Tripura State Electricity Corporation Limited Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.
Tripura State Electricity Corporation Limited - TSECL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date6 Jan 2024
Closing Date16 Jan 2024
Tender Amount₹ 7,40,905
Costs
EMD
₹ 14,818Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_POWER_45625_1Bid Award Id
ViewTender No
NIT/DGM/ED-DMR/23-24/08Tender Authority
Tripura State Electricity Corporation Limited ViewPurchaser Address
-Website
http://tripuratenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Stay set Complete
48
-
-
Stay wire 7/2.5mm
240
-
-
Stay insulator(LT)
45
-
-
Stay insulator(HT)
3
-
-
M.S. CHANNEL(100x50x50x6) mm Channel
118
-
-
M.S. CHANNEL (75x40x40x6) mm Channel
80
-
-
M.S. ANGLE (65x65x6) mm Angle
48
-
-
MS Angle 50X50X6 mm
423.9
-
-
ACSR (6/1/2.59mm)
5.5
-
-
8 SWG GI wire
270.3
-
-
LT Shackle insulator
178
-
-
Straps with Nuts & Bolts
178
-
-
LT spacer
117
-
-
Febricated clamps of assorted size of MS flat (50 x 6 mm) with double coat of red oxide primercoating
171
-
-
M.S.Nuts & Bolt i/c Washer of assortedsize ISI Marked machine made(ISI marked machine made)
314
-
-
25 KVA, 11KV/0433KV Distribution Transformer
1
-
-
PVC CABLES (SINGLE CORE) 16 mm2
100
-
-
PVC CABLES (SINGLE CORE) 70 mm2
40
-
-
Rewireable Porcelain Cut out 63 Amp
4
-
-
Rewireable Porcelain Cut out 100 Amp
4
-
-
11KV Polymer composite 45 KN Disc Insulator
6
-
-
11KV Disc fittings Up to 7/3.8mm, 2-U Bolt type
6
-
-
11KV Polymer Pin Insulator
6
-
-
LIGHTINING ARRESTOR 9 KV, 5KA Polymeric L/A
3
-
-
11 KV, 200 Amps GOS 3-phase.
2
-
-
11 KV DOF Set, 3-phase
2
-
-
2.5mtr. Long , 40mm dia G.I.Pipe Make: TATA/ JINDAL)
4
-
-
60Kg Salt & 55Kg Charcoal ( For 1 Pit).
4
-
-
Danger plate (HT)
2
-
-
SCHEDULE-B Erection
-
-
-
Erection of 9.00 mtrs length of PCC pole at any kind of soil upto a depth of 1/6th of pole height , i/c excavation of earth , refilling the pit with soil upto the ground level, ramming and making complete in all respect .
3
-
-
Erection of 8.00 mtrs length of PCC pole at any kind of soil upto a depth of 1/6th of pole height , i/c excavation of earth , refilling the pit with soil upto the ground level, ramming and making complete in all respect .
48
-
-
Erection of stay set direct in earth complete with 19mm X 1800mm long stay rod , anchor plate of size 300X300x8 mm , thimble, turn buckle, 7/2.5mm dia GI stranded stay wire and stay insulator etc.with supply of MS clamp, nuts 7 bolts etc as required and making complete in all respect .
48
-
-
Laying and Stringing of ACSR 6/1/2.59 mm dia WEASEL including hoisting and binding etc. Complete as required.
5.4
-
-
Laying & strining of 8SWG GI wire including hoisting & binding etc. Complete as required
2.65
-
-
Spaceing of conductor of single/two/three phase for 2 wire LT line with the help of spacer
117
-
-
MS Angle cross arm bracket of 4 wire upto 1.1 mtr long by 50 x50X6 mm MS Angle
82
-
-
Erection of M.S.Angle Cross-Arm,1.0 to 2.5 Mtr.Long 65 x65 x 6 mm
2
-
-
Erection of M.S.Channel Cross-Arm,0.3 to 1.2 Mtr.Long75 x40 x 40 x 6 mm
2
-
-
Erection of M.S.Channel Cross-Arm,1.3 to 2.8 Mtr.Long75 x40 x 40 x 6 mm
4
-
-
Erection of M.S.Channel Cross-Arm,0.6 to 2.8 Mtr.Long100 x50 x 50 x 6 mm
2
-
-
Erection of M.S.Channel Cross-Arm exceeding 2.8Mtr. Long 100 x50 x 50 x 6 mm
3
-
-
Erection of 11KV Pin insulator along with Pin.
