Public Works Department Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.

Public Works Department - PWD Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date28 Nov 2023
Closing Date18 Dec 2023
Tender Amount₹ 45,23,103 
Notes
Download

Costs

Summary

Ground Water Recharge Activities Under Jal Jeevan Mission

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement specified grade excluding the cost of centring and concrete of shuttering --All work up to plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 40 mm nominal size)

11.52

107086

9295.7

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centring, shuttering, finishing and reinforcement-1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)

39.9

530901

13305.8

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centring, shuttering, finishing and reinforcement. 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)

10.85

147365

13584.5

... More
Cantering shuttering including struttings, propping etc. and removal of form work for:

-

-

-

... More
i) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. using shuttering ply.

1596.16

791855

496.1

... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank

136.83

53501

391

... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more

4632

481265

103.9

... More
Boring/drilling bore well of required dia for casing/strainer pipe, by suitable method prescribed in IS:2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire & running charges of all equipment's, tools, plants & machineries required for the job, all complete as per direction of Engineer-in charge, up to 90 metre depth below ground level. All types of soil 300 mm dia

576

354067

614.7

... More
Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS:12818, including required hire and labour charges fittings & accessories etc. all complete, for all depths, as per direction of Engineer -in-charge. 100 mm nominal size dia

424

283826

669.4

... More
Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well screen(RMS) pipes of with ribs, conforming to IS:12818, including required hire and labour charges fittings & accessories etc. all complete, for all depths, as per direction of Engineer -in-charge. 100 mm nominal size dia

152

106780

702.5

... More
Supplying, filling, spreading & levelling stone boulders of size range 5 cm to 20 cm in recharge pit in the required thickness for all leads & lifts all complete as per direction of Engineer-in-charge.

48.1

253216

5264.8

... More
Supplying, filling, spreading & levelling stone boulders of size range 5 mm to 10 mm in the recharge pit over the existing layer of boulders in required thickness for all leads & lifts all complete as per direction of Engineer-in-charge.

42.4

215087

5072.8

... More
Supplying, filling, spreading & levelling coarse sand of size range 1.5 mm to 2 mm in recharge pit over gravel layer for all leads & lifts all complete as per direction of Engineer-in-charge.

56.54

286816

5072.8

... More
Gravel packing in tubewell construction in accordance with IS:4097, including providing gravel fine/medium/coarse in required grading & sizes as per actual requirement all complete as per direction of Engineer-in-charge.

27.14

148602

5476.2

... More
First class brick work in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:6 ( 1 cement : 6 fine sand ).

60.96

580047

9515.2

... More
Excavating trenches of required width for pipes, cables etc. including excavation for sockets, dressing of sides where required, ramming of bottoms, depth up to 1500 mm (slope-1 in 200)including getting out the excavated soil and backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. and disposing of surplus excavated soil with all required leads as per Chapter - 2 of CPWD specification and direction of the Engineer - in - charge. A) For UPVC pipes in new work (a) In all kind of Soils For pipes exceeding 90 mm dia but not exceeding 300 mm dia

64

6810

106.4

... More
Providing, fixing and laying rigid UPVC pipes conforming to IS : 4985 jointing with couplers, of same class conforming to IS : 10124 ( Pt-II ) with solvent cement conforming to IS : 14182 including testing of joints complete ( but excluding the cost of specials like bend, tees etc. which will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge. A. Class - 3 ( working pressure 6.0 kg / cm2) i) 140 mm OD

64

39219

612.8

... More
Providing and fixing of UPVC end cap/well cap suitable for UPVC 'CM' casing or ' CS' casing of 'RS' pipes as per specification and direction of the Engineer-in-charge. 100 mm dia

64

35866

560.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.