Pradhan Mantri Gram Sadak Yojana Tender

... More
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date27 Mar 2025
Closing Date17 Apr 2025
Tender Amount₹ 6,23,92,835 
Notes
Download

Costs

Summary

Premtala To Mulyarampara Including One Long Span Bridge (length-2.06 Km) (package No. Tr-03-170) (link No. L024) Under Dasda Block

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(A) by Mechanically

-

-

-

... More
(I)in area of non thorny jungle

1.65

32867

54232

... More
Setting out (As per drawing enclosed) with reference pillars on both sides of the formation width burjes @ 50m interval using PCC with jhama brick aggregate for all class of soil including marking of centre line, setting out curves and recording of levels etc.

-

-

-

... More
For all classes of soil.

2.06

59789

123167

... More
Compacting orginal ground supporting embankment.

-

-

-

... More
Loosening, leveling and compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150mm, mixed with water at OMC and than compacted by rolling so as to achieve minimum dry density as given in tables 300.1 and 300.2 for embankment construction as per technical specification clause 301.4.1.

2932.5

18

55131

... More
Construction of Embankment with material obtained from road way cutting

-

-

-

... More
Construction of Embankment with approved materials deposited at site from Roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5

-

-

-

... More
For spreading beyond 100 m

4670.75

66

312006

... More
For spreading within 100 m

2001.75

48

97485

... More
Excavation in cutting in soil by manual means with lead upto 50.0m.

-

-

-

... More
Excavation in road way cutting in soil by using manual means for carrying of cut earth to Embankment site with a lifts and lead upto 50.0m as per technical specification clause 302.3.

12198

226

2756748

... More
Excavation in soil with dozer with lead upto 100m.

-

-

-

... More
Excavation for roadway in soil by mechanical means with dozer including cutting and pushing the earth to site of embankment upto a distance of 100m, including trimming bottom and side slope in accordance with requirements of lines, grades and cross sections as per technical specification clause 302.3.

36594.6

67

2451838

... More
Excavation in soil using hydraulic Excavator and Tippers with disposal upto 1000m.

-

-

-

... More
Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment location with a lift and lead upto 1000m as per technical specification clause 302.3.

85387.2

36

3099555

... More
Construction of Subgrade and earthen shoulder

-

-

-

... More
Construction of subgrade and earthen shoulder with approved materials obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead 1000 m as per Technical specification Clause303.1.

5108.5

179

918508

... More
Surface drains

-

-

-

... More
Construction of unlined surface drains of average cross sectional area 0.4 sqm in ordinary soil to specified lines, grades, levels and dimensions. Excavated material to be used in Embankment with a lift upto 3m and lead of 50m ( average lead 25m ) as per technical specification clause 307.

-

-

-

... More
( I ) Surface Drains in Ordinary soil.

-

-

-

... More
( A ) Mechanical means.

470

21

9964

... More
Road side Pucca Drain

-

-

-

... More
Construction of Road side pucca drain with M10 ( 1: 3 : 6 with jhama Brick aggregate ) to specified lines, grades, levels and dimensions as per approved design and technical specification Clause 307, 1606. Excavated material to be used in embankment at site.

-

-

-

... More
( B ) Trapezoidal drain ( top clear width 600mm, bottom clear width 300mm and clear depth of 400mm.

-

-

-

... More
( i ) In ordinary soil.

1800

3064

5516280

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, dewatering, construction of shoring, shuttering & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
Ordinary Soil

-

-

-

... More
Upto 3 m depth

272

482

131131

... More
Brick masorny work in cement mortar in foundation completed excluding pointing & plastering as per drawing & MoRD technical specifications Clauses 600, 1202 & 1203

-

-

-

... More
Brick masonry in 1:4 cement mortar

257

8600

2210329

... More
(iii)Plastering with cement mortar (1:4) 12 mm thick on brickwork / C.C. work including a finishing coat of neat cement punning with 2.20 Kg of cement per sqm in substructure as per technical specification Clauses 613.4 & 1204.

259

218

56540

... More
Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe or PVC pipe ( 110 mm OD of 6.0 Kg/cm2 pressure ) extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7

150

328

49290

... More
(v)Providing concrete for plain concrete M-15 (using jhama brick aggregate) in open foundations complete as per drawing and technical specifications clauses 802.803,1202 & 1203

-

-

-

... More
In Foundation below GL

41

8218

336975

... More
In Coping

10

8218

82189

... More
Gravel / Soil - Aggregate Base ( Table 400.2 ) using well burnt brick aggregate.