6
-
-
Erection of Disc insulator Set for 11KV line along with necessary fittings
6
-
-
Erection of 9KV,5KA single pole metal oxide gapless type LA , including necessary connection complete as per technical specification
3
-
-
Erection of 11KV DOF unit set of three nos. including necessary connection complete as per technical specification.(Excluding the cost of back clamp, Nuts & Bolts)
2
-
-
Erection of 11KV 200 Amp. GOS unit set of Two nos. including necessary connection complete as per technical specification.(Excluding the cost of back cIamp,Nuts & Bolts)
2
-
-
Installation/Positioning of 11/0.430KV,3-Phase 25KVA of Distribution Transformer on Pole with necessary connections & fitting fixing of all allied accessories components as required for making complete in all respect for energizing.
1
-
-
Providing Three Phase Service Connection with laying PVC cable from nearby Electrical pole to Premises upto 35mtr. in length supported by G.I.Wire,Reel Insulator i/c fitting fixing of Energy Meter as required
1
-
-
Providing protective Sub-Station fencing of approve quality as per technical specification i/c supply of all materials.
1
-
-
LT Shackle insulator with straps nuts & bolts
175
-
-
Earthing with G.I pipe 2.5mtr. Long and 40mm dia, including excavation, refilling with alternate layer of salt & Charcoal as per drawing (excluding supply of G.I.Pipe, Salt & Charcoal, Gi wire, nuts &boIts, etc. as required)
4
-
-
Maintaining adequate clearance from overhead live conductors by Trimming of tree branches/jungle cutting/bamboo for Way Leaves
8.5
-
-
Febrication of MS Channel/angle
690.95
-
-
Re-Stringing of ACSR conductors
0.85
-
-
Re-Stringing of 8 SWG GI Wire
1.45
-
-
Re-adjustment of stay set complete
8
-
-
Numbering of errected poles & DT by Black japan paint on yellow background
47
-
-
Erection of Danger plate on OH lines (11KV/415 volts)
2
-
-
SCHEDULE-C Carriage of 11/0.430, 3-Phase 25KVA by Mechanical Transport from the Site /Store/Worshop to working site Vis-a-vis including loading, unloading and placing on base, as required,a) Upto the lead range 25KM From Sub Division Store to site
-
-
-
a) Upto the lead range 25km
1
-
-
SCHEDULE-D Carriage of 9.0mtr. Length of PCC poles by Mechanical Transport from the factory / Sub-divisional store to working site Vis-à-vis i/c. loading, unloading and stacking as required :-
-
-
-
a) Upto the lead range 25 KM For maximum 04(four) poles
3
-
-
SCHEDULE-E Carriage of 8.00 mtr. Length of PCC poles by Mechanical Transport from the factory / Sub-divisional store to working site Vis-à-vis i/c. loading, unloading and stacking as required :-
-
-
-
a) Upto the lead range 25 KM (for max. 5nos. Poles)
5
-
-
b) Beyond 05(five) poles
43
-
-
SCHEDULE-F Carriage of G.O.S., D.O.F. L. A. etc. by Mechanical Transport from factory /the Sub-Divisional store yard to working site Vis-à-vis i/c. loading, unloading and stacking as required :-
-
-
-
a) Upto the lead range 25 KM
1
-
-
SCHEDULE-G Carriage of materials such as cable, AAC, AAAc, ACSR, GI wire, cross-arm, stay set, insulators etc. by Mechanical Transport from factory / the Sub-Divisional store yard to working site Vis-à-vis i/c. loading, unloading and stacking as required :-PCC poles by Mechanical Transport from the Sub-Divisional store yard working site Vis-à-vis i/c. loading, unloading and stacking as required :-
-
-
-
a) Upto the lead range 25 KM
10
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements