Public Works Department Tender

... More
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.

Public Works Department - PWD Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date31 Jan 2025
Closing Soon13 Feb 2025
Tender Amount₹ 24,05,338 
Notes
Download

Costs

Summary

Urgent Fdr Of Adhibasighat Hpli Canal Under Dasda Rd Block Under Wr Sub-division, Kanchanpur North Tripura During The Year 2024-25-sh- Repairing Of Adhibasighat Canal (group-i).

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Removing morter from brick and cleaning bricks in/c stacking bricks & disposal rubbish with all lifts and upto a lead of 50 m etc. Complete as per direction of the Engineer-in-charge:- In cement mortar. 1x50x2x20 =2000 1x50x2x20 =2000 1x50x2x15 = 1500 Total = 5500 nos Ref. No.13/EE/WRD-VII/PTL/2021-22

5500

2

15400

... More
Labour Charge for fiers class brick Work in foundation & plinth in/c cost of all binding materials but excluding the cost of bricks ( brick will be supplied by the Deptt. At free of cost ) as required complete. 1x5x15.00x0.25x0.75 =14.062 Cum i ) In cement mortar 1:4 ( 1 cement ; 4 fine sand ). Ref. No.13/EE/WRD-VII/PTL/2021-22

14.06

1186

16691

... More
6.1 ) First class brick work in foundation and plinth including cost of all materials as required complete:- 6.1.3 ) In cement mortar 1:4 ( 1 cement : 4 fine sand ). 1x12x8.00x0.25x0.75= 18.00 Cum. 1x13x5.00x0.25x.0.75 = 12.18 Cum Total = 30.18 Cum SOR'2023 PWD Building

30.18

9845

297128

... More
6.10 ) Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete:- 6.10.3 ) In cement mortar 1:4 ( 1 cement : 4 fine sand ). 1x5x10.00x0.75 = 37.50 Sqm 1x10x18.00x0.75 = 135.00 Sqm Total = 172.50 Sqm SOR'2023 PWD Building

172.5

1311

226286

... More
12.1 ) 12 mm cement plaster of mix 2.1.2 ) Cement mortar 1:4 (1 cement : 4 fine sand) 1x20x30.00x0.90 = 540.00 Sqm 1x15x0.90 = 13.50 Sqm Total = 553.50 SOR'2023 PWD Building

553.5

224

124095

... More
12.10 ) Neat cement punning. 1x20x30.00x0.90 = 540.00 Sqm 1x15x0.90 = 13.50 Sqm Total = 553.50 Sqm SOR'2023 PWD Building

553.5

56

31439

... More
10.6 ) Providing and laying cement concrete 1:2:4 (1 cement: 2 fine sand : 4 graded well burnt brick aggregate) flooring finished with a floating coat of neat cement including cement slurry, rounding of edges and strips and cost of glass strips etc. all complete as per direction of Engineerin-charge. 10.6.1 ) 40mm thick. 1x25x30.00x1.20=900.00 Sqm SOR'2023 PWD Building

900

614

552870

... More
6.7 ) Desilting of earth, silt, garbage, slush and other soild deposits etc. from the existing canal mannually to bring it to the required section for smooth flow in the canal in/c disposal of excavated material outside of the canal with a lead of 50 m. and all lifts in/c executed of work in or under water, liquid mud and under foul conditions in/c the cost of taking care of canal section. Dewatering of stagnent or flowing or seepage water/sludge/liquid marsy entering into the canal from any sources as required for satisfactory execution of work in/c taking out the excavated material outsidethe canal as per directions of Engineer-in-charge.Disposal of excavated materials, such as earth, slit, garbage, slush and other soild deposits etc. to be deposited and properly levelled over the canal embankment. 1x60x30.00x1.20x1/4 ( 0.30+0.25+0.40+0.35) Total = 702 Cum SOR'2023 PWD WR

702

325

228782

... More
4.1 ) Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: 4.1.7 ) 1:4:8 ( 1 Cement: 4 fine sand : 8 graded stone aggregate 40 mm nominal size) 1x25x30.00x1.20x0.075= 67.50 Cum

67.5

9960

672347

... More
5.14 Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but, excluding cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 fine sand : 3 graded stone aggregate 20 mm nominal size) 1x15x1.58x1.50x0.10 = 3.555 Cum SOR'2023 PWD Building

3.56

16954

60273

... More
5.19 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.19.4 Thermo-Mechanically Treated bars of grade Fe-500D or more . SOR'2023 PWD Building

586.58

103

60945

... More
13.30 ) Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sqm and under including cutting the patch in proper shape and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground with all leads and lifts including finishing even and smooth and curing complete as per direction of the Engineer- in- charge:- 13.30.2 With cement mortar 1:4 ( 1 cement : 4 fine sand ). 1x20x4.20x0.75 = 63.00 Sqm 1x15x3.50x0.75 = 39.37 Sqm 1x50x3.00x0.75 = 112.50 Sqm Total = 214.87 Sqm SOR'2023 PWD Building

214.87

293

63150



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.