Horizontal/Vertical Mounting type, Gang Operated, AB Switch along with Support Insulators, Base Channel, down Pipe, Arcing Horns etc. AB Switch for Distribution Transformer Substation.as per Technical Specification, approved Drawing & Scope of works

4

-

-

... More
11 KV Lightening Arrestor S/stn.Type Heavy Duty 9 KV, 10 KA Distribution Class Lightening Arrester for DT.as per technical specification, approved drawings and scope of work. (1 set of 3 Nos)

4

-

-

... More
11/0.433 KV outdoor type, oil immersed, Distribution Transformer 100 KVA, 3 phase Aluminium wound DTR. Stack type CRGO Core fitted. as per IS1180 (Part-1): 2014 and its amendments 1, 2, 3 and 4, CRGO/Amorphous core, Energy Efficiency Level 1, carrying Bureau of Indian Standard Certificate mark with all accessories as per scope of work, approved drawings and specifications.

4

-

-

... More
Clamp (50 x 6 mm Flat) for Top Channel [GALVANIZED]

16

-

-

... More
Clamp (50 x 6 mm) for AB switch base channel [GALVANIZED]

16

-

-

... More
Stay clamp side/angle (50 x 10 mm)

16

-

-

... More
MS Channel (100x50x6 mm) for 11 KV AB switch [GALVANIZED]

12

-

-

... More
11KV Top Channel (100x50x6) 9.56 kg per meter [GALVANIZED]

8

-

-

... More
MS Angle for L T distribution bus (35 x 35 x6 mm) [GALVANIZED]

4

-

-

... More
Transformer Base Channel (100x50x6 mm) [GALVANIZED]

8

-

-

... More
MS Channel (75x40x6 mm)for supporting H.G fuse & L.A [GALVANIZED]

8

-

-

... More
Transformer belting (50x50x6 mm) & belting support (40x40x6 mm)[GALVANIZED]

8

-

-

... More
Clamp (50 x 6 mm) for Transformer base channel [GALVANIZED]

24

-

-

... More
Clamp (50 x 6 mm) for Transformer belting [ GALVANIZED]

16

-

-

... More
Clamp (50 x 6 mm) for LT bus & H.G fuse set [ GALVANIZED]

16

-

-

... More
Male female contact of 11 KV AB Switch 600 Amp

4

-

-

... More
Complete stay set with GI stay wire (7x3.15 mm dia), binding of stay wire, by providing Guy stay insulator (1 Nos.) as per technical specifications, approved drawings and scope of works.

16

-

-

... More
Necessary miscellaneous Spares

4

-

-

... More
LT Distribution box with suitable rating MCCB for incomer & Kit-Kat for two no outgoing feeder suitable for 3-Phase 11/0.4 kV, 100 kVA, Distribution Transformer alongwith energymeter suitable for pole mounting as per TS

4

-

-

... More
Aluminium binding wire

40

-

-

... More
GI Wire No. 8

40

-

-

... More
M S Nuts , Bolts and Washers (Assorted). Galvanized.

84

-

-

... More
Aluminium Tape

40

-

-

... More
Stone Base plate for 11/ 415 KV DSS

8

-

-

... More
Anti-climbing Devices (Barbed wire) 2.5 mm Dia /12 SWG Galvanized

40

-

-

... More
MS Flat (75x40x6 mm)[ GALVANIZED]

40

-

-

... More
Earth clamp for earthwire (50 x 6 mm)[GALVANIZED]

8

-

-

... More
11 KV Earthing (Chemical) with 3 Nos pipe earthing using 20mm dia GI pipe 2 mtrs. Long. making earth grid using 50x6mm GI Flat and riser and connecting risers to various equipment as per technical specifications, scope of works and approved drawings.

4

-

-

... More
Danger Plate 11KV as per technical specifications, scope of works and approved drawings.

4

-

-

... More
Miscelenious Hardwares ( Inc. safety equipment, Sign board (as per approved drawing),etc.

4

-

-

... More
11 kV, 3-ph, Drop Out fuse units (set of 3 units) along with Support Insulators, Base Channel, fuse barrel etc. complete as per technical specifications, scope of works and approved drawings.

4

-

-

... More
OPC CEMENT

16

-

-

... More
Engineering, drawing & supply of new 11/0.4 KV, outdoor type, oil immersed 63 KVA Distribution Transformer Substations with all accessories as per scope of work, approved drawings and technical specifications: (Feeder Bifurcation Work)

-

-

-

... More
9 M long Steel Tubular poles with welded steel base plate of Designation 540 SP 32 (IS 2713, Pt I, II, III 1980). as per Technical Specification, approved Drawing & Scope of works

16

-

-

... More
50 sqmm single core XLPE Aluminium Conductor, Stranded, unarmoured cable. as per Technical Specification, approved Drawing & Scope of works.

640

-

-

... More
70 sqmm single core XLPE Aluminium Conductor, Stranded, unarmoured cable. as per Technical Specification, approved Drawing & Scope of works.

320

-

-

... More
P G clamp for 30/50 sq.mm as per IS 8309

48

-

-

... More
11 KV pin Insulator ( Polymer) with GI Pin and Hardware fittings. as per scope of work. as per Technical Specification, approved Drawing & Scope of works

24

-

-

... More
11 KV disc Insulator (Polymer) 45 KN with Strain H/W Fitting. as per scope of work. as per Technical Specification, approved Drawing & Scope of works

24

-

-

... More
11 KV, 600 A, 3-pole Horizontal/Vertical Mounting type, Gang Operated, AB Switch along with Support Insulators, Base Channel, down Pipe, Arcing Horns etc. AB Switch for Distribution Transformer Substation.as per Technical Specification, approved Drawing & Scope of works

8

-

-

... More
11 KV Lightening Arrestor S/stn.Type Heavy Duty 9 KV, 10 KA Distribution Class Lightening Arrester for DT.as per technical specification, approved drawings and scope of work.

8

-

-

... More
11/0.433 KV outdoor type, oil immersed, Distribution Transformer 63 KVA, 3 phase Aluminium wound DTR. Stack type CRGO Core fitted. as per IS1180 (Part-1): 2014 and its amendments 1, 2, 3 and 4, CRGO/Amorphous core, Energy Efficiency Level 1, carrying Bureau of Indian Standard Certificate mark with all accessories as per scope of work, approved drawings and specifications.

8

-

-

... More
Clamp (50 x 6 mm Flat) for Top Channel [GALVANIZED]

32

-

-

... More
Clamp (50 x 6 mm) for AB switch base channel [GALVANIZED]

32

-

-

... More
Stay clamp side/angle (50 x 10 mm)

32

-

-

... More
MS Channel (100x50x6 mm) for 11 KV AB switch [GALVANIZED]

24

-

-

... More
11KV Top Channel (100x50x6) 9.56 kg per meter [GALVANIZED]

16

-

-

... More
MS Angle for L T distribution box (35 x 35 x6 mm) [GALVANIZED]

8

-

-

... More
Transformer Base Channel (100x50x6 mm) [GALVANIZED]

16

-

-

... More
MS Channel (75x40x6 mm)for supporting H.G fuse & L.A [GALVANIZED]

16

-

-

... More
Transformer belting (50x50x6 mm) & belting support (40x40x6 mm)[GALVANIZED]

16

-

-

... More
Clamp (50 x 6 mm) for Transformer base channel [GALVANIZED]

48

-

-

... More
Clamp (50 x 6 mm) for Transformer belting [ GALVANIZED]

32

-

-

... More
Clamp (50 x 6 mm) for LT bus & H.G fuse set [ GALVANIZED]

32

-

-

... More
Male female contact of 11 KV AB Switch 600 Amp

8

-

-

... More
Complete stay set with GI stay wire (7x3.15 mm dia), binding of stay wire, by providing Guy stay insulator (1 Nos.) as per technical specifications, approved drawings and scope of works.

32

-

-

... More
Miscellaneous Hardwares spares

8

-

-

... More
LT Distribution box suitable for 63 KVA transformer (200 A, isolator & 6 SP MCCB of 100 A). Outdoor mounting type Distribution box made of MS sheet of thickness not less than 18 SWG CRCA sheet/ SMC Distribution Box, dust and moisture vermin, weather proof with degree of protection with suitable bus bars, earthing cum neutral bus, earthing terminals, box illumination, front door operated with proper locking arrangement, lugs, mounting channel frame, internal wiring with FRLS cables, danger plate, numbering, back clamps, hardware as per scope of the work, technical specifications and approved drawings suitable for following transformer: as per technical specifications, approved drawings and scope of works.

8

-

-

... More
Aluminium binding wire

80

-

-

... More
GI Wire No. 8 SWG

80

-

-

... More
M S Nuts , Bolts and Washers (Assorted). Galvanized.

168

-

-

... More
Aluminium Tape

80

-

-

... More
Stone Base plate for 11/415 KV DSS.

16

-

-

... More
Anti-climbing Devices (Barbed wire) 2.5 mm Dia /12 SWG Galvanized

80

-

-

... More
Miscellaneous Hardwares ( Inc. safety equipment, Sign Board (As per Approved Drawing), etc)

8

-

-

... More
MS Flat (75x40x6 mm)[ GALVANIZED]

80

-

-

... More
Earth clamp for earthwire (50 x 6 mm)[GALVANIZED]

16

-

-

... More
11 KV Earthing (Chemical) with 3 Nos pipe earthing using 20mm dia GI pipe 2 mtrs. Long. making earth grid using 50x6mm GI Flat and riser and connecting risers to various equipment as per technical specifications, scope of works and approved drawings.

8

-

-

... More
Danger Plate 11KV as per technical specifications, scope of works and approved drawings.

8

-

-

... More
11 kV, 3-ph, Drop Out fuse units (set of 3 units) along with Support Insulators, Base Channel, fuse barrel etc. complete as per technical specifications, scope of works and approved drawings.

8

-

-

... More
OPC CEMENT

32

-

-

... More
Engineering, drawing & supply of 11KV line using ACSR (Rabbit) on 9 mtr Long GI Pole supports with Span of 50 Meters (Avg.) having cross bracing in each Double pole As per technical Specification & approved drawings. (Feeder Bifurcation Work)

-

-

-

... More
9 M long Steel Tubular poles with welded steel base plate of Designation 540 SP 32 (IS 2713, Pt I, II, III 1980). as per Technical Specification, approved Drawing & Scope of works

528

-

-

... More
M.S Angle (65x65x6mm)

8160

-

-

... More
M.S Channel (75x40x6 mm)

5160

-

-

... More
Galvanised Stay Set with anchor plate (200x200x6mm), 50x8mm stay clamp, nut bolts, 2 Nos turn buckles, 1.8 m long, 16 mm diameter solid GS Stay rod etc as required as per technical specification, approved drawings and scope of work.

360

-

-

... More
Stranded GI Stay wire 7/3.15 mm dia

1656

-

-

... More
Stay insulator (HT)

360

-

-

... More
11 KV polymer Disc insulator

648

-

-

... More
11 KV Disc Fittings

648

-

-

... More
11 KV polymer Pin insulator

1368

-

-

... More
A.C.S.R 6/3.35+1/3.35mm, 50 sq.mm Al. (Rabbit)

74.4

-

-

... More
G.I Wire ( 8 SWG )

5040

-

-

... More
Nut & Bolts with washers. (assorted)

960

-

-

... More
Stay Clamps of Ms Flat (50x6mm)

360

-

-

... More
Bracket Clamps of Ms Flat (50x6mm)

2160

-

-

... More
Engineering, drawing & supply of LT line 3-phase 5 wire using LT AB Cable 35 sq mm support on 8 Mtr Long STP pole As per technical Specification & Approved drawing(Feeder Bifurcation Work)

-

-

-

... More
8 M long Steel Tubular poles with welded steel base plate of Designation 540 SP 15 (IS 2713, Pt I, II, III 1980) galvanized

75

-

-

... More
LT AB Cable 3x35 + 1x16 + 1x25 Sq.mm

3.3

-

-

... More
Galvanised Stay Set with anchor plate (200x200x6mm), 50x8mm stay clamp, nut bolts, 2 Nos turn buckles, 1.8 m long, 16 mm diameter solid GS Stay rod etc as required as per technical specification, approved drawings and scope of work.

54

-

-

... More
Stay Insulator

54

-

-

... More
Stranded GI Stay wire 7/4 mm dia

270

-

-

... More
Suspension clamp Assembly with straps & buckle (35-50 Sq. mm)

60

-

-

... More
Dead End Clamp assembly with straps & Buckles ( 35-50 Sq. mm)

12

-

-

... More
Anchor Clamp

24

-

-

... More
IPC Main 16-95 and Tap 4-35 sq mm

300

-

-

... More
Pole Clamp

75

-

-

... More
Eye Hook

75

-

-

... More
Distribution Box 3 Phase 25-35 Sq. mm (Type A- Single Phase/Type B- Three Phase)

42

-

-

... More
Stay Clamp of Ms Flat (50x6mm)

54

-

-

... More
Nut & Bolts with washers (assorted)

22

-

-

... More
Other Works

-

-

-

... More
Engineering, drawing & supply of Capacitor bank 2.4 MVAR As per Technical Spec & approved Drawings. (Other Works)

-

-

-

... More
11 kv VCB with control pannel complete set & CT & PT & structure for capacitor bank

1

-

-

... More
Out door capacitor bank set (2.4 MVAR)complete with structure & reactor voltage transformer etc. (As per IS 13925 , IS 5553)

1

-

-

... More
11 kv XLPE cable 3Cx 95sq mm. armoured

50

-

-

... More
11 kv cable box kit

4

-

-

... More
Rail pole 13 mtr long 60 kg

2

-

-

... More
Stone Pad 300x300x75 mm

2

-

-

... More
33 kv top channel 125x65mm 3.2 mtr long GI

1

-

-

... More
Cross Bracing set 50x50x6 mm

1

-

-

... More
33 kv composite polymer pin insulator with nut & washer.

3

-

-

... More
E clamp

3

-

-

... More
33 kv composite polymer type disc insulator with hardware fitting

6

-

-

... More
Earth wire clamp

1

-

-

... More
PP & Clamp for 13 mtr Rail pole

2

-

-

... More
Bracing Clamp for Rail pole(Top end Bottom)

2

-

-

... More
Stay clamp for Rail pole

6

-

-

... More
Number plate with clamp

1

-

-

... More
Danger board

1

-

-

... More
PG clamp for Panther conductor

12

-

-

... More
MS nut & Bolts with washers (Assorted).

4

-

-

... More
Aluminium binding wire(5mm dia)

5

-

-

... More
Aluminium binding tape

5

-

-

... More
Aluminium Paint

5

-

-

... More
Red oxide Paint

5

-

-

... More
Earthing Pipe 40 mm dia ,7 feet length.

1

-

-

... More
GI wire 6 SWG

1

-

-

... More
Barbed wire

4

-

-

... More
Rod type Earthing Complete including GI wire 6 SWG

1

-

-

... More
Engineering, drawing & supply of Capacitor bank 3.6 MVAR As per Technical Spec & approved Drawings. (Other Works)

-

-

-

... More
11 kv VCB with control pannel complete set & CT & PT & structure for capacitor bank

2

-

-

... More
Out door capacitor bank set(3.6 MVAR) complete with structure & reactor voltage transformer etc. (As per IS 13925 , IS 5553)

2

-

-

... More
11 kv XLPE cable 3Cx95sq mm. armoured

100

-

-

... More
11 kv cable box kit

8

-

-

... More
Rail pole 13 mtr long 60 kg

4

-

-

... More
Stone Pad 300x300x75 mm

4

-

-

... More
33 kv top channel 125x65mm 3.2 mtr long GI

2

-

-

... More
Cross Bracing set 50x50x6 mm

2

-

-

... More
33 kv composite polymer pin insulator with nut

6

-

-

... More
E clamp

6

-

-

... More
33 kv composite polymer type disc insulator with hardware fitting

12

-

-

... More
earth wire clamp

2

-

-

... More
PP & Clamp for 13 mtr Rail pole

4

-

-

... More
Bracing Clamp for Rail pole(Top end Bottom)

4

-

-

... More
Stay clamp for Rail pole

12

-

-

... More
Number plate with clamp

2

-

-

... More
Danger board

2

-

-

... More
PG clamp for Panther conductor

24

-

-

... More
MS nut & Bolts with washers (assorted).

8

-

-

... More
Aluminium binding wire(5mm dia)

10

-

-

... More
Aluminium binding tape

10

-

-

... More
Aluminium Paint

10

-

-

... More
Red oxide Paint

10

-

-

... More
Earthing Pipe 40 mm dia, 7 feet length

2

-

-

... More
GI wire 6 SWG

2

-

-

... More
Barbed wire

8

-

-

... More
Rod type Earthing Complete including GI wire 6 SWG

2

-

-

... More
Replacement of of 11 kV VCB with CT & CR Panel from existing 11KV VCB & its accessories as per approved drawing and Technical Specification. (Other Works)

-

-

-

... More
11 KV VCB, 12KV, Outdoor type, 630 A, 25 KA for 3 sec. rupturing capacity CT 600-400-200-100/1-1A, 2 Core, Accuracy 1.0, & VA Burden 15 VA & 15 VA PT 11KV / 110V, Accuracy class 1, VA Burden 100VA, Single Core

2

-

-

... More
Structure for 11 KV CT [Galvanized]

2

-

-

... More
Structure for 11 KV PT [Galvanized]

2

-

-

... More
2.5 sq mm CU 10 C control cable (Armoured)

60

-

-

... More
Replacement of 11 KV AB switch 400 A As per approved drawing & Technical Specification. (Other Works)

-

-

-

... More
9.0 mtr long Galvanised Steel Pole

12

-

-

... More
M.S Angle (65x65x6mm)

120

-

-

... More
M.S Channel (75x40x6) mm

480

-

-

... More
Stay set complete

12

-

-

... More
Stranded wire 7/3.15 mm Dia

60

-

-

... More
Stay insulator (HT)

12

-

-

... More
11 KV polymer Disc insulator

36

-

-

... More
11 KV Disc Fittings

36

-

-

... More
11 KV polymer Pin insulator

18

-

-

... More
11kV GOS/AB Switch

6

-

-

... More
11kV DOF/HG Fuse

6

-

-

... More
A.C.S.R (Weasel/Rabbit)

0.6

-

-

... More
G.I Wire ( 8 SWG )

30

-

-

... More
Nut & Bolts with washer (assorted)

18

-

-

... More
Stay Clamps of MS Flat (50x6mm)

12

-

-

... More
Bracket Clamps of MS Flat (50x6mm)

60

-

-

... More
Coil Earthing

12

-

-

... More
30-50 sqmm Bimetallic Lugs

72

-

-

... More
Erection

-

-

-

... More
LT Cable related works (Replacement)

-

-

-

... More
Erection, testing & commissioning of 3-ph 50 Sq. mm AB Cable Replacement Work (8 Mtr GI STP Pole) Replacement work as per approved Drawing.

-

-

-

... More
Survey, route alignment & pole spotting, preparation of survey report and uploading in the web portal after approval of Project Manager for LT line.

510

-

-

... More
Excavation of pole pits (of dept 1/6th of pole length) in all type of soil as per scope of work, approved drawings and specifications.

3570

-

-

... More
Erection of 8 mtr STP(GI)/PCC poles for LT overhead line by providing and installing danger plate, anti-climbing devices (barbed wire), earthing material (8SWG GI wire), pole numbering including cement concrete foundation or refilling by bolders using cement concreting foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) or/and 200 mm average size bolders mixed with excavated earth etc as per scope of work, approved drawings and specifications:

3570

-

-

... More
Stringing of Three Phase LT Aerial Bunched Cable (3Cx50+1x35+1x16 sq.mm), sq. mm with bare messenger wire including erection of eyehooks & eyehook clamps, suspension & dead clamps and all accessories as per approved drawings. This would include supply & erection of jointing kits, end caps, connectors for ABC to ABC tapping including supply of connectors (IPC Type-I & Type- II) used for tapping Including removal of existing LT bare conductor line & fixtures, depositing to stores of employer.

510

-

-

... More
Erection of complete stay set with GI stay wire ,Including Excavation of stay pit in all kind of soil , binding of stay wire, by providing Guy stay insulator and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) as per technical specifications, approved drawings and scope of works.

2040

-

-

... More
Erection of 3 Phase LT distribution boxes/kiosk on the LT poles including all calmps & material required for mounting connections & sealing.

7140

-

-

... More
Erection, testing & commissioning of 3-ph 35 Sq. Mm AB Cable Replacement (8 Mtr GI STP Pole) Replacement work As per approved drawing.

-

-

-

... More
Survey, route alignment & pole spotting, preparation of survey report and uploading in the web portal after approval of Project Manager for LT line.

258

-

-

... More
Excavation of pole pits (of dept 1/6th of pole length) in all type of soil as per scope of work, approved drawings and specifications.

1806

-

-

... More
Erection of 8 mtr STP (GI)/PCC poles for LT overhead line by providing and installing danger plate, anti-climbing devices (barbed wire), earthing material (8SWG GI wire), pole numbering including cement concrete foundation or refilling by bolders using cement concreting foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) or/and 200 mm average size bolders mixed with excavated earth etc as per scope of work, approved drawings and specifications:

1806

-

-

... More
Stringing of Three Phase LT Aerial Bunched Cable (3Cx35+1x25+1x16 sq.mm), sq. mm with bare messenger wire including erection of eyehooks & eyehook clamps, suspension & dead clamps and all accessories as per approved drawings. This would include supply & erection of jointing kits, end caps, connectors for ABC to ABC tapping including supply of connectors (IPC Type-I & Type- II) used for tapping Including removal of existing LT bare conductor line & fixtures, depositing to stores of employer.

258

-

-

... More
Erection of complete stay set with GI stay wire ,Including Excavation of stay pit in all kind of soil , binding of stay wire, by providing Guy stay insulator and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) as per technical specifications, approved drawings and scope of works.

1032

-

-

... More
Erection of 3 Phase LT distribution boxes/kiosk on the LT poles including all calmps & material required for mounting connections & sealing.

3612

-

-

... More
Erection, testing & commissioning of 1-ph 25 Sq. Mm AB Cable Replacement (8 Mtr GI STP Pole) Replacement work As per approved drawing.

-

-

-

... More
Survey, route alignment & pole spotting, preparation of survey report and uploading in the web portal after approval of Project Manager for LT line.

86

-

-

... More
Excavation of pole pits (of dept 1/6th of pole length) in all type of soil as per scope of work, approved drawings and specifications.

602

-

-

... More
Erection of 8 mtr STP (GI) /PCC poles for LT overhead line by providing and installing danger plate, anti-climbing devices (barbed wire), earthing material (8SWG GI wire), pole numbering including cement concrete foundation or refilling by bolders using cement concreting foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) or/and 200 mm average size bolders mixed with excavated earth etc as per scope of work, approved drawings and specifications:

602

-

-

... More
Stringing of Three Phase LT Aerial Bunched Cable (1Cx25+1x16+1x25 sq.mm), sq. mm with bare messenger wire including erection of eyehooks & eyehook clamps, suspension & dead clamps and all accessories as per approved drawings. This would include supply & erection of jointing kits, end caps, connectors for ABC to ABC tapping including supply of connectors (IPC Type-I & Type- II) used for tapping Including removal of existing LT bare conductor line & fixtures, depositing to stores of employer.

86

-

-

... More
Erection of complete stay set with GI stay wire ,Including Excavation of stay pit in all kind of soil , binding of stay wire, by providing Guy stay insulator and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) as per technical specifications, approved drawings and scope of works.

430

-

-

... More
Erection of Single Phase LT distribution boxes/kiosk on the LT poles including all calmps & material required for mounting connections & sealing.

1118

-

-

... More
HVDS Works

-

-

-

... More
Erection, testing & commissioning of 11KV line using ACSR (weasel) on 9 mtr Long GI Pole supports with Avg. Span of 50 Meters having cross bracing in each Double pole (HVDS Work) As per approved drawing.

-

-

-

... More
Survey, route alignment & pole spotting, preparation of survey report and uploading in the web portal after approval of Project Manager for 11 KV line

44

-

-

... More
Excavation of pole pit (of depth 1/6th of pole length) in normal soil as per scope of work, approved drawings and specifications:

924

-

-

... More
Erection of 9 mtr STP (GI) /PCC poles for 11 KV overhead lines by providing and installing danger plate, anti-climbing devices (barbed wire), earthing material (8SWG GI wire), pole numbering including cement concrete foundation or refilling by bolders using cement concreting foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) or/and 200 mm average size bolders mixed with excavated earth etc as per scope of work, approved drawings and specifications:

924

-

-

... More
Stringing of S/C 3- ph, 3-wire, 11 KV line with ACSR Weasel conductor (Average span 45 meters).This includes all activities i.e. installation of polymer insulators with mounting hardware , stringing of conductor, binding of conductor with pin insulator using preformed insulator binding, mid span jointing, repairing of conductor using repair sleeve if unavidable, fixing of anti climbing device & danger plate on all 2/3/4 Pole structures & road crossing poles, jumpering etc. complete in all respect. This includes supply and installation of repair sleeves, mid span joint, danger plate.

44

-

-

... More
Erection, testing & commissioning of Pre-fabricated steel items like V cross arm, top clamp, DC cross arm, bracket, clamps, cross bracings, bracings, strain plate, guarding channels, back clamp, transformer mounting structure, DO mounting channel, Transformer clamping set, bracket, clamps, cross bracings, bracings, strain clamp, guarding channels, back clamp and MS nut, bolts & washers etc as per technical specification, approved drawings and scope of work.

924

-

-

... More
Erection of complete 11KV stay set with GI stay wire (7x3.15 mm dia),Including Excavation of stay pit in all kind of soil , binding of stay wire, by providing Guy stay insulator and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) as per technical specifications, approved drawings and scope of works.

880

-

-

... More
Installation of Strut Pole as per approved drawing including escavation work and all necessary hard ware fittings

44

-

-

... More
Erection, testing & commissioning of earthing arrangement using 8 SWG GI Wire, GI nuts, bolts & washers as per technical specification, approved drawings and scope of work.

924

-

-

... More
Erection, testing & commissioning of 11KV line using ACSR (Rabbit) on 9 mtr Long GI Pole supports with Avg. Span of 50 Meters having cross bracing in each Double pole (HVDS Work) As per approved drawing.

-

-

-

... More
Survey, route alignment & pole spotting, preparation of survey report and uploading in the web portal after approval of Project Manager for 11 KV line

42

-

-

... More
Excavation of pole pit (of depth 1/6th of pole length) in normal soil as per scope of work, approved drawings and specifications:

882

-

-

... More
Erection of 9 mtr STP (GI)/ PCC poles for 11 KV overhead lines by providing and installing danger plate, anti-climbing devices (barbed wire), earthing material (8SWG GI wire), pole numbering including cement concrete foundation or refilling by bolders using cement concreting foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) or/and 200 mm average size bolders mixed with excavated earth etc as per scope of work, approved drawings and specifications:

882

-

-

... More
Stringing of S/C 3- ph, 3-wire, 11 KV line with ACSR Rabbit conductor (Average span 45 meters).This includes all activities i.e. installation of polymer insulators with mounting hardware , stringing of conductor, binding of conductor with pin insulator using preformed insulator binding, mid span jointing, repairing of conductor using repair sleeve if unavidable, fixing of anti climbing device & danger plate on all 2/3/4 Pole structures & road crossing poles, jumpering etc. complete in all respect. This includes supply and installation of repair sleeves, mid span joint, danger plate.

42

-

-

... More
Erection, testing & commissioning of Pre-fabricated steel items like V cross arm, top clamp, DC cross arm, bracket, clamps, cross bracings, bracings, strain plate, guarding channels, back clamp, transformer mounting structure, DO mounting channel, Transformer clamping set, bracket, clamps, cross bracings, bracings, strain clamp, guarding channels, back clamp and MS nut, bolts & washers etc as per technical specification, approved drawings and scope of work.

882

-

-

... More
Erection of complete 11KV stay set with GI stay wire (7x3.15 mm dia),Including Excavation of stay pit in all kind of soil , binding of stay wire, by providing Guy stay insulator and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) as per technical specifications, approved drawings and scope of works.

882

-

-

... More
Installation of Strut Pole as per approved drawing including escavation work and all necessary hard ware fittings

42

-

-

... More
Erection, testing & commissioning of earthing arrangement using 8 SWG GI Wire, GI nuts, bolts & washers as per technical specification, approved drawings and scope of work.

882

-

-

... More
Erection, testing & commissioning of 11/.433 KV DSS With 25 KVA Distribution Transformer (HVDS Work) As per approved drawing.

-

-

-

... More
Erection of 9 M long STP/PCC poles with welded steel base plate of Designation 540 SP 32 (IS 2713, Pt I, II, III 1980) - Cement concreting 0.5 cmt. including Excavation of pole pit (of depth 1/6th of pole length) in all type of soil, by providing and installing danger plate, anti-climbing devices (barbed wire), earthing material ( 8SWG GI wire), pole numbering including cement concrete foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) & backfilling of soil etc. as per scope of work, approved drawings and specifications:

128

-

-

... More
Excavation of stay pit in all type of soils and Erection of complete stay set with GI stay wire (7x3.15 mm dia), binding of stay wire, by providing Guy stay insulator (1 Nos.) with all accessories and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) etc. complete as per technical specifications, approved drawings and scope of works.

256

-

-

... More
Erection, testing, commissioning of 11/0.4 KV Distribution Transformer 25 KVA 3 phase Aluminium wound DTR. Pre-fabricated steel items like DC cross arm (100x50x6 mm), back clamps, pole clamp, DO mounting channel (100x50x6 mm), transformer mounting channel (100x50x6 mm), transformer clamping set (50x50x6 mm), transformer belting set ( 50x50x6 mm), earth clamp (50x6mm), MS flat (75x40x6mm) ,Clamp (50 x 6 mm) for LT bus & H.G fuse set. , all MS material must be Hot Dip Galvanized and MS nuts, bolts & washers, hardware with all its accessories, including 11 kV Disc insulator with strain hardware & 11 KV Pin insulator with GI pin with their hardware fittings and Erection of Outdoor mounting type Distribution box made of MS sheet. dust and moisture vermin, weather proof with degree of protection IP 33 as per IS 13947. 1.1 KV XLPE Aluminium Conductor, Stranded, unarmoured cable for connection of transformer LV bushing to Distribution Box and Distribution box to overhead line. including PG Clamps, bi- metallic connectors, hardware with all accessories, AB Switch for Distribution Transformer Substation. Distribution Class Lightening Arrester for DT. Drop Out fuse units (set of 3 units) along with Support Insulators, Base Channel, fuse barrel etc. complete as per technical specification, approved drawings and scope of work.

64

-

-

... More
Erection, testing and Commissioning of 3 Nos pipe chemical earthing using 20mm dia GI pipe 1.2 m long, as per IS 1161, making earth grid using 50x6mm GI Flat and riser and connecting risers to various equipment, 8 SWG GI wires, GI nuts, bolts & washers etc. complete as per scope of work, approved drawings and technical specifications,

192

-

-

... More
Erection, testing & commissioning of 11/.433 KV DSS With 63 KVA Distribution Transformer (HVDS Work) As per approved drawings.

-

-

-

... More
Erection of 9 M long STP/PCC poles with welded steel base plate of Designation 540 SP 32 (IS 2713, Pt I, II, III 1980) - Cement concreting 0.5 cmt. including Excavation of pole pit (of depth 1/6th of pole length) in all type of soil, by providing and installing danger plate, anti-climbing devices (barbed wire), earthing material ( 8SWG GI wire), pole numbering including cement concrete foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) & backfilling of soil etc. as per scope of work, approved drawings and specifications:

12

-

-

... More
Excavation of stay pit in all type of soils and Erection of complete stay set with GI stay wire (7x3.15 mm dia), binding of stay wire, by providing Guy stay insulator (1 Nos.) with all accessories and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) etc. complete as per technical specifications, approved drawings and scope of works.

24

-

-

... More
Erection, testing, commissioning of 11/0.4 KV Distribution Transformer 63 KVA 3 phase Aluminium wound DTR. Pre-fabricated steel items like DC cross arm (100x50x6 mm), back clamps, pole clamp, DO mounting channel (100x50x6 mm), transformer mounting channel (100x50x6 mm), transformer clamping set (50x50x6 mm), transformer belting set ( 50x50x6 mm), earth clamp (50x6mm), MS flat (75x40x6mm) ,Clamp (50 x 6 mm) for LT bus & H.G fuse set. , all MS material must be Hot Dip Galvanized and MS nuts, bolts & washers, hardware with all its accessories, including 11 kV Disc insulator with strain hardware & 11 KV Pin insulator with GI pin with their hardware fittings and Erection of Outdoor mounting type Distribution box made of MS sheet. dust and moisture vermin, weather proof with degree of protection IP 33 as per IS 13947. 1.1 KV XLPE Aluminium Conductor, Stranded, unarmoured cable for connection of transformer LV bushing to Distribution Box and Distribution box to overhead line. including PG Clamps, bi- metallic connectors, hardware with all accessories, AB Switch for Distribution Transformer Substation. Distribution Class Lightening Arrester for DT. Drop Out fuse units (set of 3 units) along with Support Insulators, Base Channel, fuse barrel etc. complete as per technical specification, approved drawings and scope of work.

6

-

-

... More
Erection, testing and Commissioning of 3 Nos pipe chemical earthing using 20mm dia GI pipe 1.2 m long, as per IS 1161, making earth grid using 50x6mm GI Flat and riser and connecting risers to various equipment, 8 SWG GI wires, GI nuts, bolts & washers etc. complete as per scope of work, approved drawings and technical specifications,

18

-

-

... More
Erection, testing & commissioning of LT line 3-phase 5 wire using LT AB Cable 35 sq mm support on 8 Mtr Long GI pole As per approved drawings. (HVDS Work)

-

-

-

... More
Survey, route alignment & pole spotting, preparation of survey report and uploading in the web portal after approval of Project Manager for LT line.

22

-

-

... More
Excavation of pole pits (of dept 1/6th of pole length) in all type of soil as per scope of work, approved drawings and specifications.

550

-

-

... More
Erection of 8 mtr STP(GI)/PCC poles for LT overhead line by providing and installing danger plate, anti-climbing devices (barbed wire), earthing material (8SWG GI wire), pole numbering including cement concrete foundation or refilling by bolders using cement concreting foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) or/and 200 mm average size bolders mixed with excavated earth etc as per scope of work, approved drawings and specifications:

550

-

-

... More
Stringing of Three Phase LT Aerial Bunched Cable (3Cx35+1x25+1x16)sq.mm, with bare messenger wire including erection of eyehooks & eyehook clamps, suspension & dead clamps and all accessories as per approved drawings. This would include supply & erection of jointing kits, end caps, connectors for ABC to ABC tapping including supply of connectors (IPC Type-I & Type- II) used for tapping .

22

-

-

... More
Erection of complete stay set with GI stay wire (7x3.15 mm dia),Including Excavation of stay pit in all kind of soil , binding of stay wire, by providing Guy stay insulator and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) as per technical specifications, approved drawings and scope of works.

396

-

-

... More
Erection of 3 Phase LT distribution boxes/kiosk on the LT poles including all calmps & material required for mounting connections & sealing.

308

-

-

... More
Erection, testing & commissioning of AB Cable Single Phase 25 Sq.mm new line (8 Mtr GI STP Pole) As per approved drawing HVDS Work

-

-

-

... More
Survey, route alignment & pole spotting, preparation of survey report and uploading in the web portal after approval of Project Manager for LT line.

20

-

-

... More
Excavation of pole pits (of dept 1/6th of pole length) in all type of soil as per scope of work, approved drawings and specifications.

500

-

-

... More
Erection of 8 mtr STP(GI)/PCC poles for LT overhead line by providing and installing danger plate, anti-climbing devices (barbed wire), earthing material (8SWG GI wire), pole numbering including cement concrete foundation or refilling by bolders using cement concreting foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) or/and 200 mm average size bolders mixed with excavated earth etc as per scope of work, approved drawings and specifications:

500

-

-

... More
Stringing of Three Phase LT Aerial Bunched Cable (1Cx25+1x25+1x16 sq.mm), sq. mm with bare messenger wire including erection of eyehooks & eyehook clamps, suspension & dead clamps and all accessories as per approved drawings. This would include supply & erection of jointing kits, end caps, connectors for ABC to ABC tapping including supply of connectors (IPC Type-I & Type- II) used for tapping .

20

-

-

... More
Erection of complete stay set with GI stay wire (7x3.15 mm dia),Including Excavation of stay pit in all kind of soil , binding of stay wire, by providing Guy stay insulator and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) as per technical specifications, approved drawings and scope of works.

360

-

-

... More
Erection of Single Phase LT distribution boxes/kiosk on the LT poles including all calmps & material required for mounting connections & sealing.

280

-

-

... More
Feeder Bifurcation Works

-

-

-

... More
Erection, testing & commissioning of AB Cable Three Phase 50 Sq.mm new line (8 Mtr GI STP Pole) As per approved drawing in Feeder Bifurcation work

-

-

-

... More
Survey, route alignment & pole spotting, preparation of survey report and uploading in the web portal after approval of Project Manager for LT line.

3

-

-

... More
Excavation of pole pits (of dept 1/6th of pole length) in all type of soil as per scope of work, approved drawings and specifications.

75

-

-

... More
Erection of 8 mtr STP(GI) /PCC poles for LT overhead line by providing and installing danger plate, anti-climbing devices (barbed wire), earthing material (8SWG GI wire), pole numbering including cement concrete foundation or refilling by bolders using cement concreting foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) or/and 200 mm average size bolders mixed with excavated earth etc as per scope of work, approved drawings and specifications:

75

-

-

... More
Stringing of Three Phase LT Aerial Bunched Cable (3Cx50+1x35+1x16 sq.mm), sq. mm with bare messenger wire including erection of eyehooks & eyehook clamps, suspension & dead clamps and all accessories as per approved drawings. This would include supply & erection of jointing kits, end caps, connectors for ABC to ABC tapping including supply of connectors (IPC Type-I & Type- II) used for tapping .

3

-

-

... More
Erection of complete stay set with GI stay wire (7x3.15 mm dia),Including Excavation of stay pit in all kind of soil , binding of stay wire, by providing Guy stay insulator and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) as per technical specifications, approved drawings and scope of works.

54

-

-

... More
Erection of 3 Phase LT distribution boxes/kiosk on the LT poles including all calmps & material required for mounting connections & sealing.

42

-

-

... More
Erection, testing & commissioning of AB Cable Three Phase 35 Sq.mm new line (8 Mtr GI STP Pole) as per approved drawing in Feeder Bifurcation work

-

-

-

... More
Survey, route alignment & pole spotting, preparation of survey report and uploading in the web portal after approval of Project Manager for LT line.

3

-

-

... More
Excavation of pole pits (of dept 1/6th of pole length) in all type of soil as per scope of work, approved drawings and specifications.

75

-

-

... More
Erection of 8 mtr STP(GI)/PCC poles for LT overhead line by providing and installing danger plate, anti-climbing devices (barbed wire), earthing material (8SWG GI wire), pole numbering including cement concrete foundation or refilling by bolders using cement concreting foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) or/and 200 mm average size bolders mixed with excavated earth etc as per scope of work, approved drawings and specifications:

75

-

-

... More
Stringing of Three Phase LT Aerial Bunched Cable (3Cx35+1x25+1x16 sq.mm), sq. mm with bare messenger wire including erection of eyehooks & eyehook clamps, suspension & dead clamps and all accessories as per approved drawings. This would include supply & erection of jointing kits, end caps, connectors for ABC to ABC tapping including supply of connectors (IPC Type-I & Type- II) used for tapping .

3

-

-

... More
Erection of complete stay set with GI stay wire (7x3.15 mm dia),Including Excavation of stay pit in all kind of soil , binding of stay wire, by providing Guy stay insulator and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) as per technical specifications, approved drawings and scope of works.

54

-

-

... More
Erection of 3 Phase LT distribution boxes/kiosk on the LT poles including all calmps & material required for mounting connections & sealing.

42

-

-

... More
Erection, testing & commissioning of 11/.433 KV DSS With 100 KVA Distribution Transformer as per approved drawing.

-

-

-

... More
Erection of 9 M long STP/PCC poles with welded steel base plate of Designation 540 SP 32 (IS 2713, Pt I, II, III 1980) - Cement concreting 0.5 cmt. including Excavation of pole pit (of depth 1/6th of pole length) in all type of soil, by providing and installing danger plate, anti-climbing devices (barbed wire), earthing material ( 8SWG GI wire), pole numbering including cement concrete foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) & backfilling of soil etc. as per scope of work, approved drawings and specifications:

8

-

-

... More
Excavation of stay pit in all type of soils and Erection of complete stay set with GI stay wire (7x3.15 mm dia), binding of stay wire, by providing Guy stay insulator (1 Nos.) with all accessories and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) etc. complete as per technical specifications, approved drawings and scope of works.

16

-

-

... More
Erection, testing, commissioning of 11/0.4 KV Distribution Transformer 100 KVA 3 phase Aluminium wound DTR. Pre-fabricated steel items like DC cross arm (100x50x6 mm), back clamps, pole clamp, DO mounting channel (100x50x6 mm), transformer mounting channel (100x50x6 mm), transformer clamping set (50x50x6 mm), transformer belting set ( 50x50x6 mm), earth clamp (50x6mm), MS flat (75x40x6mm) ,Clamp (50 x 6 mm) for LT bus & H.G fuse set. , all MS material must be Hot Dip Galvanized and MS nuts, bolts & washers, hardware with all its accessories, including 11 kV Disc insulator with strain hardware & 11 KV Pin insulator with GI pin with their hardware fittings and Erection of Outdoor mounting type Distribution box made of MS sheet. dust and moisture vermin, weather proof with degree of protection IP 33 as per IS 13947. 1.1 KV XLPE Aluminium Conductor, Stranded, unarmoured cable for connection of transformer LV bushing to Distribution Box and Distribution box to overhead line. including PG Clamps, bi- metallic connectors, hardware with all accessories, AB Switch for Distribution Transformer Substation. Distribution Class Lightening Arrester for DT. Drop Out fuse units (set of 3 units) along with Support Insulators, Base Channel, fuse barrel etc. complete as per technical specification, approved drawings and scope of work.

4

-

-

... More
Erection, testing and Commissioning of 3 Nos pipe chemical earthing using 20mm dia GI pipe 1.2 m long, as per IS 1161, making earth grid using 50x6mm GI Flat and riser and connecting risers to various equipment, 8 SWG GI wires, GI nuts, bolts & washers etc. complete as per scope of work, approved drawings and technical specifications,

12

-

-

... More
Erection, testing & commissioning of 11/.433 KV DSS With 63 KVA Distribution Transformer As per approved drawing (Feeder Bifurcation Work)

-

-

-

... More
Erection of 9 M long STP/PCC poles with welded steel base plate of Designation 540 SP 32 (IS 2713, Pt I, II, III 1980) - Cement concreting 0.5 cmt. including Excavation of pole pit (of depth 1/6th of pole length) in all type of soil, by providing and installing danger plate, anti-climbing devices (barbed wire), earthing material ( 8SWG GI wire), pole numbering including cement concrete foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) & backfilling of soil etc. as per scope of work, approved drawings and specifications:

16

-

-

... More
Excavation of stay pit in all type of soils and Erection of complete stay set with GI stay wire (7x3.15 mm dia), binding of stay wire, by providing Guy stay insulator (1 Nos.) with all accessories and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) etc. complete as per technical specifications, approved drawings and scope of works.

32

-

-

... More
Erection, testing, commissioning of 11/0.4 KV Distribution Transformer 63 KVA 3 phase Aluminium wound DTR. Pre-fabricated steel items like DC cross arm (100x50x6 mm), back clamps, pole clamp, DO mounting channel (100x50x6 mm), transformer mounting channel (100x50x6 mm), transformer clamping set (50x50x6 mm), transformer belting set ( 50x50x6 mm), earth clamp (50x6mm), MS flat (75x40x6mm) ,Clamp (50 x 6 mm) for LT bus & H.G fuse set. , all MS material must be Hot Dip Galvanized and MS nuts, bolts & washers, hardware with all its accessories, including 11 kV Disc insulator with strain hardware & 11 KV Pin insulator with GI pin with their hardware fittings and Erection of Outdoor mounting type Distribution box made of MS sheet. dust and moisture vermin, weather proof with degree of protection IP 33 as per IS 13947. 1.1 KV XLPE Aluminium Conductor, Stranded, unarmoured cable for connection of transformer LV bushing to Distribution Box and Distribution box to overhead line. including PG Clamps, bi- metallic connectors, hardware with all accessories, AB Switch for Distribution Transformer Substation. Distribution Class Lightening Arrester for DT. Drop Out fuse units (set of 3 units) along with Support Insulators, Base Channel, fuse barrel etc. complete as per technical specification, approved drawings and scope of work.

8

-

-

... More
Erection, testing and Commissioning of 3 Nos pipe chemical earthing using 20mm dia GI pipe 1.2 m long, as per IS 1161, making earth grid using 50x6mm GI Flat and riser and connecting risers to various equipment, 8 SWG GI wires, GI nuts, bolts & washers etc. complete as per scope of work, approved drawings and technical specifications,

24

-

-

... More
Erection, testing & commissioning of 11KV line using ACSR (Rabbit) on 9 mtr Long GI Pole supports with Avg. Span of 45 Meters having cross bracing in each Double pole (Feeder Bifurcation Work)

-

-

-

... More
Survey, route alignment & pole spotting, preparation of survey report and uploading in the web portal after approval of Project Manager for 11 KV line

24

-

-

... More
Excavation of pole pit (of depth 1/6th of pole length) in normal soil as per scope of work, approved drawings and specifications:

504

-

-

... More
Erection of 9 mtr STP (GI) /PCC poles for 11 KV overhead lines by providing and installing danger plate, anti-climbing devices (barbed wire), earthing material (8SWG GI wire), pole numbering including cement concrete foundation or refilling by bolders using cement concreting foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) or/and 200 mm average size bolders mixed with excavated earth etc as per scope of work, approved drawings and specifications:

504

-

-

... More
Stringing of S/C 3- ph, 3-wire, 11 KV line with ACSR Rabbit conductor (Average span 45 meters).This includes all activities i.e. installation of polymer insulators with mounting hardware , stringing of conductor, binding of conductor with pin insulator using preformed insulator binding, mid span jointing, repairing of conductor using repair sleeve if unavidable, fixing of anti climbing device & danger plate on all 2/3/4 Pole structures & road crossing poles, jumpering etc. complete in all respect. This includes supply and installation of repair sleeves, mid span joint, danger plate & anti-climbing device.

24

-

-

... More
Erection, testing & commissioning of Pre-fabricated steel items like V cross arm, top clamp, DC cross arm, bracket, clamps, cross bracings, bracings, strain plate, guarding channels, back clamp, transformer mounting structure, DO mounting channel, Transformer clamping set, bracket, clamps, cross bracings, bracings, strain clamp, guarding channels, back clamp and MS nut, bolts & washers etc as per technical specification, approved drawings and scope of work.

504

-

-

... More
Erection of complete 11KV stay set with GI stay wire (7x3.15 mm dia),Including Excavation of stay pit in all kind of soil , binding of stay wire, by providing Guy stay insulator and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) as per technical specifications, approved drawings and scope of works.

504

-

-

... More
Installation of Strut Pole as per approved drawing including escavation work and all necessary hard ware fittings

24

-

-

... More
Erection, testing & commissioning of earthing arrangement using 8 SWG GI Wire, GI nuts, bolts & washers as per technical specification, approved drawings and scope of work.

504

-

-

... More
Other Works

-

-

-

... More
Erection, testing & commissioning of Capacitor bank 2.4 MVAR as per approved drawing. (Other Works)

-

-

-

... More
Design, Engineering, Manufacturing, Assembly, Inspection, Testing at manufacturer's works before Despatch, Packing, Supply, Delivery at site and subsequent Storage for Providing additional capacitor bank for 2.4 MVAR Auto type substation mounted with all associated equipment like 11 KV VCB , C& R Panel, CTs, 11 KV Substation class LA ,Isolators of approved ratings with earth switch, RVT, Red Oxide/Alluminium painting , 2.5 Sq.mm PVC armoured stranded Cu control cable, protection circuits and equipment , earthing etc. Obtain TSECL approval to carry out the Installation of capacitor bank in existing 33/11 Kv Sub-stations as per TS, Drawing and scope of work . [Consisting of but not limited to the following items, subject to site requirement]

1

-

-

... More
Erection, testing & commissioning of Capacitor bank 3.6 MVAR as per approved drawing. (Other Works)

-

-

-

... More
Design, Engineering, Manufacturing, Assembly, Inspection, Testing at manufacturer's works before Despatch, Packing, Supply, Delivery at site and subsequent Storage for Providing additional capacitor bank for 3.6 MVAR Auto type substation mounted with all associated equipment like 11 KV VCB , C& R Panel, CTs, 11 KV Substation class LA ,Isolators of approved ratings with earth switch, RVT, Red Oxide/Alluminium painting , 2.5 Sq.mm PVC armoured stranded Cu control cable, protection circuits and equipment , earthing etc. Obtain TSECL approval to carry out the Installation of capacitor bank in existing 33/11 Kv Sub-stations as per TS, Drawing and scope of work . [Consisting of but not limited to the following items, subject to site requirement]

2

-

-

... More
Replacement of of 11 kV VCB with CT & CR Panel from existing 11KV VCB & its accessories as per approved drawing. (Other Works)

-

-

-

... More
Replacement of of 11 kV VCB with CT & CR Panel from existing 11KV VCB & its accessories as per approved drawing. (Other Works)

2

-

-

... More
Replacement of 11 KV AB switch 400 A As per approved drawing . (Other Works)

-

-

-

... More
Erection, testing & commissioning of new 11 kV, 3-ph, 400 A, 3 Pin type, Vertical Mounting type, Gang Operated, AB Switch along with Support Insulators, Base Channel, down Pipe, Arcing Horns etc. complete as per technical specifications, scope of works and approved drawings

6

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.