-

-

-

... More
Construction of gravel / soil - aggregate base by providing well graded material ( using jhama brick aggregate ), Spreading in uniform layers with Tractor mount grader on prepared surface, mixing by mix in place method with Tractor mount rotavator at OMC, and compacting with three wheel 80 - 100 kN Static roller to achieve the desired density, complete as per Technical Specification Clause 402. Grading A

-

-

-

... More
For Grading - II Material ( jhama brick aggregate )

858.25

5300

4549326

... More
(2 ) WBM Grading - 3

-

-

-

... More
Providing , laying , spreading and compacting Jhama Brick aggregates of specific sizes to water Bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel rollar 80 - 100 K.N in stages to proper grade and camber, applying and Brooming, Binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density grading - 3 as per technical specification clause 405.

-

-

-

... More
( A ) By mechanical means

468.14

7265

3401271

... More
Prime coat.

-

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means as per Technical Specifican Clause 502

-

-

-

... More
( I ) Low Porosity.

6180

45

281808

... More
Tack coat

-

-

-

... More
Probiding and applying tack coat with Bitumen Emulsion ( RS - 1 ) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with hydraulic broom as per technical specification Clause 503.

6180

15

95172

... More
20mm thick open - graded premix carpet using Bituminous ( penetration grade / modified bitumen ) Binder.

-

-

-

... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 KN Static rollar capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or type D as per Technical Specification Clause 508.

-

-

-

... More
By Mechanicall Means with Bitumen(S-65)

6180

251

1553034

... More
Seal Coat Providing and laying seal coat sealing the voids in a bituminious surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Techinical Specification Clause 510 ( A ) By Manual Means.

-

-

-

... More
Case - Iv : Type D

-

-

-

... More
( II ) Bitumen (S-65)

6180

51

318888

... More
Providing and fixing of retro-reflectiorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle Iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M15 Grade cement concrete 450mm x 450mm x 600mm, 600m.m below ground level as per approved drawing and technical specification clause 801.

-

-

-

... More
600mm equilateral triangle aluminium sheating

46

2785

128147

... More
600mm Dia circular aluminium sheating.

12

2899

34790

... More
800×600 mm rectangular aluminium sheeting

2

3075

6150

... More
Reinforced cement concrete M15 grade Kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Techinical Specification Clause 1703

-

-

-

... More
(ii) Ordinary Kilometer Stone (precast)

4

3317

13270

... More
(iii)200 m stone (Precast)

10

871

8710

... More
Construction of RCC guide posts of 250mm dia and total 600mm long, ( 300mm below G.L) M15 grade ( with jhama brick aggregate) cast in situ with 20mm nominal size aggregate, true to line and grade, tolerence of vertical RCC Posts not to exceed 1 in 500 as per drawing and technical specification clause 1401.6. ( A ) In ordinary soil.

40

501

20048

... More
Boundary pillar ( with pcc M15 grade using Jhama Brick aggregate and reinforcement )

-

-

-

... More
Plain cement concrete M15 grade ( Using Jhama brick aggregate and reinforcement ) boundary pillar / local stone of standard design as per IRC : 25 fixed in position including finishing and lettering but excluding painting as per drawing and technical specification clause 1704.

22

818

17998

... More
Providing and fixing 'Logo' of PMGSY Project

-

-

-

... More
Providing and fixing of typical PMGSY informatory sign bord with Logo as per MORD specifications and drawing. Three MS plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25 mm x 5 m size on back on edges. The lower plate will be welded with MS Angle Iron frame of 25mm x25mm x 5mm.The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mmx75mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450 mmx450x600 mm .600mm below ground level. the top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All MS will be stove enameled on both sides. Lettering and printing arrows border etc. will be painted with ready mixed synthetic enamel paint of superior quality in require shade and color. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1(Drg at Annexure:-lll)

2

12417

24835

... More
Providing and fixing 'Citizens' Information board of PMGSY / Bharat Nirman Project

-

-

-

... More
Providing and fixing of typical Citizens' Information Board with Logo as per MORD specifications and drawing. Two MS Plates of 2.0 mm thick,duly welded with MS flat iron 50 mm X 5 mm size on back on edges. The flat iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 76.1 mm OD (horizontal) and 2 nos. 76.1 mm OD (Vertical) steel tube posts ( as per IS : 1161- 1979, Medium class) duly embedded in cement concrete M-15 grade blocks of 600 mm X 600 mm X 750 mm, 750 mm below ground level. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube and flats will be painted with primer and two coats of epoxy paint as per drawing and specification Clause 1701 and Annexure 1700.1

2

16462

32925

... More
Providing and fixing 'Maintenance board of PMGSY

-

-

-

... More
Providing and fixing PMGSY Maintenance board as per MORD specifications and drawing, consisting of 75 mm square or 75 mm steel tube frame welde4d with 25 mm MS flat iron strips, 4 Nos horizontally and 2 nos vertically, two nos. CR/GI plates 1.6 mm thick welded with the MS flats, all MS will be stove, enameled on all sides, painting the boards and lettering as pare drawing with ready mixed synthetic enamel paint of superior quality in required shade and colour , fixed in ground Works und with M.15 grade concrete (with jhama aggregate) 60x60x75 cm (depth) including cost of excavation, concrete, all materials, labour and carriage.

2

16462

32925

... More
Earthwork in excavation for foundation of structures upto 3m depth as per drawing and technical specification clause 1104, including setting out, construction of shoring and bracing, removal of stumps and toerh delterious matter, dressing of sides and bot

-

-

-

... More
(A) Ordinary soil (for RCC pipe culvert)

152.67

482

73602

... More
(B) Ordinary soil (for pillars for inscribing structure)

0.36

482

174

... More
Plain Cement Concrete M10(1:3:6 nominal mix with jhama brick aggregate) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109

-

-

-

... More
(i) Below Head wall

3.28

8010

26275

... More
(ii) Below cement concrete NP3 pipe

11.69

8010

93645

... More
Providing and laying reinforced cement concrete pipe NP3 with collar for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protectiion works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.

-

-

-

... More
(i) 1000 mm dia

20

10881

217628

... More
Brick masonry work in cement mortar in Head walls complete excluding pointing and plastering as per drawing and technical specification clause 1109

-

-

-

... More
(i) Brick masonry in 1:4 cement mortar

32.74

8600

281580

... More
Plastering Head walls with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specifications Clauses 802,803,1202 & 1203

37.51

218

8188

... More
Providing concrete for plain/reinforce concrete (using jhama brick aggregate) complete as per drawing and technical specification Clauses 802,803,1202 & 1203.

-

-

-

... More
(i) RCC grade M15 in pillars for inscribing structure number

0.32

8218

2630

... More
Supplying fitting and placing HYSD bar reinforcement (Fc-415) in substructure completed as per drawing and technical specification clauses 1002,1005, 1010, and 1202.

-

-

-

... More
(i) In pillars for inscribing structure number

0.02

91593

1832

... More
Providing and laying cement conc block of size as per table 1300 1 cast in situ and made with nominal mix of M15 grade cement conc (using jhama brick aggregate) as per drawuing and technical specification clauses 1301

2.69

8383

22551

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered/ concrete surfaces as per drawing and technical specification on pillar inscribing structure number.

3.2

118

379

... More
Printing new letters and figures of any shade with synthetic enamal paint iblack or any other approved colour to give an even shade as per drawing and technical specification Cl:1701, in English or Roman.

200

-

160

... More
Earthwork in excavation for structures as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other delterious matterial and disposal upto a lead of 50m. , dressing of sides an Ordinary Soil up to 3 mtr depth.

509

514

261779

... More
Filling in foundation

-

-

-

... More
Filling in foundation trenches as per drawing & technical specification clause 305.3.9 earth filling(for marshy soil)

349

329

115065

-

-

-

... More
Bored Cast-in-situ piles 1200mm dia, M-25 grade(using fine sand) RCC pile excluding reinforcement complete as per drawing and technical specification and removal of excavated earth with all lifts and lead upto 1000m

216

18155

3921610

... More
Reinforcement for Pile

-

-

-

... More
Supplying , fitting & placing HYSD bar reinforcement in foundation complete as per drawing & technical specification clauses 1000 & 1202.

53

97428

5163695

... More
PCC (M-15) Providing concrete for plain/reinforced concrete in open foundation complete as per drawing & technical specification clause 802, 803, 1202 and 1203 Nominal mix(1:2.5:5)

10

10018

100180

... More
RCC M 25 in pile cap Providing concrete for plain/reinforced concrete in open foundation complete as per drawing & technical specification clause 802, 803, 1202 and 1203 RCC M25

160

11270

1803248

... More
Reinforcement for pile cap supplying, fitting & placing HYSD bar reinforcement in foundation complete as per drawing & technical specification clauses 1000 & 1202.

