Public Works Department Tender
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.
Costs
EMD
₹ 19,258Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_CEDWS_33934_1Bid Award Id
ViewTender No
50/EE/PWD(DWS)/AMB/2022-23Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.tripura.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cutting holes upto 30x30 cm in walls including making good the same :
With 1st class bricks.
10
-
304.6
... More
Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush as required as per direction of the Engineer-in-charge.
The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a
width of 0.50mm. The work shall be carried out all
complete as per specification and the direction of the
Engineer-in-charge. The product performance shall carry guaranteed for 10 years against any leakage.
ii) For horizontal surface one coat @1.10 kg per sqm.
50.24
-
506.3
... More
Grading roof for water proofing treatment complete as required as per direction of the Engineer-in-charge with :
i) Cement concrete 1:2:4 (1 cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
3.77
-
10554.1
... More
Providing and fixing on wall face unplasticised Rigid PVC rain water, soil, waste & vent pipes (working pressure 4 kg / cm2) conforming to IS : 13592 Type A including jointing with seal ring conforming to IS :5382 leaving 10 mm gap for thermal expansion:
i) Single socketed pipe - 110 mm OD
10
-
268.5
... More
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture
371.96
-
98.1
... More
Finishing walls with acrylic smooth exterior paint of required shade of approved brand and manufacture on old work ( one or more coats ) including preparation of surface as required complete as per direction of the Engineer in charge.
3833.24
-
59.7
... More
Applying one coat of water thinnable cement primer of approved brand and manufacturer on wall surface complete.
Water thinnable cement primer
333.24
-
37.5
... More
Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2mm at 100 mm centre to centre and braced with flat iron diagonals 20x5mm size with top and bottom rail of T-iron 40x40x6mm with 40mm dia. steel pulleys & with riveted bolts, nuts, locking arrangement, stoppers, handles, hold fast/anchor bolt including embedding in cement concrete of required grade for fixing in position, all necessary fittings, including applying a priming coat of approved steel primer etc. complete as required.
4.14
-
5836
... More
Providing corrugated G.S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
i) 0.63mm thick with zinc coating not less than 275gm/m2
42
-
859.9
... More
First class brick work in foundation and plinth including cost of all materials as required complete:
i) In cement mortar 1:4 ( 1 cement : 4 fine sand )
0.5
-
8888.4
... More
Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete:-
i) In Cement mortar 1:4 ( 1 cement : 4 fine sand )
20
-
1187.9
... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.In all kinds of soil.
20
-
134.9
... More
Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.
1
-
887.5
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level: 1:2:4 (1 cement: 2 fine sand:4 graded well burnt brick aggregate 20 mm nominal size)
1
-
9306.1
... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level.Thermo-Mechanically Treated bars/ Cold twisted deformed steel bars.
50
-
78.2
... More
Centering shuttering including struttings, propping etc. and removal of form work for:
Foundations, footings, bases for columns etc. for mass concrete with timber plank
10
-
268.9
... More
15 mm cement plaster on the rough side of single or half brick wall of mix. 1:4 (1 cement: 4 fine sand)
30
-
203.4
... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
2000
-
7
... More
Neat cement punning.
30
-
45.1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements