Public Works Department Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.
Public Works Department - PWD Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date18 Nov 2023
Closing Date7 Dec 2023
Tender Amount₹ 45,23,604
Costs
EMD
₹ 90,472Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_CEDWS_43987_1Bid Award Id
ViewTender No
103/EE/DWS/DMN/2023-24Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.tripura.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying in position cement specified grade excluding the cost of centring and concrete of shuttering --All work up to plinth level:
1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 40 mm nominal size)
11.58
107681
9295.7
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centring, shuttering, finishing and reinforcement-1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
39.9
530955
13305.8
... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centring, shuttering, finishing and reinforcement. 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
10.85
147365
13584.5
... More
Cantering shuttering including struttings, propping etc. and removal of form work for:
-
-
-
... More
i) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. using shuttering ply.
1596.16
791855
496.1
... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank
136.83
53501
391
... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more
4632
481265
103.9
... More
Boring/drilling bore well of required dia for casing/strainer pipe, by suitable method prescribed in IS:2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire & running charges of all equipment's, tools, plants & machineries required for the job, all complete as per direction of Engineer-in charge, up to 90 metre depth below ground level. All types of soil 300 mm dia
576
354067
614.7
... More
Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS:12818, including required hire and labour charges fittings & accessories etc. all complete, for all depths, as per direction of Engineer -in-charge. 100 mm nominal size dia
424
283826
669.4
... More
Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well screen(RMS) pipes of with ribs, conforming to IS:12818, including required hire and labour charges fittings & accessories etc. all complete, for all depths, as per direction of Engineer -in-charge. 100 mm nominal size dia
152
106780
702.5
... More
Supplying, filling, spreading & levelling stone boulders of size range 5 cm to 20 cm in recharge pit in the required thickness for all leads & lifts all complete as per direction of Engineer-in-charge.
48.06
253047
5264.8
... More
Supplying, filling, spreading & levelling stone boulders of size range 5 mm to 10 mm in the recharge pit over the existing layer of boulders in required thickness for all leads & lifts all complete as per direction of Engineer-in-charge.
42.4
215087
5072.8
... More
Supplying, filling, spreading & levelling coarse sand of size range 1.5 mm to 2 mm in recharge pit over gravel layer for all leads & lifts all complete as per direction of Engineer-in-charge.
56.54
286836
5072.8
... More
Gravel packing in tubewell construction in accordance with IS:4097, including providing gravel fine/medium/coarse in required grading & sizes as per actual requirement all complete as per direction of Engineer-in-charge.
27.14
148602
5476.2
... More
First class brick work in foundation and plinth including cost of all materials as required complete:-
In cement mortar 1:6 ( 1 cement : 6 fine sand ).
60.96
580047
9515.2
... More
Excavating trenches of required width for pipes, cables etc. including excavation for sockets, dressing of sides where required, ramming of bottoms, depth up to 1500 mm (slope-1 in 200)including getting out the excavated soil and backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. and disposing of surplus excavated soil with all required leads as per Chapter - 2 of CPWD specification and direction of the Engineer - in - charge. A) For UPVC pipes in new work (a) In all kind of Soils
For pipes exceeding 90 mm dia but not
exceeding 300 mm dia
64
6810
106.4
... More
Providing, fixing and laying rigid UPVC pipes conforming to IS : 4985 jointing with couplers, of same class conforming to IS : 10124 ( Pt-II ) with solvent cement conforming to IS : 14182 including testing of joints complete ( but excluding the cost of specials like bend, tees etc. which will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge.
A. Class - 3 ( working pressure 6.0 kg / cm2) i) 140 mm OD
64
39219
612.8
... More
Providing and fixing of UPVC end cap/well cap suitable for UPVC 'CM' casing or ' CS' casing of 'RS' pipes as per specification and direction of the Engineer-in-charge. 100 mm dia
64
35866
560.4
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements