Secondary Education Department Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.
Costs
EMD
₹ 31,080Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_OSDDS_52463_1Tender No
28/EE/ENGG.CELL/SAMAGRA/24-25Tender Authority
Secondary Education Department ViewPurchaser Address
-Website
http://tripuratenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and
shuttering --All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded stoneaggregate 20 mm nominal size)
10.06
99294
9872.1
... More
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-
-All work upto plinth level: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
21.63
237348
10974.6
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars,
piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing
and reinforcement- 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) cum
2.48
29185
11791.9
... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five levelexcluding the cost of centring, shuttering, finishing and reinforcement-1:1.5:3( 1 Cement: 1.5 fine sand :3 graded stone aggregate 20 mm nominal size)
18.16
219761
12104.7
... More
Centering shuttering including struttings, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. for mass
concrete with timber plank
16.8
4518
268.9
... More
Centering shuttering including struttings, propping etc. and removal of form work for:Columns, Pillars, Piers, Abutments, Posts and Struts with wooden plank
40.04
18510
462.3
... More
Centering shuttering including struttings, propping etc. and removal of form work for:Lintels, beams, plinth beams, girders, bressumers and
cantilevers with wooden plank
110.26
35028
317.7
... More
Centering shuttering including struttings, propping etc. and removal of form work for:Weather shade, Chajjas, corbels etc., including edges.
5.43
2268
417.7
... More
Centering shuttering including struttings, propping etc. and removal of form work for:Suspended floors, roofs, landings, balconies and access
platform with timber planks
82.86
38470
464.3
... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or
more
5741.18
448960
78.2
... More
First class brick work in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:2 ( 1 cement : 2 fine sand ). Brick work in foundation plinth
12.18
115851
9511.6
... More
Half brick masonry work with first class bricks in
foundation and plinth including cost of all materials as
required complete:-( 1 cement : 4 fine sand ).
56.64
67283
1187.9
... More
Providing and fixing 1mm thick M.S. sheet door with
frame of 40x40x6mm angle iron and 3mm M.S. gusset plates at the junctions and corners, & with cleats with bolts & nuts, rivets, locking arrangement, handles, hooks & eyes, pinlets including embedding in cement concrete of required grade for fixing in position, all necessary fittings, including applying a priming coat of approved steel primer etc. complete as required:- Using M.S. angels 40x40x6 mm for diagonal braces.
15.84
56194
3547.6
... More
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or
round bars etc. all complete. Fixed to steel windows by welding.
185
22626
122.3
... More
Providing and laying cement concrete 1:2:4 (1 cement : 2 fine sand : 4 graded stone aggregate) flooring finished with a floating coat of neat cement including cement slurry, rounding of edges and strips etc. complete.40 mm thick with 20 mm stone aggregate
55.34
30669
554.2
... More
12 mm cement plaster of mix:Cement mortar 1:4 (1 cement : 4 fine sand)
107.41
18775
174.8
... More
15mm cement plaster on the rough side of single or half brick wall of mix:Cement mortar 1:4 (1 cement : 4 fine sand)
99.65
20269
203.4
... More
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade
[Payment shall be made after submission of Test Certificate issued by the Manufacturer] : New work ( two or more coats) over and including water
thinnable priming coat with cement primer.
107.41
10279
95.7
... More
Finishing walls with acrylic smooth exterior paint of required shade of approved brand and manufacture
[Payment shall be made after submission of Test Certificate issued by the Manufacturer] :New work ( two or more coats applied @ 1.67 litre/10 sqm
over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
99.65
11899
119.4
... More
Finishing with Epoxy paint ( two or more coats) of approved brand and manufacture at all locations
prepared and applied as per manufacturer's specification including appropriate priming coat,
preparation of surface etc. complete [Payment shall be made after submission of Test Certificate issued by the Manufacturer]. On steel work
247.68
32397
130.8
... More
Neat Cement Punning
15.87
716
45.1
... More
Supplying and fitting fixing of Green Chalk Board of size 1200 x 2400 mm as per specification.
1
8865
8865
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements