Tripura Power Generation Limited Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.
Tripura Power Generation Limited - TSECL Tender
Energy, Oil and Gas
Eprocure
Opening Date9 Mar 2023
Closing Date30 Nov 2023
Tender AmountRefer Documents
Costs
EMD
₹ 7,45,82,800Document Cost
₹ 39,500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_TPGLA_36874_1Bid Award Id
ViewTender No
GM(TECH)/TPGL/AGT/2022-23/03Tender Authority
Tripura Power Generation Limited ViewPurchaser Address
-Website
http://tripuratenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Steam Turbine unit including all associated auxiliary systems, Generator & Generator Auxiliaries
1
-
-
Air cooled condenser and vacuum raising equipment
1
-
-
Steam and feed cycle equipment including Condensate Extraction
1
-
-
Compressed air system
1
-
-
Auxiliary Cooling System:
-ACW Pumps along with drives
-Air cooled heat exchanger.
-Complete piping including all valves, instruments etc
-Total price ACW System
1
-
-
Plant water system including Bore well pumps, auxiliaries, piping, valves, pretreatment plant, reservoir etc.
1
-
-
Plant Water Pumps and piping system
1
-
-
Closed cycle cooling DM Water System
1
-
-
Fire protection system
1
-
-
Ventilation and Air Conditioning System
1
-
-
Fuel gas system including gas booster compressor
1
-
-
Demineralized plant, storage, laboratory equipment and distribution system
1
-
-
Workshop Equipment
1
-
-
Any other item not included in the above but are required for completion of the plant as per Specification
1
-
-
Electrical
-
-
-
Generator Isolated Phase busduct for GTG including GCB Tap-off connections
1
-
-
Generator Isolated Phase busduct for STG
1
-
-
Generator Circuit breaker (GCB) for GTG
1
-
-
Generator Transformer for GTG Unit
1
-
-
Generator Transformer for STG
1
-
-
132 KV substation equipment and accessories, interconnection with existing 132 KV switchyard including modification of existing 132 kV switchyard
1
-
-
Station Auxiliary Transformer (SAT)
1
-
-
Neutral Grounding Resistor (NGR) for SAT
1
-
-
6600V Station Switchgear
1
-
-
LT Auxiliary Transformer
1
-
-
LT Busduct
1
-
-
415V Switchgears
1
-
-
415V Motor Control Centres& Distribution boards
1
-
-
D.C. System
1
-
-
Uninterruptible Power Supply system (UPS)
1
-
-
Protective Relay Panels for Generator GT & SAT
1
-
-
Emergency DG System
1
-
-
Emergency Gas Engine System
1
-
-
Plant Illumination System
1
-
-
Plant Intercommunication system
1
-
-
Plant Grounding and Lightning protection system
1
-
-
Cable trays and accessories
1
-
-
Power and control cables
1
-
-
Misc. Panels
1
-
-
Electric Laboratory Equipment
1
-
-
Any other item not included in the above but are required for completion of the plant as per Specification
1
-
-
Instrumentation & Control (I&C)
-
-
-
Measuring Instruments - Primary Instrumentation including all types of measuring elements, transmitters, switch devices, local indicators/gauges etc
1
-
-
Measuring instruments - Secondary Instrumentation including recorders, indicators, totalizers/ counters integrators, ammeters etc
1
-
-
Measuring instruments - Vibration Monitoring Systems
1
-
-
Distributed Control System for the main plant (HRSG, STG and their auxiliaries, BOP System etc.)
1
-
-
Central control room panels/desks/ consoles/local panels fully assembled and wired
1
-
-
Control valves with accessories
1
-
-
Steam and water Analysis system (SWAS) complete with coolers, chiller system, valves and analysers for various measuring parameters etc
1
-
-
Gas Analysis system complete with O2, CO, SOx, NOx analysers and continuous emission monitoring system
1
-
-
Instrumentation cables (including special cables, compensating cables, pre-fabricated cables) and other field construction material/devices for I&C
1
-
-
Process connection and piping/tubing including instrument valve, blow-down, valves, valve manifolds, fittings etc
1
-
-
Any other items not included in the preceeding items but will be required for complete requirement of the plant as per Specification.
1
-
-
Special Tools and Tackles
1
-
-
Consumables and consumable Spare Parts
1
-
-
Mandatory Spare Parts as per Form OTH-1
1
-
-
Others ( Bidders to list as applicable)
1
-
-
Evaluation Notes How It Works ?
Potential Partner