12

97428

1169138

... More
RCC M-25 in Abutment/Pier

-

-

-

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification clauses 802,804,805,806 1202 and 1204

-

-

-

... More
RCC grade M-25

-

-

-

... More
(b) For height above 5m upto 10 m

44

12354

543576

... More
Reinforcement for Abutment/Pier

-

-

-

... More
Supplying,fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specification clauses 1002,1005,1010 and 1202

4

97700

390801

... More
Weep Holes

-

-

-

... More
Providing weepholes in brick masonry /stone masonry, plain/reinforced concrete abutment,wing wall ,return wall, with 100mm dia AC pipeextending through the full width of the structures with slope of 1(v) : 20(H ) towards drawing face complete as per drawingss

12

350

4206

... More
Bacckfilling

-

-

-

... More
Bacckfilling behind abutment, wing wall & return wall complete as per drawing & technical specification clause 1204.3.8 sandy material

728

2456

1788332

... More
Filter Media

-

-

-

... More
Providing & laying filter media with jhama brick aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil & bigger size towards the wall & providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8

33

4135

136465

... More
Elastomeric Bearing

-

-

-

... More
Supplying,fitting and fixing in position true to line and level elastomeric beaing conforming to IRC:83(part-II) section IX complete including all accessories as per drawings and technical specification clause 1207.1

65280

1

84864

... More
Bearing with Steel attachment

-

-

-

... More
Supplying,fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) Section IX complete including all accessories with additional steel fixrures as per drawings and technical specification with all lifts and lead

43668

1

69869

... More
Expansion Joint

-

-

-

... More
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer / supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation as per drawings and MoRT&H Technical Specification Clause 2607.

14

13380

187320

... More
RCC Superstructure

-

-

-

... More
Providing and laying reinforced cement concrete in superstructure as per drawings and technical specifications clauses 800,1205.4 and 1205.5 Using Concrete Mixer RCC M -25 For height from 5m to 10m

143

12641

1807777

... More
Reinforcement for Superstructure

-

-

-

... More
Supplying ,fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications clauses 1002,1010 and 1202

26

99536

2587946

... More
Handralling

-

-

-

... More
Construction of RCC railing of M-30 grade in cast in situ with 20mm nominal size aggregate, true to line and grade, tolerance of vertical post not to exceed 1in 500, centre to centre spacing between vertical posts not to exceed 2000mm including reinforcement.

74

2769

204936

... More
Wearing Coat

-

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including all formworks & required reinforcement complete as per drawings & MoRT&H technical specification Clauses 2702. (including centering, shuttering, staging etc. but excluding reinforcement ).

16

16857

269726

... More
Drainage spout

-

-

-

... More
Providing and fixing in position drainage spout complete as per drawing(SD/205) and MoRT&H technical specification clauses 515,2705

12

6434

77212

... More
Pcc below approach slab

-

-

-

... More
PCC M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specification clauses 800 and 1211 PCC grade M-15 a) Nominal mix (1:2.5:5) (Hand mixing)

7

9391

65743

... More
Approach slab

-

-

-

... More
Reinforced cement concrete M-25 grade approach slab including reinforcement & formwork complete as per drawing and technical specification clauses 800 & 1211

18

16231

292160

... More
Routine Load Test

-

-

-

... More
Routine load test including supply of all tools & tackles required for testing, supply of kentledge, making all arrangement for testing, erection of kentledge, recording data analysis the data

1

302639

302639

... More
Painting of RCC Bridge

-

-

-

... More
Painting of RCC Bridges with two coats of water proof cement based paint of approved make(Berger /Asian/ICI/ Jension & Nicholson / Shalimar) including removal of dirt, cleanig the surface by brushing, watering etc. complete as per direction of Engineer.

447.33

118

52919

... More
Maintenance

-

-

-

... More
Total for 1st year maintenance (including 18% GST)

2.06

127168

261966

... More
Total for 2nd year maintenance (including 18% GST)

2.06

147171

303172

... More
Total for 3rd year maintenance (including 18% GST)

2.06

232900

479774

... More
Total for 4th year maintenance (including 18% GST)

2.06

284299

585656

... More
Total for 5th year maintenance (including 18% GST)

2.06

333912

687859

... More
● The upgradtion cost is inclusive of GST @ 18% and ● Maintenance amount is pre-specified by the authority as mentioned above.

-

-

60074408



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.