Tripura Power Generation Limited Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.
Tripura Power Generation Limited - TSECL Tender
Energy, Oil and Gas
Eprocure
Opening Date9 Mar 2023
Closing Date30 Nov 2023
Tender AmountRefer Documents
Costs
EMD
₹ 7,45,82,800Document Cost
₹ 39,500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_TPGLA_36874_1Bid Award Id
ViewTender No
GM(TECH)/TPGL/AGT/2022-23/03Tender Authority
Tripura Power Generation Limited ViewPurchaser Address
-Website
http://tripuratenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Steam Turbine unit including all associated auxiliary systems, Generator & Generator Auxiliaries
1
-
-
... More
Air cooled condenser and vacuum raising equipment
1
-
-
... More
Steam and feed cycle equipment including Condensate Extraction
1
-
-
... More
Compressed air system
1
-
-
... More
Auxiliary Cooling System:
-ACW Pumps along with drives
-Air cooled heat exchanger.
-Complete piping including all valves, instruments etc
-Total price ACW System
1
-
-
... More
Plant water system including Bore well pumps, auxiliaries, piping, valves, pretreatment plant, reservoir etc.
1
-
-
... More
Plant Water Pumps and piping system
1
-
-
... More
Closed cycle cooling DM Water System
1
-
-
... More
Fire protection system
1
-
-
... More
Ventilation and Air Conditioning System
1
-
-
... More
Fuel gas system including gas booster compressor
1
-
-
... More
Demineralized plant, storage, laboratory equipment and distribution system
1
-
-
... More
Workshop Equipment
1
-
-
... More
Any other item not included in the above but are required for completion of the plant as per Specification
1
-
-
... More
Electrical
-
-
-
... More
Generator Isolated Phase busduct for GTG including GCB Tap-off connections
1
-
-
... More
Generator Isolated Phase busduct for STG
1
-
-
... More
Generator Circuit breaker (GCB) for GTG
1
-
-
... More
Generator Transformer for GTG Unit
1
-
-
... More
Generator Transformer for STG
1
-
-
... More
132 KV substation equipment and accessories, interconnection with existing 132 KV switchyard including modification of existing 132 kV switchyard
1
-
-
... More
Station Auxiliary Transformer (SAT)
1
-
-
... More
Neutral Grounding Resistor (NGR) for SAT
1
-
-
... More
6600V Station Switchgear
1
-
-
... More
LT Auxiliary Transformer
1
-
-
... More
LT Busduct
1
-
-
... More
415V Switchgears
1
-
-
... More
415V Motor Control Centres& Distribution boards
1
-
-
... More
D.C. System
1
-
-
... More
Uninterruptible Power Supply system (UPS)
1
-
-
... More
Protective Relay Panels for Generator GT & SAT
1
-
-
... More
Emergency DG System
1
-
-
... More
Emergency Gas Engine System
1
-
-
... More
Plant Illumination System
1
-
-
... More
Plant Intercommunication system
1
-
-
... More
Plant Grounding and Lightning protection system
1
-
-
... More
Cable trays and accessories
1
-
-
... More
Power and control cables
1
-
-
... More
Misc. Panels
1
-
-
... More
Electric Laboratory Equipment
1
-
-
... More
Any other item not included in the above but are required for completion of the plant as per Specification
1
-
-
... More
Instrumentation & Control (I&C)
-
-
-
... More
Measuring Instruments - Primary Instrumentation including all types of measuring elements, transmitters, switch devices, local indicators/gauges etc
1
-
-
... More
Measuring instruments - Secondary Instrumentation including recorders, indicators, totalizers/ counters integrators, ammeters etc
1
-
-
... More
Measuring instruments - Vibration Monitoring Systems
1
-
-
... More
Distributed Control System for the main plant (HRSG, STG and their auxiliaries, BOP System etc.)
1
-
-
... More
Central control room panels/desks/ consoles/local panels fully assembled and wired
1
-
-
... More
Control valves with accessories
1
-
-
... More
Steam and water Analysis system (SWAS) complete with coolers, chiller system, valves and analysers for various measuring parameters etc
1
-
-
... More
Gas Analysis system complete with O2, CO, SOx, NOx analysers and continuous emission monitoring system
1
-
-
... More
Instrumentation cables (including special cables, compensating cables, pre-fabricated cables) and other field construction material/devices for I&C
1
-
-
... More
Process connection and piping/tubing including instrument valve, blow-down, valves, valve manifolds, fittings etc
1
-
-
... More
Any other items not included in the preceeding items but will be required for complete requirement of the plant as per Specification.
1
-
-
... More
Special Tools and Tackles
1
-
-
... More
Consumables and consumable Spare Parts
1
-
-
... More
Mandatory Spare Parts as per Form OTH-1
1
-
-
... More
Others ( Bidders to list as applicable)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements