Public Works Department Tender

... More
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date20 Sep 2023
Closing Date13 Oct 2023
Tender Amount₹ 2,00,50,735 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and placing gunny/ polythene (of minimum wall thickness of 500 micron) bags filled with sand (of minmum qty of 0.034 cum) and properly manually stitched to avoid any leakage of sand as per specification.

508

17170

33.8

... More
Granular Sub-base with Well Graded Material (Table 400.1 ) using Jhama Brick Aggregate (A) By Mix in Place Method Construction of granular sub-base by providing well graded material (53 mm to 0.075 mm Jhama Brick Aggregate , Grading-I), spreading in uniform layers with tractor with attachments on prepared surface, mixing by mix in place method with rotavator at OMC, applying and brooming sand to fill up the interstices of coarse aggregate, watering and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD Technical Specification Clause 401. (i) For Grading - I Material

105

461916

4399.2

... More
Water Bound Macadam Sub-Base / Base Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 KN static roller / vibratory roller in stages to proper grade and camber, applying and brooming, stone screening and binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per MoRT&H Technical Specification Clause 404. WBM Grading III A )By Manual Means

405.56

3518030

8674.5

... More
Prime Coat Providing and applying primer coat bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.6 kg/sqm using mechanical means as per MoRT&H Technical Specification clause 502.

5407.5

174121

32.2

... More
Tack Coat Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.20kg/sqm on the prepared bituminous /granular surface cleand with hydraulic broom as per MORT&H technical specification clause 503.

7173.7

77475

10.8

... More
Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects. B. Grading II With Viscosity graded Bitumen of VG-30

376.61

5895001

15652.8

... More
Bituminous Concrete Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 509 complete in all respects. B. Grading-II. (I) With Viscosity Graded Bitumen of VG-30

215.21

3797079

17643.6

... More
Road side Pucca Drains Construction of road side pucca drain with M10 (1:3:6 with jhama brick aggregate) to specified lines, grades, levels and dimensions as per approved design and MoRD Technical Specification Clause 307, 1606. Excavated material to be used in embankment at site. (including centering, shuttering, etc. but excluding reinforcement) D. U shaped drain (top clear width 600 mm, bottom clear width 600 mm and clear depth of 600 mm) I. In Ordinary Soil

350

1447320

4135.2

... More
Excavation for Structures Earthwork in excavation for structures as per drawing and MoRT&H technical specifications Clause 304 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil A. By manual means (i) Upto 3 m depth

697.5

238335

341.7

... More
Sand Filling in foundation trenches as per drawing & MoRT&H technical specification clause 304.

69.75

59880

858.5

... More
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days as per drawings & MoRT&H technical specifications Clauses 2100. (including centering, shuttering, staging etc. but excluding reinforcement)

65.1

584259

8974.8

... More
Plain/reinforced cement concrete in substructure complete including formwork as per drawings & MoRT&H technical specification Clauses 1500, 1700, 2200. (including centering, shuttering, staging etc. but excluding reinforcement) (V) RCC M20 Grade a. upto 5 m height case-I : Using Concrete mixer

235.6

2486922

10555.7

... More
Supplying, fitting and placing un-coated Twisted steel / deformed bars reinforcement in substructure complete as per drawing and MoRT&H technical specifications Clauses 1600, 2200

11.78

804717

68312.2

... More
Cement concrete blocks (size 0.5x0.5x0.5 m) roviding and laying of apron with cement concrete blocks of size 0.5 x 0.5 x 0.5 m cast in-situ and made with nominal mix of M 15 grade cement concrete with a minimum cement content of 250 kg/cum as per IRC: 21- 2000 as per drawings & MoRT&H technical specifications Clauses 2503.

47.63

452885

9508.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.